0:00Good evening and welcome to the January 2020 uh January 28th, 2026 Planning and Zoning Commission meeting.
0:09Uh calling the meeting meeting to order.
0:12This is the open comment period.
0:13This is a time in the agenda that allows members of the public to address the commission on items that are not on tonight's agenda as a public hearing.
0:21If there is anyone uh here or listening that would like to address the commission, please do so at this time.
0:29Is there anybody online?
0:30Please come up and state your name.
0:36I live at uh 4177 Berkshire Road, which uh I'm gonna talk about West Meadows development.
0:48Um I'm here to speak just because we're next door neighbors and we have a concern of flooding.
0:56And what I wanted to do, can I hand out a sheet of paper to each of you?
1:00Is it something like this?
1:02Is that the one that I sent?
1:04There's perfect, thank you.
1:13I'm asking you to table the uh CD 2025-007 cup for West Meadows until some court technical items are resolved.
1:25Not that I'm an out know everything about all these technical items, but I've just reviewed all the documentation that's been sent since the first EAW was approved, and then I saw some just discrepancies that I think are pretty major.
1:46Um first the flood fringe fill math has changed dramatically.
1:51The EAW said there was going to be about 240,000 cubic yards of earth that needed to be excavated, and now the current one says 73,000, which is uh for both fill and compensatory storage, and that seemed to me to be a huge swing.
2:11And I don't even know if the 73,000 covers the footprint of the buildings that want to be that they want built on the property, and second, the stormwater claims rely on a proof of concept, not a final model, and the staff notes say uh the Q2, Q10, and Q100 peaks would all be reduced and drawdown would be within 24 hours, but the city simultaneously says water resources will provide revised comments, and I haven't seen any revised comments, it's all based on theory instead of actual.
2:53And uh second, the traffic impact report isn't finalized, so we don't know uh that drives requirements also for what they're looking for.
3:07And then the wetlands uh from my not from what I understand from reading it, a replacement and sequencing plan is required before final approval of any of this.
3:20And so I'm I'm just as I said, going through all the documents that hundreds of pages that have been submitted.
3:29And then finally, uh we us in the West Meadows HOA wanted uh public notice clarity.
3:38We're an HOA of 100 homes, and on the first quote, neighborhood meeting, I think less than a half a dozen people were made aware of this development, just like on the end of the Cal de SAC, but as an HOA, the whole neighborhood is supposed to become aware and be told and invited to these meetings.
4:02And if we don't know what we don't know, we can't show up.
4:07And so the request is to table it until uh the storage is reconciled for fill versus compensatory, a peer reviewable stormwater floodplain model is submitted, traffic report is accepted, the wetland replacement plan is provided, and the scope is verified.
4:31So we're saying at this point the record isn't ready, and we want to be you know good neighbors, as I'm sure they do also, but we want a time we want it done right.
4:44So and as I said, we're we're uh I think one of the rich last time said some of our townhomes are very close to the flood.
5:02Is there anybody else who would like to speak?
5:07Do we have anybody online?
5:11If there is no more people, then I will close the open comment period.
5:17And I will now call the meeting to order and take roll call.
5:31Commissioner Andrist.
5:36And I'm Commissioner Gupta.
5:38We have a full um full attendance today.
5:42Moving on to the consent agenda.
5:45We will now review the consent agenda items.
5:48Item 4A is the minutes from the January 14th, 2026 Commission meeting.
5:54Has everybody has had a chance to review the meeting minutes?
5:57Any questions, comments, or concerns?
6:01If not, then I would take a motion to approve the minutes.
6:05Motion to approve the minutes.
6:10Motion made by Commissioner Aishin and seconded by Commissioner Yoast.
6:14All in favor say aye.
6:20That concludes our consent agenda items for tonight.
6:23We move on to the reports and recommendations.
6:26Tonight, we have two reports and recommendations and the agenda.
6:30Item 5A is conditional use permit number CD 2025 007 C U P by ML Group.
6:38One LLC for the placement of excavated fill within the hundred-year flood-prone subdistrict and compensatory stormwater area improvements for the future development of a multifamily development project.
6:57Okay, thank you, Commissioner Ross.
7:00Can we have a report from staff?
7:04Uh chair members of the commission, Elliot Miller with Rochester Community Development, and I'll be introducing the uh floodplain development permit uh by ML Group ILLC.
7:15Um so just some general information.
7:16It's the old uh Meadow Lakes golf course.
7:19Um you see the site on your screen there outlined in red.
7:23Um the location is southeast corner of 45th Avenue Southwest and Country Club Road Southwest.
7:28It's directly across the street from the Del Webb property that you've seen previously.
7:35I just see a lovely picture of all of us at the day.
7:38I have that on my screen.
7:40It's every other screen.
7:41Oh, it's that's the way it's set up in the room.
7:44There's nothing I can do about that.
7:45Well, that was not very good thinking.
7:49I apologize for that.
7:54And so again, tonight the request is placement of excavated fill in the 100-year flood-prone subdistrict and compensatory storage stormwater storage.
8:02Um excuse me, city teammates tonight are approving uh approval with recommendations.
8:07Um be acting as the recommending body, and city council will uh be the final decision with a public hearing being held at that city council meeting.
8:17So just a background information the current uh the properties currently zoned R3, so medium density residential, so it's prepped for uh medium style uh apartments, and the underlying land use is uh matches that as medium density residential, it's surrounded all by low density residential um land use and uh you know those homes similar to uh down to the south along Berkshire Road.
8:41Uh the creek that you'll see right there, um that's all city-owned land, and that's a majority of the floodway.
8:48On your screen now is the proposed excavation and fill exhibit.
8:52So red would denote where they're excavating, uh, and then blue is where they would be placing the fill.
8:57Um, and this would be to ensure that uh the development is at least two feet above the base foot elevation.
9:10I tried that one moment.
9:25Okay, so then uh the next one on here is just the compensatory storage exhibit.
9:30So at the end of the day, with all the excavation and fill, um, and I apologize for not being fully screened here, but there'll be three compensatory storage ponds.
9:39Um, and that blue outline that you see on the bottom is the floodway.
9:42So all this is occurring outside that floodway, which is required by law.
9:46Um, and so each pond is about 20,000 or so cubic yards of uh you know space to hold that water.
10:00So when we look at the floodplain development permit, we're really making sure that a couple of things, um, the main two being that there's no downstream effect or any detrimental effect to neighboring properties, um, but then also that there isn't a reduction in um the capacity for the floodplain uh for any flood event.
10:10Um so that way, you know, water isn't going towards other neighbors or across country club road.
10:16Um, so that's what we really worked uh along alongside with our public works teammates um as well as the applicant to ensure um that that math is correct.
10:28So the findings in fact and brief.
10:29Um I kind of just went over them, but again, the applicant has hired a professional engineer um to calculate all that uh required compensatory storage, and it's all been reviewed by our own public works teammates.
10:39Um, we do have Seth Logan in the um back here to answer any technical questions that you might have.
10:43And based on um the sheet that we were provided today, um, there might be some uh questions he can answer for you, but um more or less uh he's just here for the specific um application, so don't get used to seeing him.
10:56Um so again, public works reviewed it um and they've concurred with the analyses.
11:01Um, and then the project is designed to avoid negative impacts to nearby and downstream properties.
11:06Um, and and you might be reminded of the DNR stream uh bank restoration that's happening at Del Webb, um just west of here, which is upstream.
11:18Uh so tonight recommendation uh city teammates are recommending approval with conditions.
11:22There are three conditions.
11:23Uh, the first to be the work contained within the conditional use permit is subject to a grading permit approval.
11:29No work may commence until a grading permit has been obtained, so no excavation or filling.
11:34Uh, two being any permanent or temporary wetland impacts will need to be permitted with a technical evaluation panel prior to any work commencing.
11:41They have a wetland delineation for the site, um, but the tech panel review doesn't occur during the until the grading uh permit process.
11:50Um and lastly, a second floodplain development permit will be required for future construction of buildings on the site to go over this basically again when the when they're building um those buildings.
12:00So tonight they are not building anything uh that's not being proposed on this, it's just the fill um and excavation.
12:07So with that, I'll answer any questions you might have.
12:14Uh I would like to call the applicant up.
12:18Please state your name and you have 10 minutes.
12:30I'm speaking on behalf of the applicant ML group one.
12:33Uh on the virtual meeting should be Joe Wall, who was the engineer that had done all of the work for the modeling.
12:42He has signed a memorandum, it's in your packet to attest to the fact that we are filling this to the 100 year, and we have 73,000 cubic yards of compensatory storage.
12:54So in the neighbors um comments here that I just got this evening.
13:00Talks about the 240,000 cubic yards of fill.
13:03When we did the EAW, we were going to fill this entire site to the flood protection level, just straight across the board.
13:10That's two feet above the 100 year.
13:12We're filling it to the 100-year now overall, but each building pad would have the extra two feet.
13:19So we're substantially less than the 240,000 that we originally calculated.
13:24So we're only putting the compass compensatory storage is only the 73,000.
13:29So we're going to grade that area in white, except for the commercial on the top, place the 73,000 yards and take it out of the area.
13:36That's, I guess I call it purple.
13:39And place it in there.
13:40That's that's the whole request for the uh condition use permit.
13:44Conditional use permit doesn't give us any permission to build.
13:47We can't go out there tomorrow and build houses or anything if you should approve the conditional use permit tonight.
13:54He goes on to the council for review.
13:57The wetland replacement plan is currently in process with Ken Arnt, a national uh wetland firm.
14:04And he will be able to produce a replacement plan for the wetlands that are impacted on the site.
14:10That's not on the agenda tonight.
14:12That's why it's a condition of the conditioners permit.
14:15So conditional use permits work this way is that under certain conditions, you can do what you want to do, and then you list them and you have to satisfy them.
14:23Then you have the next step, which is your mass grading, your letter of map revision to the FEMA, a final grading plan, a preliminary plat, the final traffic study, uh, and the wetland replacement plan.
14:36So those are all underneath.
14:38We we can't get off first base if we don't get a condition use permit approved with conditions.
14:44And we it's on a burdens on us to prove that we can get the other these three conditions satisfied.
14:49So if you approve this tonight, you're subjecting it to those three conditions to which our development team and all the engineers are involved in it, have to satisfy those three conditions.
15:01Um if you have specific questions about the hydrology, I would suggest that um Joe Wall answer those.
15:11Um the second comment they had was stormwater reliant proof of concept, not a stamped final model.
15:16Well, the model is stamped.
15:18We do have that, as I mentioned.
15:20And the other thing is that um the comment about we did get some additional comments from public works, so we have the best, and I think Mr.
15:27Logan could confirm that before you so that was item two, and then the traffic impact report doesn't weigh in on this part of the project that comes comes later with our preliminary plan.
15:39So we have done a preliminary traffic study.
15:41We have dealt with the county, we have dealt with the city.
15:44Uh counties, uh reconstruction project of county 34 move from 2027 to 2029.
15:52And if we got started, luckily started this year on our project, which is a questionable, it takes us probably a couple years before we get people living there.
16:03So you have any questions?
16:05So again, as a condition you we agree with the three conditions that are on here.
16:09We've had additional documentation on or we addressed additional questions of the public works folks, and um again, the EAW was a mass grading plan.
16:22It put it two feet above the hundred-year elevation.
16:26Any questions for the applicant?
16:30I think I want you to go over the math that you went over in the beginning about the two feet and the 24,000 uh cubic yards.
16:38Can you just go over it again?
16:40So in the um EAW, when you start EAW, you don't you do not necessarily have exact building pads and layouts.
16:48So we did the best we could.
16:49We had a layout that looks pretty close to this.
16:53And instead of filling the site and digging it out of the purple and filling the site to the 100-year level, we went to what's called the flood protection level, which is two feet above that.
17:04Okay, and that's what created the high increase in cubic yards shown in the EAW.
17:09So, how is it when we do an EAW?
17:12You want to make sure you don't understate what you're doing.
17:14You want to make sure you give it the worst case scenario so that any questions come up from the environmental folks that are viewing it, we can we can address them.
17:25So we're down here now, we were up here.
17:30And I just want to make sure it's you everyone understands that the compensatory storage is you dig a cute, you fill a cubic yard of dirt on that site, and in the white, you dig another cubic yard of dirt out on a purple, and you're placing it from there onto the site.
17:45We're not hauling material into the site.
17:51Anybody to ask staff questions?
17:55Well, we have an opportunity to ask staff questions.
18:00Uh we can ask now, I think.
18:02We have everybody here.
18:06What is the difference between a floodplain and a flood way?
18:12Assume the blue is the floodway, and the white, purple, and blue together are the floodplain.
18:22So the blue line extents, that dashed line there, is the hundred-year floodplain extents.
18:31So imagine it is a big basin that would be in a hundred-year storm event.
18:36It's planned to fill up to the very minimum or to that elevation.
18:40The blue flood way is a lot where I'm sorry, so there's a blue dashed line.
18:46It's hard to see it.
18:48Could we pull up the county map?
18:51Again, what is that?
18:53I can do it, Elliot.
18:54Is it towards the top of the screen?
19:02So the floodway is a planning exercise that you do when you're modeling a floodplain.
19:09So in the floodway condition here.
19:13So this will show it a little better.
19:14That red and blue area is the floodway, which they are not impacting at all.
19:21Um you want to turn off the flood prone, the county.
19:27Um, so you could in theory, other places within FEMA mapped areas.
19:35You could fill the blue hatched area completely, and you would be able to contain the hundred-year flood within that red and blue hatched area.
19:46Rochester, as part of the UDC, adopted the compensatory storage requirement.
19:52So any fill placed within the hundred-year floodplain, which is the blue area, is required compensatory storage, which is what we're here today to discuss.
20:01They aren't building buildings with this plan, so there's no elevation requirement for a low floors.
20:06There's no rate control requirement because they're not installing any impervious surfaces.
20:12This is purely an accounting exercise.
20:15They are putting in X amount of fill within the floodplain within that blue area.
20:21They need to replace it with a compensatory storage of Y.
20:24Those two have to equal.
20:26And that's what they demonstrated working with us.
20:50Having done this work.
20:54So the we worked extensively with the DNR to review this, which helps administer the FEMA program for the state of Minnesota.
21:03So the I guess is the question how you take the blue area and you put it in a smaller compact area.
21:14So the plan would be that the compensatory storage basins are something that needs to be maintained in perpetuity.
21:22So they would put a conservation easement over that.
21:25When they fill in, they would need to replace that over time via maintenance agreement.
21:34So my concern is actually, no, my question is more that everyone, if there if a bad event happens, everyone will do their best to avoid contributing to restoration and repair, including FEMA.
21:53And my question is, is this an out for something like FEMA to say you built in a floodplain?
22:06You changed a floodplain.
22:09No, they would be following all the regulations and requirements provided by FEMA in the city.
22:15Um so there they are required to elevate their buildings two feet above the flood protection elevation.
22:22You'd be following all the ordinance and standards set forth by FEMA, the city and the county.
22:28Uh at Cables Development.
22:30I'd also just add to that, you know, Seth's talking pretty extensively of the regulations associated with filling in the in the in the flood plan or whatnot.
22:38I'd also note that with the UDC itself is based on um a model given to us by DNR.
22:45And the DNR has to approve our floodplain ordinance.
22:47So whenever we make even minor tweaks and revisions, including updating a panel, we have to go to send it through the DNR, and the DNR has to sign off on it.
22:56So everything that we do within the floodway is run by and through the DNR.
23:04Seth, you made some good points and just wanted to clarify a little bit more on the storage pond, composite compensatory storage ponds in specifics related to long-term impact.
23:14Like what mechanism exists or ensures that it's being maintained and not modified by future owners.
23:22Um, and then like is there a covenant that exists or some sort of an agreement in terms of long-term outlook?
23:30Yeah, so it's a good question.
23:32Typically, um these compensatory storage, we've had them on other projects throughout town.
23:38They're put on its own separate outlaw, so it's a separate property, and then it's completely encumbered by a conservation easement.
23:45So no development can occur, no changes can occur.
23:48Um, and then any future changes, modifications would require this very permit again.
23:58So there's permits throughout the Zumbro that the city pulls that um people that live along the Zumbro, any time you place fill within a map floodway or do any work within a map floodway or um map floodplain, it requires this permit, and within the floodway itself, it requires a DNR public waters works permit.
24:22Do you have another question?
24:24I do well come back to someone else in the okay.
24:26Does anybody can we show the question?
24:29Why is this what I'm going to call site work?
24:35Why is the fact that it is site work and not the actual permitting of what will likely be intended to be built there at all relevant for what we're talking about tonight?
24:52I don't understand your question.
24:53Can you say it again?
24:54Certainly, I'll say it a different way.
25:04But it's certainly about getting something built shortly.
25:07And I think it was mentioned within the year.
25:13So why is the very preliminary nature of this site work relevant?
25:23So it's a good question.
25:24I think it might be better directed towards the applicant on the decision to fill ahead of development.
25:34And I can answer you is that it's allowed per the UDC.
25:38Um and so while we we've talked about this doesn't give them the ability to build buildings.
25:44I'm guessing the reason, but I would probably defer to them is that they would like to set up the site so somebody could come and build a building if they're not building the building themselves.
25:56Um so that's why you know I was pretty adamant on it's an XY exercise.
26:04That's down the way we'll have um uh grading permit and a stormwater management plan that will address the actual development of this site.
26:14But when they go out and put out equipment and start building the compensatory storage and filling in the floodplain, there won't be an increase in impervious.
26:23There shouldn't be an increase in a runoff once that re-establishes is grassed area.
26:30So there's no requirement for extensive modeling at this time.
26:38Can that question go to the Yes?
26:40I will invite the applicant back up.
26:42Commissioner I shouldn't you have something.
26:43Yeah, I just have a question for staff kind of along these lines.
26:46This is just a step.
26:50The final greeting plan will have to be ready when they're when they actually have a building or whatever they're gonna put on there, correct?
26:57Traffic study will have to be completed before they can build a building, correct?
27:02So this is all just step one in several steps where there will also be opportunity for for um the neighbors to ask questions in future meetings.
27:18Commissioner Emma, you had something.
27:20I do have one more question for Seth, which is related to the memo and the no-rise flood modeling uh on that for the certification.
27:26Is that something the city holds?
27:27Um, or does it come with like any ongoing monitoring obligation?
27:33So the no rise condition isn't something that would be um required as part of this development because there are no impacts to the floodway.
27:45So the when you impact the floodway, that red and blue dashed area, that is when you need to update a Hack RAS model and update and do a letter of map revision with FEMA.
27:57Um, as I stated earlier, City of Rochester has more uh or adopted a stricter ordinance, kind of a belt and suspenders approach that if you fill with outside of that floodway, you have to replace it.
28:10Um so it it it won't they've provided and looked at it, but it wouldn't have been a requirement of development.
28:20Any other questions?
28:23Has this happened elsewhere recently in town?
28:29Uh filling ahead of development or just a compensatory or a conditional use permit?
28:34Yeah, no, the compensatory filling.
28:38So uh the Nigan property directly to the West has applied for this permit as well.
28:44Um the preserve at Maywood uh is a residential development along the Zumbro.
28:50They would have had to do compensed for storage.
28:53Uh West Transit Village, the city project also triggered compensatory storage, a very small amount, but it triggered it.
29:01Um and then the past few years in my time at the city, the only other one I can think of is the uh on 37th Street.
29:11It's it's a uh women's shelter development that also required compensatory storage.
29:17Which was the first one you mentioned.
29:20The Negan property to the West Dell Web.
29:25So they're doing something very similar to this.
29:29They're I would say they're following the more typical process that it's following their development plan.
29:35So it's paired with their preliminary plat and a few other items.
29:39That one is being done by the DNR, and this one is being done by the applicant.
29:44So the compensatory storage on the Dell Web property is done by the applicant.
29:51What is simultaneously occurring on that one that has already occurred on this one is the DNR is restoring that stream.
30:00So look at this picture here.
30:01You can see it's kind of a straight line through that parcel.
30:04It'll meander through, and so they'll be working within the floodway.
30:10I think that's another step thing because we approved the shoreline protection permit for the Dell Webb property, and now they'll do the same thing and um follow the steps.
30:21So to me, it looks like you know it's an extensive plan which is going to help the hundred-year flood area, right?
30:32Any other questions?
30:33I have another question.
30:35You just I think what you said, this will help the 100-year flood.
30:41I have an issue with that.
30:44And perhaps staff has another opinion, but the concept of the 100-year floodplains is widely discussed as marginally relevant today because the things that used to be a hundred-year flood now happen next year or 10 years from now.
31:07There the things are happening more frequently.
31:11So we will hear concerns from people in the community.
31:17And I think you will end up hearing people say that the hundred-year floodplain versus a 500-year floodplain situation is lacks the relevance and the comfort that you may find in it.
31:37Um can we have the applicant back up?
31:40I think you had a question for him, Commissioner Klein.
31:43My question is on the two stages.
31:49Uh digging the ponds, flying the fill, and then building on it.
32:09Yeah, I can't imagine building a house, going out to build a house and saying, well, we're going to dig the basement first and see how it goes.
32:19And it seems like this two-stage deal that's before us doesn't.
32:28The city's not on the hook in any legal way.
32:38The burden of proof is on us.
32:40The city needs to review this information as we go forward as well as the DNR.
32:46And we have to buy all the rules that everybody else does.
32:50The reason you start with the conditional use permit, if you can't get that approved, we're not we're not going to be able to do anything.
32:55We're not going to spend money on finishing up the mass grading or the wetland replacement or any of that thing because you can't move forward.
33:02This required to fill in a hundred-year flood area, we have to have a conditional use permit.
33:08That's what the ordinance says.
33:10And the planners can tell you that that's the way the process goes.
33:14So we know we can build buildings on it if we can get the conditional use from it to fill it to the hundred year, and then we'll just carve out the building pads where the new buildings would go.
33:25And we provide two feet of uh floodproof elevation so that they have that margin of error in there.
33:33If anything happens, it rises a little bit more.
33:36But that's how the sequence goes.
33:38It's been I've been doing this for 55, 56 years, and I can tell you I've probably done 40 conditional use permits, and it's mostly related to floodplain.
33:51So there's going to be uh uh these homes are going to have basements.
33:55No, no basements, just yeah, please.
33:58We can address the home building question when that comes back to us right now within our purview is just the grading aspect of it.
34:05And so in order to maintain that scope, I'm gonna make a motion to forward a recommendation of approval with conditions for conditional use permit CD 2025-007 C UP with the findings and support outline in the community development mill dated January 28th, 2026.
34:24Uh motion made by uh Commissioner Crowd and seconded by Commissioner Ayshon.
34:29Do we have any more discussion about this?
34:31Yeah, uh we'll have more questions.
34:32Yeah, but if I can come up okay.
34:36Oh okay, Commissioner Blink.
34:39Okay, but I so I'd like to see that.
34:40In regards to the question that came from the member of the community, he'd asked about um whether or not we could stay this because of what he perceived to be a lack of communication from this to the development.
34:50Um I think I was looking at the at the um I'm not exactly sure how this works.
34:55This is a question to the city and to the rest of the commission.
35:00Um, as I was looking at the actual maps of the notification region, it overlaps with what appeared to be the addresses that were on the communication notices and the community meeting.
35:11Um because it's part of an HOA, is there an obligation to tell the rest of the community, or do you just tell the people who own the whose name is on the plat that's within that range at cable scheme development?
35:24So if you look at the screen there, the the process that we're looking at is the big one just north of what Seth mentioned was the floodplain.
35:30Um identification requirements based on the UDC is 350 feet from the um lot line, effectively.
35:39And we also notify the neighborhood if they're um register with our neighbors.
35:44So page 14 of the packet actually had this, like had these things drawn on there.
35:49Um as I looked at that, it again they sent communications to the people as I saw in the document to the people within that range.
35:57Um I guess I just want to confirm that that was appropriate and that we didn't need to send a communication to the rest of the HOA.
36:07Commissioner Anland?
36:09That relates to that question relating uh communication.
36:12Since the site sits on two-thirds of a floodplain, really currently the disclosures were future residents um that they would receive about the site's flood history.
36:23Is that is there a method or mechanism that is already in place or a conditional aspect to it in terms of future home owners within the site?
36:33I mean, if they're elevated outside of of the floodplain, there would be no notice.
36:37Um I think if a mayo would, which was before the um commission probably a few years ago, um there was an easement put over those in regards to the shoreland.
36:49Um but I'd say these those are kind of two separate scenarios, and there wouldn't be any um requirement here to to notice a neighbors because they would be elevated outside of it.
36:59And then final question that I do have is on phasing accountability.
37:02So if the applicant sells the property before the building is constructed, um, does that second flood permit essentially like require run with the land or do they need to apply for a new project?
37:15Conditional use permits run with the land.
37:17Um if if they deviated from the approved plan, it would require an additional conditional use permit, but they'd be able to build what was approved under the CUP.
37:31So the clarification.
37:33So tonight we're talking about site prep.
37:38But the actual the next stage that we're not going to talk about doesn't have to occur.
37:48Doesn't have to wait until the work we're talking about tonight is complete.
37:54Only whether or not we approve it.
37:59Sorry, I wasn't following that.
38:00Can you repeat that question?
38:02So tonight we're talking about granting a permit for grading.
38:14So the only expense that the developer may incur incur in the short term are the professional services to design the rest of the grading and the construction of the next phase.
38:28The actual grading work itself need not occur in the short term.
38:38Before the applicant, before the next level of application.
38:42Grading cannot occur until there's an approved C UP and an approved grading plan.
38:46That wasn't the question.
38:48Not following the question.
38:49The question is if we grant the CUP for the grading this evening.
38:55And the applicant does not immediately proceed with it, the applicant can still proceed with all of the design work for the next phase and come to us with that application.
39:14And nothing will have been built there yet.
39:17That's truly what this two-phase, this two-phase process that we're talking about exists on paper, not in dirt.
39:30Um Tony Collison is.
39:35Commissioner Klein, correct me if I'm wrong, but I think what you're asking is if this commission were to approve the CUP tonight, does it have some type of an expiration?
39:44So in other words, do they have to do the work within a certain amount of time?
39:49That really wasn't the question, but it just it's just a two-phase.
39:55So I believe your question is do they need to complete the grading prior to coming forward with their SDP plan?
40:06I I'll let community development answer that.
40:09But there would be no requirement for them to um.
40:16I'm blanking on what that question was again.
40:18Sorry, you repeated again, Seth.
40:20So he's wondering if they need to complete this conditional use permit, all of the requirements within and build it prior to the SDP coming forward.
40:30No, there is no there is no requirement for them to build it prior to the SDP coming forward.
40:36So it exists on paper.
40:41But there would still be another checkpoint with us before that building commenced.
40:46I think the best way to look at this, and this is the Seth's point earlier is that all we're looking at today is for filling within the floodplain.
40:55What happens after that is irrelevant?
40:58The the applicant the applicant hasn't submitted any information in that regard, and that's not before the commission.
41:03The question is, you know, does the commission recommend approval or denial to the city council to do the the fill that they have requested?
41:10I'll call the question my previous motion.
41:14No, we have to vote on that, and then we vote on the motion.
41:20So call the question forces us to vote on if we're gonna end debate and take a vote on the motion.
41:24So it first has to pass the call to question, and then we'll take up the motion to approve the recommendation.
41:30Does that require a second?
41:34Um we have a motion to end the debate.
41:38So uh I uh I'll take a vote on that.
41:41I'll take a roll call.
41:43Uh Commissioner Aishan.
41:46Uh Commissioner Klein.
41:51Commissioner Boyham.
41:53Commissioner Hamlet.
41:58Commissioner Andrist.
42:02So the vote passes and the debate is ended.
42:05And now we go back to the uh item 5A.
42:09We have a vote on the table, and I will again take roll to take the vote on that.
42:16Uh Commissioner Ayshon.
42:29Commissioner Andrist.
42:33The motion passes with one uh nay from Commissioner Klein.
42:41So you go on to the next report, which is item 5B.
42:48Can we have uh Commissioner Ross back?
42:56A little dark out there.
42:58One time sit in the hall.
43:04There's no lights on there.
43:08Item 5B is major land subdivision number CD 2026 001 plat by Bigelow Homes LLC to be known as Westbury First, subdividing 34.4 acres into 105 residential lots, three outlots, and a dedicated city parkland parcel.
43:27Staff, can we have a report?
43:32Thank you, Chair Gupta, members of the commission.
43:34My name is Desmond McGill.
43:36I'll be bringing in this preliminary plan or major land subdivision application to you and introducing it.
43:44The subject site is generally located on the northwest side of town, uh near the the fringe of the uh of the city boundary.
43:51Uh our applicant and owner is uh Bigelow Homes LLC.
43:57Um more specifically, uh it's um in this yellow highlighted area uh is where the site is.
44:08Uh which is south of King Arthur Road and east of 60th Avenue Northwest.
44:14Uh their request is for um a major land subdivision um for a it's overall a 68-acre um parcel.
44:24Uh however, phase one is only 34.4 acres.
44:28Um, and uh that would be located on a uh property that is zoned R2.
44:34With this plat, there would also be um three outlots and a an outlaw that would be a uh dedicated park site.
44:44Uh we are recommending uh that the commission forward a recommendation of approval, and uh of course the council would be the approval body.
44:53Uh where we're at on this uh project in terms of their timeline, uh about a year ago they did uh an annexation and zone change.
45:03I think in January is when you saw it of 25, which was approved.
45:08That is a quasi-judicial decision.
45:11After that, they made a submission to this staff shortly after approval for the general development plan, which we reviewed and approved administratively.
45:23And I should note prior to the annexation as well, there was a neighborhood meeting prior to that step in the process.
45:30Where we are now, they just recently did another information meeting with the neighborhood before this major land subdivision preliminary flat, which is a quasi-judicial uh item.
45:43Should the application be approved, they would be then making submission of uh civil plans, uh the engineering uh water sewer, all that.
45:52Uh that's an administrative review, uh, and then submit a development agreement for review that is approved by the city council.
46:00Um after that, then you can submit a final plat, and then building permits can be issued.
46:07Um, this is the P2S land use map.
46:10Uh the site again, it's highlighted in blue here.
46:13Um the yellow area that encompasses most of the site around envelopes it, uh, that is low density residential in our comprehensive plan.
46:22Uh, we also have medium density residential across 60th uh Avenue Northwest.
46:30And we also have an area of mixed use transit supportive corridor, which could be a um you know a variety of things of mixed use and intensities.
46:42Um in terms of zoning, we got uh the site is zoned R2.
46:46Uh we have R2 zoning uh uh to the east and the south and further to the west.
46:53Uh immediately adjacent west, we have R1 zoning and then existing subdivision there.
46:59Uh and up to the north, we also have R1 zoning.
47:02Uh, in terms of the present land uses, again, the site is highlighted in yellow.
47:07Um is generally undeveloped agricultural production land.
47:11Uh likewise the properties immediately to the east and south, and also uh to the west of 60th are all undeveloped agricultural production.
47:23Uh we also have a church to the southwest, and the rest of the uh development around it is single family residential.
47:32Uh this is the approved general development plan.
47:34Again, highlighted in the yellow as the boundary of the general development plan.
47:39Uh, you can see that it was proposed as a two-phase uh development, the first the north portion being phase one, and that's what we're we're looking at tonight.
47:49Uh, and then we have phase two on the south end.
47:52Uh as far as um the approved GDP.
48:01Um I mentioned it's 68 acres, uh, a total of 220 units.
48:06Uh lot sizes are generally 55 feet wide and 120 feet deep.
48:13Uh, and there was a requirement for an um dedication of an eight-acre park site, which is located up here on the northwest portion of the site.
48:23Uh, this is the uh Westbury First Major Land Subdivision.
48:28The entire plat includes these outlots to um outlaw C and B down here.
48:34So the overall platted area is 68 acres, but this uh phase one is um phase one is uh about 34 acres.
48:45Uh as noted, this green area here that would be your park plan dedication out parcel, and then these areas here um would be part of phase two development uh outlaw C and outlaw B.
48:58We do have five conditions of approval for this.
49:01The first one being that there's a few things that the public works department was looking for.
49:05Uh, the first is just a standard condition that civil grading and stormwater plans be submitted for review and approval, uh, and that this geometry of the street is considered conceptual at this time.
49:17Um wouldn't anticipate any major changes, but um there that it is considered conceptual until those civil plans are approved.
49:25Um we also need a new development agreement.
49:28I think there was a prior one on this.
49:30Uh so the public works department is asking for uh an updated development agreement there.
49:35Uh also plans um uh should be revised updating outlaw A.
49:41Uh, and it should be changed to a drainage and utility easement, uh, and it should extend to Cambria Avenue.
49:48And then outlaw C and B public works is asking for those to be aggregated into one outparcel.
49:55Uh the second is just that the utility line work.
50:00This was a public or um uh RPU electric comment.
50:02They're asking for uh additional line work to be added, extending a public utility easement uh over the front of uh of the parcel.
50:12Uh the fire department has asked for either one of two things.
50:15Option A would be for um uh a um temporary fire department access road, which would be uh which would be constructed along the south side of the development.
50:26Option B would be for the developer to sprinkle uh um the structures, and I I believe the applicant would probably look to do option A, but uh they can uh um perhaps um provide us some additional information when they speak.
50:44Uh most of the park land dedication uh is addressed with with that out parcel, but an additional 0.9 acres will need to be uh uh provided through uh cash and loo of uh actual land.
50:59And then uh the name of Hazel Drive Northwest uh is a convention issue.
51:04Uh should be Hazel Street Northwest.
51:07So those are the five conditions of approval.
51:10Uh we are recommending approval with those five conditions, and our motion is a recommended motion is to forward a recommendation of approval with conditions for major land subdivisions CD 2026 plant with the findings and support outlined in the community development memo dated January 28th, 2026.
51:31And uh that concludes my introduction, and I'd be happy to answer any questions that the commission may have.
51:38Uh is the applicant present.
51:43Please state your name and you have 10 minutes.
51:47I'm Kyle Scove with WHKS here on behalf of um um homes this evening.
51:54Uh we have no um objection to the um five conditions.
52:02And I'm available for any questions you may have.
52:06Any questions for the applicant?
52:11If no questions, the I just have one, which is related to the thank you, Commissioner.
52:18In terms of the sprinkler access and fire access, is there an option that the applicant or builder is leaning towards since we've been given option A or option B related to it?
52:27Um they would go with option A.
52:30Uh there was also discussion about limiting the building.
52:34It's possible we maybe could limit the building to the west side and stay under that 50 because they may roll into phase two rather quickly, but um it would be met, it would be discussed with the fire department.
52:47And yes, A would be they don't want to sprinkle.
52:51A would be the preferred option.
52:52The the access road.
52:55Any other questions?
52:57I was gonna say I think the access road is option B in the documentation, right?
53:02Okay, yeah, the access road would be their preferred option.
53:06Any other questions?
53:08If there are no questions, thank you.
53:11Uh I would entertain a motion.
53:13I'll make a motion to forward recommendation of approval of conditions for major land subdivision CD 2026 as 001 plat with findings and supported support outlined in the community development memo dated January 28th, 2026.
53:27A motion made by Commissioner Ross and seconded by Commissioner Andrist.
53:32Any other discussion?
53:33Any other questions?
53:34All in favor, say aye.
53:36Any nays motion passes.
53:40Um that brings us to the end of the reports and recommendations, and we have no public hearings.
53:52Can you have some thank you, uh, Chair Gupta?
53:55Uh, we did have uh city council meeting on January 1st.
53:58We did have one item on that agenda, which was the UCI uh monopole uh wireless communications facility uh development is 50 by 50 area uh with a hundred and five foot uh tall um uh monopole structure, and that was uh approved unanimously.
54:18So that's that's all right.
54:20Any other questions?
54:23Just a comment for Mr.
54:25Could you forward on to whatever department is in charge of these screens to see if we can get the every other requirement out the door?
54:32If I'm not mistaken, I think that was a city council requirement to meet.
54:36Um I don't remember the exact terminology associated with it, but essentially so that everyone can see everyone online.
54:41That's what it comes down to.
54:43Uh so his screen right now is showing.
54:45All I see is the dates.
54:46And mine is showing us that.
54:49So he both of us have separate.
54:50So I need to talk to the city council president, you're telling me.
54:54I'll give him a shout.
54:56This is a requirement.
55:00According to I was told during the onboarding, yeah.
55:02But we didn't have this problem earlier.
55:05I I I would just note, sort of with the new rules in regards to virtual attendance at board and commission and council meetings, is if a council member wanted to appear remotely, the council members need to be able to see everybody needs to be able to see each other.
55:20So maybe not as applicable here.
55:23Um, and I'm not sure how hard it is to switch.
55:26I just know uh heritage preservation also met in here last night and they brought up the same issue.
55:31So maybe it's a quick fix, maybe it's not, but that's it it it is a requirement.
55:35It seems kind of silly, but it uh um it is a requirement.
55:39I mean, would it help if we kind of staggered our chairs a little bit so we could see both screens?
55:46I will I will leave that to your discretion.
55:49Okay, otherwise we'll wait for Commissioner Ashing to have a word with city council.
56:00Okay, if nothing else, then I will take a motion to adjourn.
56:04Second motion made by Commissioner Krause, seconded by Commissioner Yoast.
56:09All in favor, say aye.