Joint Meeting of the Committee of Infrastructure and Board of Public Works – September 30, 2025
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Joint Meeting of the Committee of Infrastructure and Board of Public Works – September 30, 2025
The Committee of Infrastructure and Board of Public Works held a joint meeting on September 30, 2025, at 5:30 PM at the Board of Public Works Building. The meeting was chaired by Alderman at Large Michael Bryan in the absence of Alderman O'Brien. Commissioners and aldermen were present, along with Administrative Service Director Tim Cummings and Director of Public Works Lisa Photo. The meeting covered updates on the DPW Garage Project and the Wastewater Treatment Facility, discussions on a cost-benefit analysis for the garage project, and approval of several invoices.
Consent Calendar
- Approval of Minutes: The minutes of the August 28, 2025 meeting were approved unanimously by voice vote.
Discussion Items
- DPW Garage Project Update: Owner's Project Manager Joe Sullivan presented an update. The project team meets weekly, coordination with pre-engineered building contractor Boat Construction is ongoing, and zoning/planning board submissions have been made by civil engineer IMEG. Cost estimation is being refined to minimize costs. Sandborne Head is assisting with permitting due to site conditions. Hydrant flow tests have been completed. Next steps include finalizing cost estimates and equipment pricing, continuing collaboration with Boat Construction, and filing permits. The project timeline aims for construction start at the end of spring/early summer 2026. A bond of $5.5 million is pending in committee, and a presentation to the full Board of Aldermen is anticipated in early November.
- Cost-Benefit Analysis Discussion: Director Cummings raised the concept of a cost-benefit analysis for the DPW garage project, which was suggested by some aldermen. Alderman Clea emphasized the need to demonstrate savings from vehicle longevity and reduced maintenance. Alderman Dow highlighted current conditions (e.g., equipment clipping garage entrance) and the benefits of improved conditions on equipment and staff safety. Alderman Sutherland requested a detailed analysis showing how soon savings would pay for the $54 million building, including preventative maintenance costs over 20-30 years. Director Cummings noted that the cost of operating the current facility versus the new one should be compared. Commissioner Shea added qualitative factors such as air quality, lighting, working conditions, and potential for solar panels. The discussion concluded with general agreement on the need for a comprehensive analysis.
- Wastewater Treatment Facility Update: Joe Sullivan reported on the wastewater maintenance facility project. A design charrette was held in June with stakeholders, and a program has been developed. The site is occupied, and operations cannot be disrupted during construction. Vehicle circulation, traffic analysis, and conceptual floor plans are being studied. The facility will include vehicle storage for expensive equipment (e.g., back trucks) to extend their longevity. Funding comes from wastewater fees. Alderman Sutherland asked about potential disruption to nearby residences; Director Cummings and Director Foto assured that abutters will be notified and public forums held. The city has experience with similar projects (e.g., school construction near residences). The design is being refined to minimize impact.
Key Outcomes
- Approval of HKT Architects Services (DPW Garage): Motion to approve HKT Architects Incorporated services through 50% construction documents for the DPW Garage Project in the amount of $444,058. Approved unanimously.
- Approval of Left Field LLC OPM Services (DPW Garage, August 2025): Motion to approve Left Field LLC owner's project manager services through August 31, 2025, in the amount of $26,500 for the DPW Garage Project. Approved unanimously.
- Approval of Left Field LLC OPM Extension (DPW Garage, November 2025): Motion to approve and extend Left Field LLC OPM services through November 2025 in the amount of $53,000 for the DPW Garage Project. Approved unanimously.
- Approval of Left Field LLC OPM Services (Wastewater Facility, August 2025): Motion to approve Left Field LLC owner's project manager services through August 31, 2025, in the amount of $26,500 for the wastewater treatment facility. Approved unanimously.
- Next Meeting: A tentative joint meeting was scheduled for Thursday, October 23, 2025, at 5:00 PM.
- Adjournment: The meeting adjourned at 5:55 PM following a motion.
Meeting Transcript
That's assigned to the TV. I'd like to call a joint meeting of the Committee of Infrastructure and Board of Public Works to order. It's September 30th, 2025. It's a joint meeting being held at the Board of Public Works Building. It's been notified in two places in accordance with the RSA. It's and it's uh 5 30 p.m. And with the clerk, please call the rule. Absolutely. Umortu here. Commissioner Manny Especially. Presented. Commissioner Matthew Greg. Commissioner June Lemon. Here. Commissioner Paul Shea. Present. Alderman Chris Timeda? Here. Alderman John Sutherland? Here. Alderman Clea is here. Alderman Dad? Present. And Alderman at large, Michael Bryan. Alderman O'Brien couldn't be here this evening, so I'll be chairing the meeting. Also in attendance is Tim Cummings, administrative service director, Lisa Photo, Director of Public Works. Okay. General introductory remarks. They're not they're not at this time. Public comment. There's no public, so the none approval of minutes. Alderman clean. At this time, I motion to approve the minutes of the August 28th, 2025 meeting. Okay, the motion on the floor is to approve the minutes of the August 28th, 2025 meeting. Place them on file. All in favor signify by saying aye. Aye. Opposed. Motion carries. General progress update. DPW Garage Project. I'd like to recognize Director Tim Cummings. Thank thank you, Ms. Chairman. I'm actually going to hand it right over to Joe Sullivan, the owner's project manager, so he can walk us through uh project status update. Great. Thank you, Mr. Cummings. Uh I'm gonna give you a brief update with uh both projects. It's uh division of public works and the wastewater treatment facility.