OPENPUBLICA · PUBLIC MEETING RECORD
Record of Proceedings

Oswego Committee of the Whole Meeting - March 18, 2025

Village Board & CommissionsTuesday, March 18, 2025
BodyOswego, Illinois
SessionVillage Board & Commissions
DateTuesday, March 18, 2025
StatusFILED
Video Record
0:00 / 51:30

Transcript — Verbatim
0:04

I was looking at the case.

0:15

You see everybody from here too.

0:18

See?

0:28

All right.

0:29

Welcome to our committee of the hall.

0:31

Roll call, please.

0:33

President Kaufman.

0:34

Here.

0:35

Trusty Geist.

0:36

Present.

0:37

Trustee Johnsonet.

0:39

President.

0:39

Trustee Kurt.

0:40

Present.

0:41

Trustee McCarthy Lang.

0:42

Present.

0:43

Trustee Novi.

0:44

Present.

0:45

Trustee Torres.

0:46

Present.

0:48

All right.

0:48

First up, we will open the public forum.

0:51

If there's anyone wishing to address the public this evening, please feel free to come up to the podium now.

0:55

I do not have any green slips, so feel free to come on up.

1:03

Seeing nobody, we will close the public forum and move on to new business.

1:07

Under item F1, we have Alejandro.

1:18

Come on down, sir.

1:22

Good evening.

1:23

Thank God for the opportunity to speak with you all today.

1:26

My name is Alejandra Hardaway, Public Works Management Analyst.

1:30

This evening, we will recap the National Pollution Discharge Elimination System Permit by going over the background, our village's storm water management program, and going over some general notices for residents on how to contact public works.

1:43

So starting with the background, since 2003, the village has been participating in the Illinois Statewide Permit IOR 40 under the Federal Clean Water Act.

1:53

The US EPAs has the National Pollution Discharge Elimination System Program, MPDES for short.

2:00

This permit says as a village, we are going to comply when discharging into waters of the United States and primarily the Fox River by definition, and to file a notice of intent to comply with that MPDES permit.

2:15

Now, as part of that permit, we have a public meeting to discuss those details where we allow residents to provide us feedback as well as any other input any other parties may have.

2:27

That's what this uh meeting is about tonight.

2:30

Um the state MPDES permit was last issued March 1st, 2021.

2:35

As part of this permit, we have uh six minimum control measures that we address as a village.

2:41

How we identify, define, and take steps to perform those measures are all outlined in the Village of Oswego's stormwater management program plan.

2:51

So the SMPP.

2:53

The first minimum control measure is public education outreach.

2:56

For example, a school may reach out and say, hey, can you send some staff to kind of speak about stormwater management?

3:02

Um, or we could talk about how it's bad to pour paint down a drain, how it could lead to killing fish.

3:07

The second minimum control measure is public participation and involvement, kind of like this meeting, um, where we ask for any comments and are able to address and update our plan.

3:17

The third is illicit discharge detection and elimination.

3:21

Say someone sees some soapy suds as they're walking around.

3:24

Well, we have the ability to trace that back to the source.

3:27

We look at outfalls and make sure that they are compliant.

3:30

We have both pragmatic regular inspections and single case-by-case inspections.

3:37

Erosion is a big risk, and our staff takes it seriously.

3:41

For example, silt bags are used for flow direction and rocks for erosion control.

3:45

Both are important for elimination.

3:48

Fourth and fifth, we have construction runoff control and post-construction runoff control.

3:54

So after the basins are built or the storm sewers are put in, how do we ensure the control?

3:59

Well, we might, as an example, make sure that there's an extra area in the design where sediment can rest fully and come to stop before the water continues to run off.

4:10

Water sheet flows from parking lots may be designed to go to the grass first so that the sediment can be caught before continuing off to the road.

4:19

The sixth and final control measure is good pollution prevention and good housekeeping.

4:24

Looking out for how much chlorides we put down for snow plowing, for example, or seeing how we can minimize pesticides on publicly owned right-of-way property are a couple examples.

4:34

Our SPP details how the village addresses each minimum control measure and how others might support our efforts like our residents.

4:42

So a general notice for residents.

Discussion Breakdown — Share of Meeting
Engineering And Infrastructure█████████████████████████████████████████████81%
Water And Wastewater Management██████10%
Fiscal Sustainability███5%
Parks and Recreation2%
Public Works2%
Summary of Proceedings

Oswego Committee of the Whole Meeting - March 18, 2025

The Committee of the Whole meeting was held on March 18, 2025 at 6:00 PM in the Oswego Village Hall. The agenda included an annual update on the National Pump Discharge Elimination System (NPDES) permit and a presentation on the design and cost estimates for a new Public Works facility, with the Board providing direction on the next steps.

Consent Calendar

  • No consent items were listed or discussed.

Public Comments & Testimony

  • No members of the public addressed the Board.

Discussion Items

F.1 National Pump Discharge Elimination System (NPDES) Annual Update

Alejandra Hardaway, Public Works Management Analyst, presented the annual update on the village's Ms4 permit (Illinois Statewide Permit IOR 40). She summarized the six minimum control measures: public education and outreach, public participation, illicit discharge detection and elination, construction site runoff control, post-construction runoff control, and good housekeeping (e.g., reducing chlorides and pesticides). The village has participated in the program since 2003. The permit was last issued on March 1, 2021. Residents can report stormwater concerns via the My Civic 311 app or by calling Public Works at 630-554-3242. The village's Stormwater Management Program Plan (SMPP) is available online. There was a brief question about construction site inspection; Ms. Hardaway confirmed that the village engineer serves as the enforcement officer and conducts spot checks.

F.2 New Public Works Schematic Desig and Cost Estimate Presentation

Steve, Public Works Director, introduced the long-standing project to expand the Public Works facility, which has been in discussion since 2002. Two options were presented by Andy Dogen (Williams Architects) and Jack Hayes (Frederick Quinn Corporation):

  • Option A (budget: $25 million): Renovate the existing 20-year-old building and construct a new facility to the south, including a 96-vehicle storage garage (with 6 maintenance bays), a wash bay, administration offices, a training room for up to 100 people, and support spaces. The existing building would be remodeled into shops, storage, and a sign shop. Future expansion of the garage (up to 24,000 sq ft) is planned.
  • Option B (budget: $41 million): Build all recommended space as new construction, repurposing the existing building only for storage. This adds additional vehicle maintenance bays (total 8) and more shop space.

Funding sources for Option A include $18 million in general fund reserves (increased from the previously estimated $15 million), $3 million from the FY2024 surplus (unaudited, possibly more), $3.5 million from water and capital funds, and $500,000 from budget funds in 2026/27. The village has $18 million in reserves and a 40% fund balance after the contribution (policy minimum is 30%). Options for additional funding include grants, bonds, or reallocating capital project funds.

Key capacity data: Current public works staff is 31, projected to grow to 62 by 2050 with village growth to 60,000 residents. Current fleet is 54 vehicles/equipment, projected to add 30. Option A can store 78 vehicles. Most police vehicle maintenance is performed at public works, and future growth will require additional maintenance capacity.

Board discussion centered on Option A. Several trustees expressed strong support, citing fiscal responsibility (no debt needed), the ability to phase future expansion, and the value of repurposing the existing building. Concerns about market volatility (tariffs, material costs) were raised; the design and construction team noted that the budget is based on current market conditions and that they aim to bid aggressively in late 2025/early 2026. Options to mitigate cost overruns include using unspent capital funds or additional surplus.

Specific alternatives were considered:

  • Alternate 1: Additional salt dome (about 2,100 tons) to allow storing a full year's supply and avoid losses from outside storage. Currently the village shares a dome with the school district and cannot store a full season.
  • Alternate2: Covered fuel island and composite catwalk/stair in the wash bay (estimated $175,000). These were cited for safety and equipment protection.

Trustees unanimously supported including both alternates within the $25 million budget, acknowledging that the salt dome could be scaled down or funded through other means (e.g., school district partnership or smaller size). The Board directed staff to proceed with Option A and include alternates one and two.

Key Outcomes

  • The Board provided direction to proceed with Option A for the Public Works facility, with a total project budget of approximately $25 million (including alternates).
  • The Board directed staff to include Alternate 1 (additional salt dome) and Alternate2 (covered fuel island and wash bay catwalk/stair) in the scope, with the understanding that the salt dome's size may be adjusted or additional funding sources identified.
  • Staff and consultants will move forward with design development, convene a steering committee, and aim for a construction start in fall 2025, with a projected 21-25 month timeline to completion.
  • The Board will be kept informed throughout the process.

Meeting Transcript

I was looking at the case. You see everybody from here too. See? All right. Welcome to our committee of the hall. Roll call, please. President Kaufman. Here. Trusty Geist. Present. Trustee Johnsonet. President. Trustee Kurt. Present. Trustee McCarthy Lang. Present. Trustee Novi. Present. Trustee Torres. Present. All right. First up, we will open the public forum. If there's anyone wishing to address the public this evening, please feel free to come up to the podium now. I do not have any green slips, so feel free to come on up. Seeing nobody, we will close the public forum and move on to new business. Under item F1, we have Alejandro. Come on down, sir. Good evening. Thank God for the opportunity to speak with you all today. My name is Alejandra Hardaway, Public Works Management Analyst. This evening, we will recap the National Pollution Discharge Elimination System Permit by going over the background, our village's storm water management program, and going over some general notices for residents on how to contact public works. So starting with the background, since 2003, the village has been participating in the Illinois Statewide Permit IOR 40 under the Federal Clean Water Act. The US EPAs has the National Pollution Discharge Elimination System Program, MPDES for short. This permit says as a village, we are going to comply when discharging into waters of the United States and primarily the Fox River by definition, and to file a notice of intent to comply with that MPDES permit. Now, as part of that permit, we have a public meeting to discuss those details where we allow residents to provide us feedback as well as any other input any other parties may have. That's what this uh meeting is about tonight. Um the state MPDES permit was last issued March 1st, 2021. As part of this permit, we have uh six minimum control measures that we address as a village. How we identify, define, and take steps to perform those measures are all outlined in the Village of Oswego's stormwater management program plan. So the SMPP. The first minimum control measure is public education outreach. For example, a school may reach out and say, hey, can you send some staff to kind of speak about stormwater management? Um, or we could talk about how it's bad to pour paint down a drain, how it could lead to killing fish. The second minimum control measure is public participation and involvement, kind of like this meeting, um, where we ask for any comments and are able to address and update our plan. The third is illicit discharge detection and elimination. Say someone sees some soapy suds as they're walking around. Well, we have the ability to trace that back to the source. We look at outfalls and make sure that they are compliant. We have both pragmatic regular inspections and single case-by-case inspections. Erosion is a big risk, and our staff takes it seriously.

SUMMARIZED BY OPENPUBLICA AI
TRANSCRIPT VIA PUBLIC VIDEO
openpublica.com