Speaker numbers apply only to this recording.
The Town of North Salem Planning Board met on April 9, 2025, at 7:30 PM both in person and via Zoom. The meeting included pre-application discussions, routine approvals, and wetland permit reviews for properties on Reed Road, Cottage Lane, and Bloomer Road. Key actions included granting extensions for AT&T Mobility and Gilport Development Corp., acknowledging the withdrawal of the Morth subdivision project with escrow release, and discussing stormwater management and variance needs for two residential redevelopments on Cottage Lane.
Okay. I'm gonna call the North Salem Planning Board meeting to order. Um the first item on the agenda is a carryover of the public hearing for Grant Road LLC. It is being carried over to the May meeting. The next item on the agenda is a pre-application. Um just as a little background before there's a presentation by the um applicant's engineer. Um the Reed Road group purchased what many of us commonly knew as either the Joe Foe Passo, Lucashock parcel, Highgate Woodlands parcel, the 160 acres, which were three lots, and um they came in and talked to me about access and um some preliminary ideas of what to do with the property, and um their thoughts were to keep the three lots but make them better lots. Um and so we talked about how to achieve that, whether they could do it through a lot line change or whatever, and part of that discussion was access, which uh was back and forth between either a driveway access or a private road access. Um they were not interested in accessing off of uh a road they abut called Yinks Road or a road they abut called Sun Valley. They want to create their own road or access, I should say, from Reed Road, and then they purchased the lot commonly known as I684 I-684 associates, which uh runs along Reed Road. So the conversation changed a little bit about what is what will the process be again just sticking to four lots. So to have the visual, I'm going to try to put something up that everyone can see. I want to put up your I did a combination of the little site map with your second map, and then later I'll put up the bigger map. So with that, I would like to turn the conversation over to Adam from Insight Engineers. If you would introduce yourself and if you want me to flip the maps over to the other, I'll try to do that. And I do have a green cursor that will try to follow your conversation and help everyone visualize. Thank you very much. I'm Adam Fibert from Insight Engineering Surveying Landscape Architecture PC, uh representing the Reed Road Group. Um some of the applicants are here uh with me tonight. I'm sorry to interrupt, but I can't hear the speaker. Okay, closer to the mic, please. Or elevate it. That any better? Yeah, that was uh just barely. Yeah, a little bit louder, please. Okay. I'll start over. So I'm Adam Fiberg from Insight Engineering Surveying Landscape Architecture PC, representing the Reed Road group. Um I'm joined by some of the applicants here tonight. Um we're here tonight just to get the board's uh initial feedback, uh respond to questions you might have about a proposed lot line adjustment between the existing lots that were that were mentioned. Um the existing lots, if you don't mind if you could switch to the existing conditions plan, that it'd be the the call. Sorry, you've got to do better with the sound. We can't hear you. Sorry, maybe you could put that. How about if we elevate that um do we have anything to elevate that microphone? Hold on. I mean, he's talking right into it. I don't I don't know side. Let me just try to.