0:04Good afternoon, everyone.
0:05I'd like to call to order this historic design review commission for Wednesday, November 19, 2025.
0:12May I have a roll call, please.
0:16Velazquez, Galloway, Mazuka, Guevada, Vasquez.
0:34May I have translation services, please?
0:46Las personas ke prefer escuchar esta audiencia de Spaniol.
1:00The historic and design review commission is advisory board appointed by the city council.
1:05Maurice Gibbs Chairman and the Vice Chair is Jeffrey Fetzer.
1:09It is a function of the Commission to advise the city manager and all relevant city departments concerning all applications for permits for properties and historic districts for landmarks on city property in a river improvement overlay and for demolitions.
1:24And considering whether to recommend approval or disapproval of an application for certificate of appropriateness, the commission shall be guided by the city's Unified Development Code and design guidelines and standards that have been adopted by City Council.
1:38And the pill of a decision by administrative official can be filed in accordance with the city's Unified Development Code.
1:43If anyone present wishes to speak in favor or in opposition to any item on today's agenda, please sign up on a public comment sheet.
1:51It is not necessary to sign up if you are the owner of or representative for a project on the agenda.
1:57You will be called on as the case is called.
2:00Case representatives will be given no more than 15 minutes to present their case with an additional two minutes to respond to public comments.
2:07Speakers for or opposed to a case will be limited to two minutes each.
2:11Speakers may also sign up to yield their two minutes to another speaker who has signed up.
2:15Anyone who is yielding their time must be present at the time the speaker is called upon.
2:20Speakers will be called upon in the order in which they are signed up.
2:24Following public testimony, any commissioner may call upon any speaker to respond to further questions.
2:30Approval by the commission does not take the place of any type of permit.
2:34Permits must be attained for all work.
2:36Certificates of appropriateness for work approved by the commission will be emailed to you within 10 days.
2:41No work of any type is to be started without obtaining the appropriate city permits after a certificate of appropriateness has been issued by the Office of Historic Preservation.
2:50At this time, please silence your cell phones.
3:31Item number two, HDR case number 2025-25.
3:38The Conservation Society of San Antonio opposes the placement of the digital sign, which projects above the parapet of the building at 101 Bowie Street.
3:48Unlike the other digital signs, we have a view that proposed design fails to achieve integration with the building and to which it is being attached.
4:27Since it is not part of the digital sign.
4:31Respectfully submitted Louis the Veterans President Conservation Society.
4:41Okay, and we have in-person speakers for item number eight.
4:44Um the first is Pam Carpenter.
4:47Carp or it's just Pam Carpenter.
4:49Um she'll receive six minutes.
4:50Bianca Maldonado and Tom Sparks are also here and have yielded their time.
5:03My name is Pam Carpenter, offering comments on behalf of Bianca Maldonado, President of the Monticello Park Neighborhood Association, and the 10 member MPA Board of Directors, Post Office Box 100 315, 78201.
5:19We appreciate the homeowners' recent efforts to stabilize the property at 462 Mary Louise Drive.
5:26Um to address the properties, to stabilize this property, address the deferred maintenance, and to bring the property into compliance with the vacant building standards.
5:39At the same time, we must acknowledge the long history with this site where some of the work was done without required certificate of appropriateness, and some work has stagnated and some work is trying to proceed.
5:56On May 29th, 2007, the current owner received a City of San Antonio permit, AP number 137-5960 for in-kind replacement of faulty stucco on the garage, same color, same material.
6:12Notably, no garage exists today.
6:15Some historic sales records from 2006 show that a garage was present, and Sanborne maps confirm that an original accessory structure once stood on the property.
6:26As an original contributing resource, its demolition would have required both a permit and a certificate of appropriateness.
6:34It remains unclear when and why the garage disappeared during the current ownership.
6:41Original garages should not simply vanish.
6:44This gap in the record is significant, especially now today that the applicant is proposing to reconstruct the missing structure.
6:52We support staff's recommendation for approval of the new garage with the stipulation that the garage doors and the pedestrian entry be constructed of wood and be historic in character.
7:04We respectfully request that historic detailing be incorporated, specifically carriage style doors with windows, and appropriate finestration be added to the west elevation.
7:15The doors on the submitted elevations for the garage look rather plain and modern, and the garage doors will be visible from the right-of-way.
7:25Regarding the drive lane to the garage, this submission does not include dimensions of the drive aisle or that driveway apron.
7:34This should be in keeping with the historic homes nearby.
7:38We also note that some of the sidewalk adjacent to the driveway that's in the public right-of-way adjacent to it has been partially missing for more than a decade.
7:52This washout impedes pedestrian access and presents a trip hazard.
7:56I've personally struggled with it, especially after dark.
7:59We respectfully request that OHP staff and HDRC address the driveway dimensions and coordinate the replacement of this piece of the sidewalk and the drive apron as part of this case.
8:13We must also raise concerns about inconsistencies among applications submitted over time.
8:21In 2007, an application described repairs to an existing garage as we just mentioned.
8:27Today's application proposes an entirely new structure.
8:32Also in June 2025, the property received administrative approval for a new pool, yet the pool is not reflected in this current site plan.
8:42And in April of 2025, the HDRC approved a second floor addition to the main house.
8:49Our architectural review committee is concerned about the piecemeal manner in which these requests have been presented to Office of Historic Preservation and HDRC throughout this construction campaign.
9:02Execution and coordination of these improvements are critical to the quality of life on this block.
9:07This home has been uninhabitable for more than eight years.
9:11We appreciate your consideration of our comments and your ongoing support in helping the community bring this property back into compliance and back into productive use.
9:22We ask that you include our stipulations as well for sidewalk reconstruction, driveway apron reconstruction, and some historic character to the garage.
9:35That concludes public comment.
9:42Do any commissioners wish to pull any items?
9:47I'd like to pull agenda items.
10:0111 will be heard individually already.
10:08All right, hearing no others.
10:10Can I have a motion to put a balance of the consent agenda?
10:13Chair, I'd like to make a motion to accept items one, three.
10:23One, four, five, six, seven, and nine, all of staff stipulations.
10:31Spear moved in properly second and is there any further discussion?
10:36All right, hearing them may have a roll call, please.
10:57If you're on the consent agenda and your address is 114 Camp Street, 901 Novolitos, 1431 East Commerce, 110 West Low Wood, 1829, North New Braunfels, and 1511 West Linwood.
11:10Your case has been approved and you do not need to stay for the remainder of this hearing.
11:14If you have any questions, please contact a member of staff.
11:16Your certificate of appropriateness or commission action letter will be prepared and emailed to you within 10 days.
11:23Commissioners, that brings us to item number two, 101 buoy.
11:28The applicant Nick Powell is here with us virtually as well as you missedicki.
11:34Commissioners, I will uh pull up the most recent um rendering of this, and then uh commissioners, this was reviewed by the uh HDRC subcommittee uh a couple of weeks ago, and so if uh commissioner who was present would like to give an overview or a summary of that meeting, that would be a good start.
12:03I was on that VRC and we discussed the um is this the latest proposal, Edward?
12:13Uh Nick, uh, if you want to jump on and just confirm that this is the most recent, but uh yes, sir, I believe this is advance at one page.
12:23Yes, this is the one that we reviewed where it's above the belt course uh near the parapet.
12:30Um questions that were asked, and uh I think they were the applicant was gonna go back and check on them was uh whether the south end of the sign uh aligns with the south edge of the parapet and not extend the out to the width of the belt course, and also whether the uh north end of the sign is uh aligns with a vertical uh panel joint of the the facade below and there was some question about the uh the added small sign below with the sign company's name, whether that is uh actually required, and uh that may be a question for staff uh on that signage, and uh we can get to that uh a little shortly thank you, Commissioner Vasquez.
13:36Uh one of my questions was why is the signage not integrated into the building's architecture like other signage?
13:45Is there someone that can answer that?
13:48I can absolutely answer that.
13:52I'm I'm the architect at Orange Barrel.
13:54Um, if you could advance this or turn it back to page four.
14:04Um is the market analysis page.
14:09You you uh one more.
14:12So we um all of our projects we study placement in kind of you know digital model to understand the visibility, and the issue uh here is this bank of trees.
14:24So if we lower it to be um, you know, every site has its own view shed, and for this site, um if we were to lower it to be uh you know fully within the building face, you can see those trees would block most of the visibility.
14:39So to be commercially viable, we had to lift it.
14:42But we did um we did address the alignment issues that were raised.
14:48Um at HDC uh a few a few weeks ago.
14:53Um so the south end is aligned with the building mass.
15:00Um and uh the north end does align with the building um reveals, and then we have wrapped the whole thing in a in a sheet metal uh trim that matches the building.
15:10So we did we did um yes, we did work to to remedy some of those issues because it is not part of the building, but we we made it aligned with the building, and if you go one more page.
15:23So we we sort of aligned with the building organization, right?
15:28That was the way we integrated it.
15:30So you can see the edge of the of the sign on the south end aligns with the building, not the belt course, but the building mass, the right side aligns with some of the reveals, and then the height of it feels similar to the banding that is there on the building.
15:50And ma'am, the main reason was the trees?
15:53The sign is covered by the trees upon approach.
15:58Yes, the commercial value is driven by the vehicular visibility and the and the approach, the trees block it, right?
16:07So if we look at it in the in the drive, um the trees block it until you get right here, until you get just past the clump of trees.
16:16And um for a sign to be commercially viable, it it has to have a longer what we call advertising a read.
16:22It has to have a longer uh duration of visibility.
16:27And you didn't think by lowering it, it'd still be very visible.
16:32Um while it's still commercially viable and um not so disruptive as it is well, that's correct.
16:45If we lowered it, the trees would block the visibility for most of the vehicular path, and you would only see it when you got right up to it, which is not really um, you know, which is not really optimal for um like we don't like the signs to jump out at you.
17:01We like them to feel like part of the larger context.
17:05Well, it's jumping out as it is, or as the way you're proposing.
17:09Um I would think integrating it further down uh would be a more uh more natural, but then the second question was uh about the sign below the sign.
17:24Um I'm not sure what was concluded at the DRC, but what was the answer on that?
17:33Well, I can say um would I can say that this is for us.
17:39I I hope you're not getting the echo I'm getting.
17:42Um for us, this is just industry standard.
17:45Uh all advertisers, all media companies do this.
17:48Should anything go wrong with the sign, the general public knows who to who to contact, right?
17:53Um so what we did, we heard the comments at HRC initially, and we pared down the design of it, right?
18:01So we've made it more elegant, we've made it these channel letters instead of a sign box.
18:07Um but that was our response.
18:11This is uh Rachel Parrish.
18:13I'm over the sign team right now.
18:14Um so to have the separate sign, it would be a separate permit.
18:19Um that sign would need to be integrated, but it is part of the review that we would do with the actual sign permit.
18:26So the way that it stands right now, it needs to be incorporated inside the sign to count as one sign.
18:34Chair Have Thank you.
18:36That that helps answer the question, but do the other signs the other digital billboards around town have the same kind of uh second signage.
18:52Sorry, I'm I don't have another microphone over there.
18:55So um, yes, uh the other signs around town do not have a separate sign um for their company, it's integrated within the sign as well.
19:03So you will make or your office will make sure that it's integrated.
19:06Yes, it's part of the permitting requirements, otherwise it's considered a separate sign.
19:13Yes, just to follow up uh kind of help uh answer uh the question.
19:17The first question was for first DRC that we had this the sign was presented there where you were actually recommending it, and it didn't look good at all because it didn't it impeded the uh the color of the squares that were there.
19:28Um it looks a little better now, but it doesn't still doesn't look as good.
19:32But uh so yeah, that was discussed that was brought up and it was renderings of it down there at the bottom in the DRC, we we looked at it and said it's not gonna work there.
19:44Uh sorry to bring you back up here, Ms.
19:48Um these digital billboards required to have the company name on them.
20:00Um not for our code, um, but I think there may be some additional requirements, state level, federal level.
20:04I'm not sure on that part.
20:05On ours, we don't require them to necessarily have the logo on there, but it is standard that they have the company name on there on the signage for exactly the reasons that they said it is standard practice, if not required.
20:20Okay, so all the ones that we've reviewed so far, this is the only one that has shown the company name on associated with the uh digital sign.
20:31External to the sign.
20:32Um yeah, I think this is the only one that they've explicitly shown where it's going to be.
20:38Um I haven't looked at all of them within the permit itself, but my guess is they're going to be included somewhere on that sign.
20:46But they would be within the correct, it needs to be within that sign.
20:57Uh would it is there any precedent for sticking that second sign behind it?
21:04So whoever is uh concerned about it needing repair or whatever they need to do with it, can note to call this company from the sign and back of it instead of it being in the front.
21:19I haven't seen anything like that because the way that this one is set up is a little unique in that you have a part of the back that's exposed for the most part.
21:29They're either double-sided or they're up against something.
21:32So I don't know that we necessarily have precedent.
21:34It's something we could look into.
21:36Um just because of uh consistency.
21:41All the other signs don't have a second sign on them.
21:44So I think uh right.
21:45And the the difference is is that this one is actually separated from the sign.
21:49Um so a lot of times it won't be like within the sign itself, but it's included in the sign area because it's still attached to it, and we would include that in the the total area of the sign.
22:00So it may not be on top of the advertisement, most of the time it's underneath, uh, but it needs to be incorporated in that total area of the sign, yes.
22:12Could I propose something?
22:14Um if we made that frame a little deeper on the bottom or the top, and we incorporated the text into the frame.
22:24Would that be acceptable?
22:30I think what um what makes this interesting is because on the other signs that we reviewed, um this is the one that stands out because of the way your signage is your your advertisement of your company is there.
22:43On the other ones, we haven't seen that at all.
22:46And that's what made this one stand out, and that's why it's it's being kind of like a point of contention amongst the um commissioners because this is not what we've seen on the other signs.
22:56Now I know that you want to be recognized in the fact that you say, well, we want to know want people to know something goes wrong who to contact.
23:03We know who to contact.
23:04I'm sure the building knows who to contact if something goes wrong with the sign.
23:07So it's about your name being there so obvious, you know, and that's what's creating the issue there.
23:14So I think hopefully you understand where we're coming from in that respect.
23:21That was kind of the point that was needing help with.
23:26Um are there any other questions for the applicant?
23:30Uh for staff, could we go back to the um the street views coming up the street?
23:46I know that in reviewing other signs.
23:51This is really the the first one we've seen that appears to be more like a billboard as opposed to integrating into the facade of the sign.
24:01You have done some uh details that uh relate to some of the elements of the facade, but it still does read as a billboard.
24:14And um if the um if the 200 feet view of the of the sign is not doesn't make economic sense, then might I suggest you look for a different building.
24:34Um trying to force it into this location because of other elements uh in the approach seems um uh counterintuitive and contrary to the um the uh ordinance to comment on that, ma'am.
25:05Um yeah, I mean I think we looked at this site and we placed the sign where it wasn't facing the riverwalk.
25:11We placed it um you know with a kind of respect for the context of the place.
25:18And this was the best location on this building.
25:28I'd like to make a motion.
25:31I'd like to motion that we deny the application.
25:41Um to to the comments that my colleagues have made, I think um, they're all very solid.
25:46We talk about the frame with the b the the business name on it.
25:50The frame is integral to the signage, right?
25:55It wraps around the signage.
25:57And the name of the business happens to be on the lower left-hand corner.
26:01That's an example of something being integral or integrated.
26:05And that frame, the company frame is integral to the message, advertising message.
26:12The same is not true for the signs relationship to the building.
26:17There's a difference between being integrated, being an integral portion, fundamental portion of something, and merely being attached.
26:26So the the billboard analogy really is is fitting.
26:30And so um, and then of course, with the trees, imagine if the trees were not there.
26:37Perhaps there's a building there.
26:40And if there had been a building in those in that place, would one say, oh, I've got to move my sign out because there is a building in front, and we it impedes the view.
26:50So it's this is a case where um you know the location just hasn't been properly uh determined for this product and on this building.
26:59So that's the basis of my motion.
27:04Any further comments?
27:05Yeah, just real quick for city staff.
27:08How what what what input do you have on determining where this sign was proposed?
27:14So as far as the ordinance itself, I'm sorry, okay.
27:18Yeah, we don't have any direct guidance as far as exactly where the sign is located, only the sizing requirements of it, and that it cannot impede emergency egress.
27:29So for this historic district, you might want to lean in and probably have some sort of general overall guidance on something like this.
27:35Because slapping this up there, I know that the client worked with the with the city that we gave them comments, they moved it around.
27:41Um we tried to make it fit, but I agree with my fellow commissioners.
27:44It just doesn't look like it's the right place there.
27:45It looks like a billboard, it is a billboard.
27:48Um then, you know, what about projected growth?
27:52What if another building comes up like my fellow commissioner says?
27:54I mean, are you guys thinking about that from the city perspective?
27:57Future buildings development, growth, project marble, all that other junk.
28:02And so because this is a pilot program, a lot of the reason this is a pilot program is to go and find um a lot of these hiccups that we are seeing now so that if this does become a permanent program, we're able to address it.
28:16Well I hope that gets done.
28:17Um but yeah, I think my fellow commissioners have said everything that I that I wanted to convey.
28:26And um I that brought up one last point that I had uh come to mind.
28:32So what happens when those trees do grow?
28:34Do you keep raising the sign?
28:38On the city side, no.
28:40I mean, it would not be up to us if the sign company wanted to, they would have to go through the whole process again, and that would be outside the pilot program.
28:46So then it's gonna be out of the view again, and then you're gonna have to raise it up and then keep raising it to the heavens, and no.
28:52It just needs to be denied.
28:57Any further comments.
28:59All right, hearing none may have a roll call, please.
29:22Item number eight, please.
29:34Item number eight, uh, 462, Mary Louis.
29:37The applicant, uh Ramon Torres is here virtually.
29:40Um he is available to answer any questions that the commissioners may have.
29:48Ramon, are you there?
29:51Yes, we can hear you.
29:52Okay, this is Ramon Torres.
29:54I'm the general contractor for this project uh for about a year now.
30:00All right, thank you, sir.
30:00We have a few questions for you, Commissioner Vasquez.
30:05Uh I think you answered one of the questions right now when you said you've only been on the job for a year.
30:10But um do you know what happened to the garage?
30:15Oh, I know I I mean I kind of know the story, mind you, I can't verify uh this is coming from the homeowner, right?
30:20Uh, tell your version.
30:22Yeah, she's an elderly lady.
30:23Uh she went through a very, very uh big divorce in the last five, six years.
30:30Um the house, you know, she bought it from a gentleman, I believe that would that flip the house.
30:36Um she has been in a long battle with one with her ex-husband with contractors and whatnot.
30:43So she actually found me about a year ago, and that's when we started submitting uh from different uh sort of uh COAs.
30:52Um we you know, this is kind of evolving.
30:56Like she throws different stuff at me all the time, like hey, you know, I want to do a garage, I want to do a pool.
31:01We were just supposed to kind of um finish over or do the rehab on the main structure, uh, but it's evolved into something much bigger, right?
31:10Um to answer the question on the pool on the drawings.
31:14Um we do have a permit that's is for a pool, but it's for an indoor pool, which is below the addition uh where we're that we're building that you see on the pictures.
31:27So that's why it's not reflecting on the on the side plan.
31:32Well, my question was was really about when what the demolition of the garage was, but you brought up another uh concern which would be an indoor pool.
31:43And would that be a DSD concern?
31:46I know this isn't within purview of uh OHP, but is there anyone from DSD that or that y'all refer them to?
31:57We do have a permit.
31:59Yeah, I think for an indoor pool.
32:01I think I mean I I don't know what was approved as far as like an indoor pool goes, but the the present request is for the garage.
32:09And so um yeah, the applicant he can answer any questions related to that.
32:13I'm not sure if um correct me if I'm wrong, Mr.
32:16Torres, but do you do you know anything that happened to this garage that was um I guess pulled down sometime almost 20 years ago?
32:25I don't even think that I so the owner bought it in 07.
32:28I don't know if it was up.
32:31I I honestly I mean I can ask, but I don't I do not recall.
32:36Does anyone call it does anyone from the neighborhood suspicion when the uh garage was demolished?
32:50Anyone speaking come up and introduce themselves.
33:04Hello, my name is Bianca Maldonado, I'm president of the Monticello Park Neighborhood Association.
33:08And this demolition was reported to OHP.
33:11So I was um as a long-term resident of the neighborhood, I was kind of surprised it wasn't in the case history, because there is a history in the Hanson system of the permit being issued.
33:21We gave you the AP number where C of A was obtained to do repairs to that garage.
33:26So at some point when repairs were supposed to be done, what occurred was a demolition instead.
33:31Um I do know there was a former resident on that block that did raise concern multiple times.
33:36Uh obviously it's an outstanding issue.
33:39There are multiple concerns on this property.
33:41The goal is to obviously get to a resolution, of course.
33:44So remind me one more time when you said the repairs were allowed.
33:49In 2007, and we provided the AP number, um, the permit number in the Hansen systems 1375.
33:57You can't pull C of A's that far back.
34:00Um but knowing that there's a city permit that was issued on May 29th of 2007 indicates that there was a C of A that was also issued for those repairs.
34:08But there is no permit for demolition of the garage, and there is no permit for our so we assume there's no C of A, because it just disappeared.
34:18And uh the name while you're up there, so I I was trying to document your concerns um being the neighborhood that this house is in.
34:27Uh it was the carriage style doors.
34:30One to fenestration on the west side.
34:34On the western, there's no windows.
34:36There's just two garage doors and a pedestrian access door to the garage rendering.
34:42So we didn't want it to look like a storage unit.
34:45And then three was the sidewalk and apron reconstruction.
34:51Yes, if you look from Google Earth and Stephen, Mike, please, ma'am.
34:54Then I can introduce yourself.
34:55If you look from Google Earth from the street, you will see that there's a segment of driveway missing um next to the apron.
35:03And so the sidewalk is discontinuous and it's very rough and it holds water and it's just very challenging to diverse.
35:14We just had a lot of complaints of people that have fallen from the neighborhood.
35:21Question for the applicant.
35:24In that Google view, it looks like the driveway and apron have been removed and that it's just gravel, which also affected part of the sidewalk.
35:33Is that on I see on the side plan that it says existing drive and existing approach?
35:39Is there any intention to replace that apron sidewalk and driveway?
35:46And I actually just noted I bought a lot of plans and notice that it would be the design or put existing driveway.
36:04So staff with the staff, that would need to be a new application for a drive and approach.
36:18Torres, if you can submit a application for a certificate of appropriateness, staff would review the size of the apron as well as the driveway.
36:25Um and just a note, too, I did look at the Google Street View, and it's been in its present condition since 2007 as well.
36:31So modification of that would be approved administratively so long as it meets the um uh the thresholds described in guidelines.
36:46Are they other questions for the applicant?
36:53I move for approval.
36:56Um staff's recommendations.
37:03Is this for a COA or conceptual approval?
37:09Um I move for approval with all of staff stipulations with the added stipulation of uh appropriate size window windows be added to the west side of the structure uh that meet uh the guidelines and reviewed by staff.
37:40And can I add a are you done?
37:44Are you done with your motion?
37:46Can they ask that you add a carriage style door or appropriate door to the front of the garage?
38:04So we have a stipulation about material.
38:07It doesn't specifically say carriage style, which I would assume have some sort of like beam appearance, but that is up to you all.
38:16We would with the added stipulation with historic style doors as well as material is staple stipulated in staff's thank you.
38:25I'll second that motion.
38:28It's been moved and properly seconded.
38:32Chair, I would just like to say um or ask is the assumption that that driveway is compliant with historic uh design guidelines and doesn't exceed 11 feet in width.
38:45I don't think it's it's not dimension on the site plan, is it?
38:49Um I I don't believe it does it is, but anything beyond the traditional 10 feet wide concrete drive would require review by the compliance of technical advisory board.
39:02I mean, I'm sorry, comments.
39:05All right, hearing none may have a roll call, please.
39:26Item number 10, please.
39:40Agenda item number 10, HDRC case number 2025 288, uh, 1253 and 1255 East Crockett Street.
39:48The applicant is requesting conceptual approval to construct a two-story multifamily residential structure on the vacant lot at 1253 and 1255 East Crockett Street.
39:58This is located within the Dignity Hill Historic District.
40:05Staff recommends conceptual approval based on findings A through R with the following stipulations.
40:10One, that all my materials adhere to the guidelines for new constructions, new construction and specifications outlined in finding J.
40:18Two that the front street facing elevation be substantially revised to include the following.
40:23Additional finestration and traditional proportions and dimensions, that the applicant incorporate porch massing and details that are consistent with the guidelines and historic examples found on East Crockett.
40:34Essentially, the porch should be increased and historic details and column designs should be referenced.
40:40And that the cantilever balcony should also be incorporated into the new porch design and be supported by traditional columns.
40:47Three, that window materials adhere to the guidelines for new construction and the adopted window policy.
40:53Four, that all grouped windows be separated by a million of six inches in width, and that the rear and left elevations feature multiple window openings.
41:05That a detailed landscaping plan be submitted to the commission for review and approval.
41:10And then seven that all mechanical equipment be screened from view from the public right-of-way.
41:20He did note to me that he uh agrees with all of these.
41:23Um so there may be questions that can be followed up on that.
41:27Uh we also uh discussed uh him attending a design review committee meeting um as a follow-up to this.
41:33Uh and commissioners, there is a voicemail from the Dignity Hill Neighborhood Association.
41:40Can the applicant come up, please?
41:46State your name for the record, please, sir.
41:54I'm sorry, say again, please.
41:56Say again, I'm sorry.
41:58Recordable McCullough.
41:59I appreciate it, sir.
42:00Um you have anything you want to present about your case, sir.
42:07I understand you want to you agree to all staff stipulations.
42:10Is there anything else that you would like to add to that?
42:15So you have anything else to add?
42:17Do you understand that you agree to all the staff stipulations?
42:21Um any questions for the applicant?
42:24Chair, I just want to confirm that a DRC is part of the stipulation.
42:29He has agreed to is.
42:31You're agreed to that.
42:34If no questions for the applicant may have a motion, please.
42:37Commissioner Voicemail.
42:44Hello, this is Louis Francois, Chairperson of the Dignity Hill Neighborhood Association Historic Neighborhood Review Committee calling in on HDRT case number 288.
42:55We do not agree with staff's recommendations for approval.
42:59We understand this is a request for conceptual approval, but major architectural design requirements are either not provided or are not in accordance with historical guidelines, which requires us to recommend that the applicant go back to the drawing board and provide this information to staff and this commission prior to getting conceptual approval.
43:18Some of the major issues we have with this request include housing material that has not been specified, window material that has not been specified, porches that need to be redesigned to meet historical guidelines, penetration that is not consistent with other historic examples within the district or meet historic guidelines, an on-site parking plan that has not been provided, and a detailed landscaping plan that has not been provided.
43:44This is why we are asking that this case not be approved for conceptual approval.
43:54Any questions for the applicant?
43:58All right, hearing I may have a motion, please.
44:04I'll move for uh conceptual approval with all of staff stipulations and the added stipulation of a DRC.
44:14It's been moved and properly second.
44:16Is there any further discussion?
44:18Chair, I would like to add another comment.
44:21Um I uh I see that the neighborhood uh comments dovetails pretty well.
44:28Uh comments, which you are agreeing to.
44:30And that's something we these are the items we like to see at the next DRC.
44:35One of the items that was of great concern to for me was the roof form as you had a gable large prominent gable at the very top of that half story, and then how it switched over to a very, very low slope gable at the end because it's because it's turning into um a couple of dormer shed roofs.
44:57And I think that's really awkward, especially um it's awkward, period.
45:02But I think it's especially of concern because it's by the driveway and the car entryway on the east side.
45:12It's not as if it's right up to um uh another building um from the side street.
45:19What is that monumental?
45:20Um it is clearly visible, and it is an awkward looking form that is not historically found in the neighborhood, so I would consider I would ask you to consider redesigning that back and so that that roof form would conform with historic roof forms in the area.
45:37I actually did already right now on my head.
45:40You just have to go back to the drawing board.
45:43But that's a new fix.
45:45And I understand there's height issues on really um pleased that you're doing a story and a half and not a full two story because of the character of that block.
45:55And um I guess the other thing I'm concerned about that you should take into consideration is that the windows on the west side, both downstairs and upstairs, are very, very close to the neighbor, um, not quite 10 feet away.
46:09And just we can take a look at that at the DRC.
46:13Actually, at the beginning I did not want to put a windows on that site.
46:16Well, you need one or two.
46:17But yeah, but then then but it was one of the stipulations.
46:21So if you could be open to sort of those conversations, I greatly appreciate it.
46:28Uh I want to offer other commissioners opportunity to um make comments.
46:32Um Commissioner Galloway, do you have anything, sir?
46:38Thank you, Commissioner Vasquez.
46:42Thank you, Commissioner Holland.
46:44Thank you, Vice Chair Fesser.
46:46Uh nothing, thank you.
46:48Commissioner Cervantes.
46:51And finally, Commissioner Semino, any further comments?
46:56Maybe a roll call, please.
47:14Motion carries, thank you.
47:16Item number 11, please.
47:22Good afternoon, everyone.
47:23This is item number 11, HDRC case number 2025, 283 for 433 Madison Street.
47:31The applicant is requesting a certificate of appropriateness for approval to first remove existing stucco cladding on the first floor of the primary structure and replace it with natural hydrated lime plaster.
47:42Second, enclose the rear porch and balcony of the primary structure and render in natural hydrated lime plaster.
47:57Staff recommends approval of item one with the following stipulations.
48:00The lime plaster should adhere to the following one to three mixture ratio.
48:04One part white non-staining Portland cement, three parts hydrated lime or natural hydraulic lime and plaster or sand depending on the code for adhesion.
48:12And second, that the existing stucco be removed by hand if possible to avoid damage to the existing masonry.
48:18Staff recommends approval of item two with the following stipulations.
48:22One, that the footprint and dimensions of the existing porch and balcony remain unchanged.
48:26The enclosure should not exceed the original footprint of the structure.
48:30Two, that the dimensions of existing wood elements such as columns, exposed beams, and dental detailing be maintained and visible in the enclosure.
48:39Three, that wood siding or wood paneling be used as an exterior cladding material, resulting in a space that continues to read as a porch element.
48:49And four, that windows on the enclosure be consistent with the adopted policy guide as noted in finding D.
48:55The applicant should install fully wood windows that meet staff standard window stipulations and submit updated specifications to staff for review and approval.
49:03The windows should feature an instead of two inches within facades and should feature uh profiles that are found historically within the immediate vicinity.
49:11Meeting rails must be no taller than 1.25 inches and styles no wider than 2.25 inches.
49:18White manufacturers' color is not allowed, and color selection must be be presented to staff.
49:24There should be a minimum of two inches in depth between the front face of the window trim and the front face of the top window sash.
49:30This must be accomplished by recessing the window sufficiently within the opening or with the installation of additional window trim to add thickness.
49:38Window trim must feature a uh traditional dimensions and architecturally appropriate seal detail.
49:44Window track components must be painted to match the window trim or concealed by a wood window screen set within the opening.
49:51There is a letter in your folder from the King William Association agreeing with staff stipulations.
50:00The applicant, Michael and Mauricio is here in person and they have communicated with me that they do agree with staff's uh stipulations.
50:04Uh Michael Mauricio, if you'd like to come up and introduce yourself, you'll have 15 minutes to speak.
50:15Michael and Mauricio.
50:18So I understand that you are agreeing to all staff stipulations.
50:23Do you have anything you'd like to add?
50:27Do we have any questions for the applicants?
50:31Go ahead, Commissioner Vest.
50:33And this may be for staff, but and I think I heard it in uh what you're reading, Adrian.
50:38But um the enclosed space, um, it's gonna the dimensions are gonna match what's already there.
50:48So that's one of our stipulations that they do not add to the existing footprint of the structure.
50:53And then uh the roof line, is that changing at all?
50:58No, that was not part of the request.
51:00So the request is entirely to enclose the existing porch and balcony, and our stipulations are to retain all visible elements of the porch and balcony.
51:10I have a questions for the applicant.
51:13Um the application is to remove the stucco from the first floor on the masonry.
51:21On the second floor, is that uh also masonry or is that wood frame contained?
51:29Um the stucco has a fairly rough texture.
51:35Uh on the entire surface.
51:38And a are you intending to match that rough texture when you put the the lime plaster over the stone?
51:47We we're gonna do the hydraulic wash so that way it matches all the way across.
51:53Um Commissioners, uh just to clarify, I don't think you could so a little background on this house, and we have done a site visit and looked into it.
52:01Um the original home was a single-story Kalichi block or adobe structure, um, and then it was added to over time in limestone construction, solid limestone block.
52:12The second story, we believe is fully framed.
52:15And so at some point the owner had the idea, let's just stucco it all to make it match, which is pretty common, actually.
52:21Um unfortunately, the stucco that was applied is cement-based, and so as you know, when you apply a cement-based stucco to natural limestone, especially a soft masonry, um, that can hold water in where you don't want it, and that can lead to deterioration of the uh masonry itself.
52:38And so what is proposed as technically best practice, we're gonna be carefully removing the inappropriate stucco and installing a natural lime.
52:47Um it's more of a wash, um, it's not as thick.
52:51Um it you can do multiple layers and gain like a little bit of a texture.
52:55But it's mostly going to be a thinner um coating.
53:01And so it's not gonna I think you're gonna have a hard time matching the second floor, which is a different material.
53:07Um so I do expect there to be an ongoing conversation about how we um negotiate those that change in surfaces because I don't think you're gonna want to remove all of it on the second floor as well.
53:20So um so the goal here is not to match in my opinion.
53:25Um I know that it might look like more make it flow.
53:28You're gonna make it flow.
53:29You're gonna use um similar, I I you'll probably change the paint on the second floor so it's a similar color to the natural lime.
53:36Um, and that's all things that we can kind of work with in the process.
53:41So I guess the question is if you're not going to be able to match the thickness of the new lime wash with the stucco on the second floor, some sort of detail will need to be developed working with staff, whether it's a um some sort of wood band belt course that separates the two uh finishes.
54:04So in terms of the detailing on the the porch enclosure, you agreed to the staff stipulations that it be wood framed and uh wood clad as opposed to the lime wash.
54:24And question for staff, are you all comfortable with reviewing those proposed uh designs for the porch enclosure?
54:32And when we conducted our site visit, um, you know, one of the discussion points was as you can see here on this photograph, and then I'll go to this one right here.
54:43There is already an existing bay that's uh wood clad.
54:47So then one uh one point of discussion and basically where we're kind of going with our recommendation is that the enclosure mimic the existing bay that you see here on screen.
55:00And then yes we would absolutely um you know ask um that basically that the conversation be ongoing so that we review those plans thank you Mr.
55:11Chair my question is um also for staff um if you're requesting that the enclosed porch excuse me enclosed porch uh mimics or is responsive to the bay I would imagine we would need more windows on both the downstairs and the upstairs to give the impression that this is an enclosed porch so is that something that you're um I'm assuming you understand and agree that with that and that you understand that that's a possibility you may be in for a few more windows we did say the more windows the better okay yeah because that's what would make it convincing as an enclosed porch yes ma'am okay thank you thank you other questions may I have a motion please yes I'll move for approval with staff stipulations and uh offer the applicant and the owner the opportunity to come to a DRC if they want to review uh or get more feedback on the the design of the porch enclosure and the detailed design between the first and second floors may move the improperly second further discussion um hearing none of commissioners may have a roll call please galloway aye Vasquez Cervantes Yes Holland Fetzer and Gibbs aye motion carries motion carries thank you as the last case on the agenda um thank you everyone we are adjourned thank you everyone thank you Drew thank you happy Thanksgiving Happy Thanksgiving