Speaker numbers apply only to this recording.
The Pleasantville Village Board of Trustees held a work session at Village Hall (80 Wheeler Ave, Pleasantville, NY), preceded by a 6:00 PM executive session on personnel and real property matters per the agenda. The board heard updates on the Water Storage Tank Replacement Project, a proposed pavement condition assessment, a conceptual drainage evaluation for the Seneca/Broadway corridor, and the Safe Streets for All (SS4A) project. No formal votes were taken; items were discussed in preparation for future board action. Note: The agenda and transcript date this meeting as Tuesday, May 26, 2026 (the day after Memorial Day), while the system timestamp records the meeting as May 27, 2026; the discrepancy is noted.
All right. Welcome all to the work session for the Village of Pleasantville Board of Trustees. Today is Tuesday, May 26th, meeting on Tuesday instead of Monday because Monday was Memorial Day. First item on our agenda is a conversation with our village engineer. Anthony Carr regarding the water tank bracket. So I'll kick it to Anthony. I'll give the 30,000 foot overview and then if we can go into detail, but you can dive into the tank. Dive in right into the details. So as you may be aware, we issued an RFP for design services for the design and permitting of the two uh storage water tanks. Um those were due a few weeks ago. I think we had four respondents, um uh two of which were kind of in the same in our budgeted price range, let me say. Um, we did a panel interview with both of those uh engineering firms, and um uh the the interview panel uh gave a ranking to the finalists and Woodard and Kern ended up getting about the highest ranking out of the two finalists. Um I'll let Anthony go into more detail about what that process will look like and short how Woodard came out on top. All right, thank you. Good evening. Hope everybody had a nice memorial day. Yeah, first and foremost, that go kind of quick. Feels like we didn't have a holiday. Uh just to give a little bit of background too to end more context to what the village administrators said earlier. The uh proposal was issued, excuse me, the request for proposal for professional engineering services, the design, permitting, and construction of the water storage tank site, and also associative water means on Lake Street and Beverridge Road. So incorporate the scope of work incorporates not just replacement disturbed tanks, also the surrounding infrastructure adjacent. That's we'll call it hydraulically connected pipes from the tanks to the pipes and Lake Street valves around the area, just to kind of package everything up because we know that uh quite frankly, it'll probably be a long time before we go back to this area again for any kind of work system improvements. So it makes sense to upgrade all the age infrastructure, not only on site, but contiguous to the site. So the RFP was issued on January 30th. Um, it was extended to April 10th. Proposals were due. We received proposals from four respondents, uh, Wooden and Current Engineering, H2M architects and engineers, La Bella Associates, and Charles A. Manganero engineers. And those consultants that I just listed were in order of lowest fee to highest fee. And I can get into the details when we tell you about what those numbers look like. But um, again, as I did mention, we had interviews, virtual interviews on May 7th and 8th with um H2M on May 7th, and on May 8th, the interview would have been current. Uh they were shortlisted uh shortly after the uh proposals were submitted, basically like the village administrator had said, two of the consultants, Manganaro and LaBell Associates were um 1.1 million and 1.2 million dollars in consultant fees, give or take. Some of those numbers were adjusted because of discrepancies in the proposal, but basically they were both over a million dollars. Our capital allocation was approximately $650,000. And that was based on 10% of an estimated construction cost of $6.5 million. Again, their approximations, the budgetary, uh, but wouldn't incurring, I believe the final number was $649,000 and change and H2M architects and engineers, the second lowest uh consultant was $750,000. So the two lowest consultants were within 100,000 of each other.