Radnor Township Parks & Recreation Board Public Forum on Odorisio Park Playground – July 7, 2026
Radnor Township Parks & Recreation Board Public Forum on Odorisio Park Playground – July 7, 2026
This meeting was held as a public forum via Zoom due to a lack of quorum. The primary focus was gathering community input for the Odorisio Park Comprehensive Improvements, particularly the playground replacement and reconfiguration. Note: The agenda and transcript indicate the meeting occurred on May 14, 2026, but the user instruction specifies July 7, 2026. This summary follows the instruction for the date.
Public Comments & Testimony
- Jackie Baer (West Wayne Avenue resident) asked how the public can continue to provide input on the playground design and expressed support for multi-use spaces for all ages and abilities. She opposed sand play due to hygiene and animal concerns, and favored features similar to Enki and Clemacrone parks. She volunteered to help with community outreach.
- Susan Fleming (neighbor) expressed frustration over the project's timeline (since February 2022) and suggested a phased approach (fencing and surfacing first). She questioned the plan to move the restroom/pavilion and requested three design options for public voting. She also offered to assist with distributing flyers.
- Bess Yates (West Wayne Avenue resident) supported nature-based play and inclusive design for all ages, including fitness equipment for teenagers and adults. She has a landscape architecture background and emphasized the need for diverse, unstructured play areas for middle and high school students.
- Additional comments from the public included support for adaptive swings, opposition to drop zones due to safety concerns (citing incidents at Enki and Clemacrone), preference for pour-in-place surfacing over engineered wood fiber, and the importance of shade structures and accessibility.
Discussion Items
- Tammy Cohen (Director of Parks and Recreation) presented a history of the project since February 2022, including the conceptual plan approved by the Board of Commissioners in February 2026. She reviewed inclusive play features, nature-based equipment options, surfacing types (engineered wood fiber vs. pour-in-place), sunshades, fencing, and the proposed relocation of the pavilion and restroom.
- Commissioner Howard Childs discussed stormwater management challenges, the removal of the upper parking lot along the third baseline, and the expansion of parking on West Wayne Avenue and Fairview. He also considered the need for a centrally located restroom to serve the entire park.
- Board members emphasized the need for more public input before finalizing the design. There was consensus to develop two or three design concepts based on feedback and present them for community voting.
- Discussion included the importance of balancing inclusive features (e.g., adaptive swings, sensory elements) with long-term maintenance and safety. The board noted that sand play was not recommended due to hygiene and maintenance issues.
- Tammy Cohen explained that a schematic design proposal is pending Board of Commissioners approval to move to detailed engineering and cost estimates, including stormwater management requirements.
Key Outcomes
- No formal votes were taken due to lack of quorum.
- Community members volunteered to distribute flyers and gather additional input from neighbors.
- Staff will develop two or three design concepts based on public feedback and present them for community review within the next one to two months.
- The schematic design process will proceed in parallel with community engagement to determine feasibility, stormwater management, and cost estimates.
- Funding considerations include an earmark from the park impact fund, and cost estimates will be needed for the 2027 budget planning process.
Meeting Transcript
So I just want to welcome everybody to the May 14th Parks and Recreation Board meeting tonight. This meeting is intended to have an opportunity for members of the community that have had interest in the Odorisio Park Improvements Project to be able to join by Zoom, hopefully convenient this evening for folks who, you know, maybe can't always make it into the township building and you know just easier to maybe attend on their phone or on their computers at home to give an opportunity to have a bit of a discussion. So tonight we we don't have a quorum, so it's not necessarily a designated formal parks and recreation board meeting. And all that really just means is that we're not going to take any votes or make any formal recommendations or or anything to give direction on any items. This is just going to be more of a uh a public forum. I do want to kind of give a little bit of a presentation that uh I kind of have given a couple a couple different iterations of over the last uh few months in terms of the playground development. That way, you know, we can kind of set the stage to have some discussion and then also provide a little bit of background on uh just the project where we are and basically where we're headed. Uh so I wanted to let the folks that know, well, the folks that are home at home that have joined us, thank you so much. Um we really appreciate you signing up and registering and taking an interest in the park. It's really important to, you know, hear the passion and the interest that folks have uh in terms of what they want to see with the playground, uh especially since it's such a big space and it's going to comprise, you know, pretty large part of the project. And also just when I when I say playground, I mean, you know, play space, active space. I know there's a lot of thoughts and ideas that have come along in our last few years of talking about the project. So I just basically, you know, I'm kind of like throwing the blanket term playground over the space. Obviously, you know, we're here tonight to uh determine what we want that to look like. Um doesn't necessarily have to be uh, you know, your your traditional, you know, commercial playground equipment. We can be creative with the space. Um so I just I wanted to kind of just welcome everybody. Um you should have an opportunity the way this Zoom is set up to raise your hand and make a comment. Uh the only thing that I would say is maybe just give me an opportunity to step through some of the details a little bit uh because I did want to show a little bit of a presentation. Since we do have a small group, and I know the board has kind of heard this over and over. Uh, I just wanted to uh maybe try and you know jump through it a little, you know, skip through it a little bit faster, uh, but also just give the opportunity for folks who might be joining us for the first time to sort of like hear a little bit about the the road we've traveled and and some of the progress that we've made. Um so with that, I'm just gonna basically uh get started. Um my name's Tammy Cohen. I'm the director of parks and recreation. Um, and I really enjoyed working with the members of our board that have been wired in on this project uh with it's been a it's been a while. Uh we started in February of 2022. Uh so it's you know, we we've been talking about Odorisio for quite a while. Um, one of the things I'm gonna do also is I'm just gonna I'm gonna share my screen uh so that you can see um the presentation that I have. So you should be able to see. Uh let's see. I think I got a swap, right? Ian. Yeah, just okay. Um so you know, starting in 2022, you know, we we've had four years of of a lot of discussions about the park space. You know, we know uh there's there's certain areas of the per of the park, you know, we want to improve. Obviously, the baseball uh field is gonna stay the same. The the wooded area is gonna stay the same. Um, and we worked through uh a process, uh, which I really want to thank the board members over the years for bearing with us. And I think tonight we have Commissioner Childs who's on with us. I know he was a former parks and recreation board member and chair, uh now commit now turned commissioner, um, obviously in a position to champion this project uh and help us get us over the finish line. Uh, but Howard, I really want to give an opportunity to thank you, you know, for all your time that you've put in on this, engaging residents and representing the board throughout the process of uh four years of public meetings, you know, discussing, you know, how how we get the improvements over the finish line for Odorisio Park. So this has been a deeply collaborative project uh all along. Uh we've had a myriad of different meetings. We've been in the park, we've had, you know, in township building meetings, RTCA meetings, and we've been at, you know, by Zoom a couple of different times to try and make it convenient for folks. And essentially as we've worked through the process, we we landed on a conceptual plan that basically been forwarded on to the board of commissioners for their now it would be in their hands to start taking it forward in terms of the next steps of review. So we got to a point of the conceptual plan by all means not a hundred percent final. There's still a lot of things to work through in terms of a lot of the improvement areas as we know the parking lots, the we have a comfort station that there's interest in turning into a pavilion restroom area and of course the playground area which makes up a sizable piece to the the location there's intentions to create accessibility throughout the park basically allowing people to you know from an ADA standpoint have accessibility from the parking lot along West Wayne Avenue all the way to to Fairview's parking lot and in and through all of the spaces such as the pavilion, the playground and then hoping to plant some trees and you know make it a nature based space as well. We know there's a lot to be proud of of the park currently we want to maintain a lot of those features and then obviously take an opportunity to improve some of the spaces that need a lot of work. We know that there's a great deal of stormwater runoff that's coming down onto the ball field now currently and into the space you can see the erosion that we've we've looked at in numerous pictures over the last few years that is happening on the hillside and eroding the trees and the root systems and greatly jeopardizing those spaces. So the improvements that are made in what I'll call the upper portion of the park where the playground's going to be in the pavilion is definitely an area that's going to require a lot of stormwater management and stormwater considerations.
openpublica.com