0:02Alright, everyone, we're gonna go ahead and get started.
0:05Welcome to the Thursday, May 7th meeting of the City Council Business and Community Affairs meeting.
0:11Today we have one item on our agenda, and that is a update and discussion regarding the scope of the plans funded by the Pro Housing Grant Award, including impacts on pre-approved plans, parking, and minimum lot size regulations.
0:27And I believe we have a brief presentation from staff.
0:35So I think we would just wanted kind of an update on where we are on these items.
0:40So as you guys know, we got the ProHusing uh grant.
0:44So we have until September 2030 to use all of those funds, and we have four projects.
0:50So we're starting on the first two, which is uh the zoning and subdivision regulation code update and the parking study.
0:58So uh for the first item, the pre-approved plans, that is uh well for anyone who might not know.
1:05Those are uh essentially like architectural plans for building permits where someone can come in and pretty much have a set ready to go.
1:13That's kind of a design we want to see in an area.
1:18Um so it's it's quicker, it's supposed to be like a more streamlined process and save them a little bit of design cost.
1:25Um we will be putting for that out in the first part of 2028 according to our action plan that was approved by HUD.
1:35So we pretty much finished the first two projects and then move into the pre-approved plans and the affordable housing action plan.
1:43And so it's a four-year grant, if I understand that right.
1:46Essentially, we lost a lot of time with the federal shutdowns.
1:51So three and a half year.
1:58Um yeah, so we did have to kind of push everything back essentially a year.
2:03Um, and then we're giving ourselves a little bit of wiggle room at the end just to make sure we get all of our reporting finished and are totally closed out by September of 2030.
2:14Um for parking, there's I know the uh parking maximums have been of interest, and we've discussed that before.
2:22So our parking study, uh, they actually started collecting data last week, last Wednesday, I think, over at downtown campus corner, kind of the center city area.
2:32We wanted to get started on data collection before school let out.
2:35So they started that area.
2:38Um they're gonna come visit in June, probably end of June, and then we'll do more data collection in the fall when school's back in session.
2:51Um so we we have heard a lot about how um parking for residential can impact affordability.
2:58So they'll be looking at um the effects of that and um just kind of looking at how parking is utilized throughout the city where there's too much pressure, maybe where it's not as much of an issue.
3:11Um I want to say there's four study areas, like data collection areas that they'll do.
3:20He's my my bud on this project.
3:22Um so we wanted to take like a more holistic view of parking instead of just trying to pick some I just say like arbitrary or random numbers for maximums.
3:35Maybe there's maximums we can put in place plus XYZ to really hit all the goals that we have, not just parking.
3:45Um, and then minimum lot size.
3:48We've talked about that a couple of times.
3:51Um, and we did hear about it when the consultant was here this week.
3:56Um it is radical is probably not the right word, but it is uh kind of an out there concept, a new concept.
4:04There's not really cities around the country that have done that yet.
4:07There's a lot that do are looking at it right now, even just with Clarion, the consultant we're working with, they said another city um that they're working with is doing no minimum lot size but a minimum lot width.
4:20So we'll be exploring it and we'll see.
4:23We might not end up with that.
4:25Um, because we kind of have to balance the people who want that with people who don't.
4:30So we might end up with the compromise somewhere, but that's the the quick rundown of where we are.
4:38On the uh minimum lot size piece, uh my my preference uh that that be zero.
4:47We have no minimum lot size because we have other controlling factors like frontage, lot width, there's other things that come into play that are requirements, and so I think if you're able to satisfy those set of requirements, that the overall lot size number should be there, should be no requirement there.
5:05So that's that's kind of my approach on that one.
5:08Um on the parking piece, and anybody chime in at any time or just giving my thoughts here.
5:13Uh the parking piece, you know, we we abolished parking minimums a few years back, and so they're now recommendations, but those recommendations are still very bloated.
5:23Like those numbers are still the old numbers from the 1954 zoning code, and so even though we don't have any parking minimums, I'd love to take those numbers and actually make them more based in reality.
5:34Um, and then when we apply a maximum, I've looked at that as almost a soft cap.
5:40So to say that yes, here is our here's our threshold for how much parking we want you to put in.
5:44If you want to go over that, you're allowed to, but there's some fee or extra requirement that you've got to you've got to compromise, or we've got to um reconcile to base go over that soft gap.
5:56So um customer grant.
5:58Uh I don't hate the fee idea, but where would the fee go to?
6:02I've always thought stormwater.
6:04I think that's an excellent place for it to go.
6:06Just a great way to like, hey, if you want to put in all this impervious surface, that's fine.
6:10We've got to offset it somehow with the stormwater solution.
6:13So let's put that money into I mean, I don't know, we don't have stormwater utility.
6:17Ideally, that's where it would go, but uh I think just even a project by project basis.
6:22Something even on that project, just say, hey, we're we're going over, but we're gonna provide an extra stormwater solution.
6:29It's kind of like there's a there's a compromise there.
6:32So if you actually had a fine that was generating money directly for stormwater.
6:42The thing that I worry about the most on this idea is getting preempted by the state.
6:47Well, and so I don't want to call it a tax.
6:49I don't want to call it a well that's what I'm thinking too.
6:52Like you kind of got an apron system kind of like the NBA does.
6:57First apron, second apron, but then that goes directly into a stormwater something, and at that point, you could have a trust and you could issue revenue bonds on.
7:09I mean, it would be way far out, but at least it would give a working mechanism that would, you know.
7:16That's sort of that's way far away, but just a they also kind of throw around with the consultant, like maybe if you want to go over, then you have to put some of those LID techniques on your own property.
7:29So you're you're solving the problem before it even really becomes the public problem.
7:35Um that's part of the good part of doing it with like a parking expert for the consultant team.
7:43Um there's two companies we're working with.
7:45It's Nelson Nygard and Parcolytics.
7:49Um so they know all the they should have all the ideas, I think, and just kind of help us figure out what works best here and what works with our code and well, that's why I was willing to kind of punt these ideas a little bit and get it get it out of council's hands and get it to a consultant's hand to like look give us a recommendation and then we could say yes or no to that recommendation.
8:11Also, do we get to discuss uh some of the things we talked about in our small meetings with the consultants in this one?
8:18Uh I we can, I think so, yeah.
8:20As long as it's related to the three things on the agenda.
8:22This would be in the housing part, because we talked about stormwater and I brought up like you know, certain parts of town are a little hampered than others when it comes to that.
8:33And I asked maybe for like a phasing in um when zoning changes is when the infrastructure catches up.
8:42Uh because I do want to get there and do info, but again, not having a stormwater utility fee is a big deal.
8:49And you know, I think about the noun and how they had to over-engineer uh to address stormwater issues that have been kind of neglected, and or you've got a project on the other side of the university.
9:03I think it's off park that wasn't done well, and so it caused extra issues.
9:08So I think the parcel by parcel method is not it.
9:14It's what we have right now, but I think we can work towards a better, like a holistic approach, like you said.
9:24Uh so minimum lot sizes.
9:26Um I'm definitely on board with the zero, but with uh some minimum width or other ways to address it.
9:37Um in regard to specifically new developments.
9:43I'll just can't go back.
9:44And in a lot of cases, it's hard to go back, but um new developments, uh that being the case.
9:52Or, you know, we talked about just reducing it from 6,000 and I thought at the very minimum we should cut it in half for sure.
10:02But I'm still in favor of zero when it comes to new development and just a whatever a recommended one might be.
10:10Well, that's why I mean I I prefer zero as well because we don't know what kind of creativity the building market's gonna provide, like you know.
10:16If we say a thousand, well, there's a there's a parameter they gotta work.
10:19If we say zero, then that's all the creativity in the world is possible.
10:23So I think we should allow people to um and just yes, and uh I mentioned it when we were talking to the consultants that some of our best neighborhoods, best commercial districts were developed before they were minimum lot sizes before there were any zoning.
10:43Um I was like, I I'm supportive of having zoning, but generally the best parts of every city are the older the places people love the most tend to be the old parts that were developed before we tried to regulate everything.
10:57Yeah, and that our best some of our favorite best buildings on Main Street would not be you couldn't build them today without going through this whole process and coming to city council like we've seen a couple of them do.
11:10But those were all built and they're being used a hundred years later for businesses right now.
11:17And so um for the for continuing to pursue that, and if if anything though, if not the full elimination at very minimum cutting it in half and going from there and seeing how that goes.
11:29And then parking minimum, same thing.
11:31Um did it for commercial, which I think has had a really big impact positively that we've seen.
11:39But we've still seen some developments come forward that are that are still going with the old.
11:44And that's and by choice, choice it's sometimes you can talk them out over, yeah.
11:49Exactly, like um that's less pavement, less.
11:52Um so I do want to continue to look at that, but also want to um look at expanding the allowance of street parking.
12:03Um I've been to many bigger cities that are older also that have their arterial streets, have street parking.
12:11Yeah, they're five lanes wide, they've got they've got high moving traffic, but they have parallel parking on both sides of them.
12:18Yeah, and some of them they use those as lanes when they're not there, like there's only parking allowed in certain times, and then other times that's a travel lane, and then after a certain time it's parking and it's parallel parking.
12:32And it's on a street like West Lindsay Street or West Main Street or 36, it's on main roads.
12:37Northwest 23rd Nokia City is like that.
12:39We don't have to limit parking to just parking lots.
12:42I think we can expand street parking to all streets in more than uh well, you know, for the relative matter.
12:50But uh, but yes, so that being a thing, so maybe we're not relying so much.
12:55Businesses aren't relying on individual single parking lots if there's more publicly available street parking options, like we do in Center City where we say you can absolutely count your thing toward you you put the street parking in, and even though it's not guaranteed it becomes public, you that can still count towards your thing.
13:15So continue to explore that.
13:17Well, and the on-street parking, you know, it provides a lot of extra benefits aside just from the parking space.
13:22I mean, just having the buffer with the sidewalk.
13:24Absolutely, there's a lot of added some of those more suburban areas of Norman where it's big wide street and there's a little s tiny sidewalk up next to it and there's a parking lot and it feels really uncomfortable to walk.
13:36Well, what if there was street parking?
13:38That would make those areas much more comfortable for people to be walking about.
13:42I think, and potentially do some traffic calming, perhaps.
13:46Yeah, force help reduce some of the severe accidents, crashes that we see at major intersections in Norman, which we all know about.
13:54Um so very interested in not just parking minimums and or maximums, but expanding where we think about parking and especially street parking.
14:04And then um I understand what Council Marinka was kind of getting at, or like so aren't able to do a utility yet, but like a stormwater trust where we can at least that's the dedicated fund for stormwater.
14:20It has just to get something off the ground, and then maybe that and that could turn into the utility if voters ever are willing to be interested in that, and that's where all stormwater funds go into, and we know where it's going out, and I think that could be well.
14:43You know, if it's in a if we're looking at some doing a stormwater upgrade that's in a TIFF district, then we can use the TIFF as the backstop for the financing, and then the bonds get issued on like a tenure basis where we don't have to start paying until year eight.
15:00So it gives it eight years of time for money to build up before we're actually making principal and interest payments back on the bond.
15:05So it's kind of it would be kind of a way to back into something like that.
15:11But we've seen that model be pretty useful on some of the other projects that we wanted to do.
15:17And if it's generating revenue and it's not a general obligation bond that we have to tax people on, then we would get more support.
15:25Already dedicated to it from the general fund.
15:28And then any fees that we get from stormwater.
15:31So I like that idea, actually.
15:33So the only flaw in it is that you know those kind of projects are not a consistent, it's not a consistent revenue, like parking fees would be daily churn.
15:41Well, but if you're talking about having an apron system and you got new development, people want to pay a luxury price a luxury tax for parking, then after six months you can annualize what that is generating based on the projected development.
15:53Like there's all sorts of things that will go into that.
15:57Um I think that's uh you know a good stepping stone idea and a way to get just to get something get farther down the road.
16:04I think everybody agrees that you know a stormwater utility is a must.
16:07I mean it's it's pr basically a requirement at this point.
16:10We've got to do those so um getting it done by another name, I think is it may be easier to to have a trust and a fund where it's got money already in it to get voters to be like, well, there's already skin in the gives them seat.
16:28I I just want to make sure we stick into the agenda.
16:31All right, housing parkings.
16:33It's parking, it's it's parking.
16:39Yeah, the housing part is.
16:42Can you imagine just pulling up on Alameda and parking your car on the curb?
16:46Like right in front of little Caesars and just going to do some.
16:54Um with the pre-approved plans, are we talking essentially pattern zoning or pattern book type of plans?
17:01Uh pattern book, yeah.
17:03Uh I think we decided to forego the zoning piece of it and just kind of make it a program at itself.
17:09Um, so we're talking patterns for like ADUs.
17:15Would it are we we'll probably pick a couple like go for a couple design types for like maybe three typologies?
17:23We'll we'll probably start pretty small because it'll be I mean the we don't have a whole lot of funding for it, and we obviously can't really go over.
17:31Um so would it be like detached, attached, and or probably like an ADU a duplex and maybe like a triplex or something, showing people how they can do it in a design that we like.
17:48And when you say an RFP, I'm sorry, we finished.
17:55So you were saying like an ADU does it when you say that like your funding or limited by the typology.
18:02I so within the ADU would it be like attached, detached, and if it was a duplex, it'd be like this is what a duplex can look like when it's a duplex, or it could be um kind of like what we saw.
18:15I forget the name of the mats, but oh uh Matt Petty and Matt Hoffman.
18:19What was their business called?
18:22So we always say the mats because I'm just thinking about how they had flexibility in those designs.
18:28Uh are we talking like patterns, a pattern book like that that supports kind of, but it won't be as expensive, probably because it also comes with like the internal process.
18:39So the all of the money won't go just to the designs.
18:43We'll also have to kind of gotcha.
18:46It's that money goes away quickly.
18:49Um and after going to sessions at a few conferences about it, it's and Logan's actually going to is it CMU next week in Arkansas.
18:57There's like a whole day about this.
19:00So Logan on the planning staff is gonna go and that crazy.
19:07So anyway, after listening, it a lot of people who have this already, it's kind of if you start with too much, it's just unwieldy.
19:16Yeah, and um, it's just it it's a big undertaking.
19:22Um but that isn't to say like you start small and then maybe in another budget cycle might add to it.
19:31So uh I'm trying to think where it is where they're on they literally call it like 2.0.
19:36I can't remember where it is now.
19:39But they're on their second phase of it.
19:43I remember they had done maybe one up there.
19:45I feel like country's got a pattern book too.
19:48It's probably clear more.
19:49And what council member grants referring you're referring to like a modular setup where like you know, you could have an ADU, but then if you stack two of those ADs together, you get a duplex.
19:58You can stack two on top of each other.
20:01There's it's like a kit of parts almost where you can start combining different maybe pre-approved there yet.
20:09Because we gotta get through the other two first.
20:14Well, when you describe RFP, what it what do you mean exactly by that?
20:18Who is the who would be we'd be seeking proposals from?
20:21Hopefully local architecture.
20:23Okay, so that's it's not a consultant that's gonna come in and do that piece.
20:26It would be we'll see.
20:27It might have to be kind of a hybrid combo, but we admittedly have not written that yet.
20:34Because we want to make sure it's stuff that also kind of supports the new code.
20:38So I won't be sitting in this chair in 2028, so it's our goal for it to be more local.
20:47That would be great.
20:48I think that would be good too because local would understand what the challenges are.
20:53And we've seen again just at conferences, but like somewhere a city hired someone to do this and it was where it snows a lot, and they didn't design for like snow loads and stuff, so they were unusable.
21:07So I think that's it.
21:09Why you have to have local.
21:18Is there anything else for anybody?
21:23So where would I go to find that that agreement that came back from you got the grant?
21:31Does that make sense?
21:32Uh like our action plan that got approved.
21:34I imagine it's a promise for promise, right?
21:36We submitted an application.
21:41And or but, I don't remember when they came back and there was an agreement when that was that's on our website.
21:47Uh it's on the if you go through the C D BG pages, there's a pro housing page.
21:52Pretty much everything we've done is posted there.
21:55And so this particular grant was worth like a year ago.
21:59Yeah, we got the award uh January of last year, maybe February, and we didn't get under contract until was that September or December.
22:11So that's what September maybe?
22:14With HUD was approved in December of 25.
22:17And we signed a contract with HUD in like September, maybe.
22:21I can't remember what I think.
22:22I can't remember exactly.
22:23Sorry, I should know that.
22:26It has been a while.
22:26Yes, and then the action plan took like forever because they were closed and we're rolling, here we go.
22:34Well, we went, you know, Councilmember Bruce, just so you have the history, and when we went through the whole aim process, um, that's what we kept hearing from the consultant over and over is that it's great if you do this comprehensive plan, but if you don't do those the zoning ordinance and the subdivision regulations as a companion piece, it's basically like you didn't do anything.
22:50So right now we've got a lot of conflict between the comp plan and our zoning ordinance and trying to reconcile the two, essentially with this grant.
22:59Yeah, I get the the the zoning and the parking, and there are two other areas.
23:04You mentioned affordable housing, I think it's the third.
23:07Yeah, there's uh so we're doing the zoning and subregs and then a parking study, an affordable housing action plan and the pre-approved plan book.
23:19And then and then you know, from for my background, grants DOD.
23:26You gotta produce this product.
23:29I mean, and best faith effort.
23:33So when when that didn't happen, that grant would be reflected on for future grants.
23:37Does that make sense?
23:39And I don't even know the oversight program related to hey if we get a report card at the end of a grant from the you know, the housing department about okay, they got an A on this one.
23:49So we can put past performance release the grants, where you can give them a plus, that common when it comes time for next year or the year after, or whatever grant we may have.
24:00I don't know that rule.
24:02Uh I don't did they do things like that with HUD?
24:07Are you talking do you talk about the compliance and the in-product?
24:10Anytime the federal government gives uh contracts or grants, there's a past performance criteria, usually in this mandate.
24:18You have to look at the past performance of that organization as it relates or reflect with the the funds you gave them.
24:24And that's used for future terminations with awards.
24:27So if you perform poorly on a grant, and if the if the agency's doing their job, they'll say no, they're not getting another one.
24:34Is that does that make sense?
24:36Yeah, and our deliberals for these are the plans, and as far as further than that, I don't know what HUD will ask of us yet.
24:45So they should share that, share that.
24:46Hey, your your past performance rating for that, you know, in the aggregate for your grants or individual grant.
24:52This is your you received.
24:54Because you're gonna get a path performance rating related to future grants.
24:58Yeah, no, I get what you're saying.
25:00And I think we've been really successful in getting CDBG money and HUD money.
25:03And so I think we've I don't want to I I would guess the track record is something on 30 years.
25:08Uh how long have we been getting dollars?
25:11CDBG money since 1975.
25:12Okay, so funds since the 90s.
25:15But we are entitlements, so we don't apply for those.
25:17This grant, this pro housing grant, um, pathways to removing obstacles to housing, what is one we actually applied for.
25:23So since I've been here, this is the first one that you know we went out and sought.
25:28Um, but we were so excited with you know the aim process, and we wanted to keep that momentum going, and so uh staff wanted to apply for this.
25:35So um we'll have to see as the process goes what they say, I guess.
25:41And this was the second year they've done this program, so we're kind of the second batch of guinea pigs for yeah, the HUD Pro housing has been cut in half almost.
25:51So um a lot of the HUD staff is new as well.
25:54So usually on a grant, you'll have your grant administrator, and it'll be a name, and then you can call the questions on your grant, and so it can take her a month to get back to us.
26:04And there are quarterly reports, right?
26:07So HUD will be updated quarterly by Tara.
26:10Yeah, I have to do quarterly reports, and uh it takes her about a quarter to get to them.
26:15I should have laughed at that.
26:21It's a good data point to have if you have grants and money's coming, you know, they're gonna be an assessment on performance, so how is that used in the future for sure?
26:28Well, we want to make sure that we uh can secure as many of these grant opportunities in the future as possible.
26:33So I agree wholeheartedly, you got knock this one out of the park.
26:36So I think uh I've got full faith and trust in city staff.
26:41I've seen you guys work miracles before, so I think I'm good.
26:45Roman, were you did you have something you want to say?
26:47Okay, I saw the hand going up.
26:48I don't know if it was a good meeting with the consultants the other night.
26:52About we talked a lot about zoning, so and uh how that relates to affordable housing and uh density and sales tax generation, more people, less infrastructure obligation.
27:06Yep, is the direction that we need to go.
27:09Yeah, the consultants seemed like they were very on top of things, less expensive infrastructure obligations, more people, yeah.
27:17Yeah, it's a great way to put it.
27:20This is good, awesome.
27:23Well, I just wanted to get everybody an update on those things.
27:26I know we've talked about them several times over the years, but now that we've got a consultant that is actually lean the charge on this, um, I think we should get to some good stuff here pretty soon.
27:36We should have our existing code assessment.
27:39Um probably end of the summer.
27:41So it'll be posted for the public to check out, and we will keep you informed.
27:48Thank you very much.
27:49All right, if there's uh nothing else, this meeting is adjourned.