All right, everyone, I have 330, so we're gonna call the SCP HCP coordinating committee meeting to order.

0:10

Can we start with roll call?

0:13

Mr.

0:14

Brock?

0:16

Present Mr.

0:19

Garcia?

0:23

Ms.

0:23

Simper?

0:25

Present.

0:26

Mr.

0:26

McLamry?

0:28

Present.

0:28

Mr.

0:29

Nino?

0:31

Present.

0:32

Chair Sparrow.

0:33

Present.

0:34

A quorum is present.

0:35

All right, thank you very much.

0:36

Do we have any public comment today?

0:38

So we did re Hold on.

0:40

So we did receive one public comment through email, and that was forwarded to the SCP coordinating commitment members this morning.

0:47

And we have one voicemail.

0:49

Okay.

0:49

And nobody has signed up to speak.

0:51

Great.

0:51

Can we go ahead and play the voicemail?

0:57

I live at 9525 Rochelle.

1:01

And I am calling regarding agenda item two on the HEPHCP agenda, a case ending 0015.

1:14

I was the planning chair for the Hebner Leoncree Community Plan and a contributor to the North Sector Plan.

1:23

This community's web page defines one of its purposes is to involve local stakeholders in conservation planning.

1:33

Google definition of local stakeholders and conservation planning is anyone in the community who live near, use, benefit from, or are affected by local natural resources or conservation conservation projects, be it individuals, residents, groups, businesses, or agencies.

1:57

Since your task is to involve local stakeholders in conservation planning, and it did not include any abutting residents, nor the city of Grey Forest, I'm going to formally request that you postpone your decision until you have engaged these local stakeholders in conservation planning as defined in your charter and as defined in the North Sector Plan.

2:23

Also, other biologists have reported additional endangered species that are missing from the provided case mitigation report.

2:34

These additional endangered species would have been discussed if you had involved your stakeholders.

2:40

Thank you very much.

2:41

Have a great day.

2:44

Okay, and no additional public comment, correct?

2:48

That is correct.

2:49

All right, thank you very much.

2:50

Uh let's move on to agenda item number one.

3:00

Good afternoon.

3:00

I'm Fallie Rodriguez, senior planner with the policy administration team.

3:04

Item number one is discussion and possible action on SCP HCP application for Journey Man Group.

3:10

The project is located at 19302 Babcock Road, San Antonio, Texas, 78255, and the project consists of approximately 17.58 acres and is located within Council District 8.

3:23

The owner is journeymen group and the consultant is Bowman Consulting Group.

3:28

The project is considering the future development of the project area as such.

3:33

The applicant wishes to enroll in the SCP-HCP to mitigate impacts to the SCP-HCP coverage species from the development activities.

3:42

The project area includes 3.47 acres of Golden Cheek Warbler, GCW habitat within the project area and 27.87 acres of GCW habitat within 300 feet of the project area.

3:56

The project area will require a total of 21 GCW conservation credits.

4:02

The project area does not have any black cap burial BCV habitat and will not require any BCV conservation credits.

4:23

Participation in the SCP HCP for this application will require the following GCW conservation credits of 168,000, occupied cars feature with occupied cave zone A access participation fee of 400,000, an occupied cars feature with occupied cave cave zone B access participation fee of 40,000 and a plan administration fee of $60,800.

4:51

The applicant has paid the $2,500 application fee, and the applic application the applicant will be required to pay the full mitigation fee of $668,800.

5:03

Sorry, $668,800 prior to completing enrollment in the plan.

5:07

Staff recommends approval and our biologist is here to answer any questions.

5:11

Okay.

5:11

Thank you very much.

5:12

We'll start with Commissioner Questions from my far left.

5:16

No questions.

5:19

No, any on my right?

5:21

Okay.

5:21

Hearing no questions, can we have a motion?

5:28

A motion to approve.

5:29

All right, and a second.

5:33

Second.

5:34

I'll give it to uh Commissioner McLamery.

5:37

All right.

5:37

Can we have a roll call vote, please?

5:40

Mr.

5:40

Nino?

5:42

Yes.

5:43

Mr.

5:43

McLamry?

5:45

Aye.

5:47

Mr.

5:48

Brock?

5:50

Aye.

5:51

Mr.

5:51

Garcia?

5:52

Yes.

5:53

Ms.

5:54

Simper?

5:55

Aye.

5:56

Chair Sparrow.

5:57

Yes.

5:58

Motion passes.

5:59

All right.

5:59

And then agenda item number two.

6:02

Item number two is discussion and possible action on SCP HCP application for Lenar Homes of Texas Incorporated.

6:09

The project is located northwest of the intersection of Scenic Loop Road and Bobcock Road.

6:13

This project consists of approximately 248.59 acres and is located within the ETG.

6:20

The owner is Lenar Homes of Texas and the consultant is Pape Dawson Consulting Engineers.

6:25

Lenar Homes of Texas is considering the future development of the project area.

6:30

As such, the application wishes to enroll in the SCP HCB to mitigate impacts to the SCP-HCP covered species from development from the development activities.

6:40

Project area includes $132.53 acres of golden cheek warbler GCW habitat within the project area and 80.94 acres of GCW habitat within 300 feet of the project area.

6:55

The project area will require a total of 302.11 GCW conservation credits.

7:02

Sorry.

7:03

The project area does not have any black capped various BCV habitat and will not require any BCV conservation credits.

7:10

The project area is located within CARZone 3A and CARZone 4B.

7:16

The total a total of 17.62 acres occurs within CARS Zone 3A and a total of 230.97 acres occurs within CARS Zone 4B.

7:26

The project area is located within is not located within any critical habitat units, nor is it within 750 feet of an occupied feature.

7:35

Participation in the SCP HCP for this application will require the following GCW conservation credits of $2,416,880, CARSON 3 and 4 participation fees of $17,620, and a plan administration fee of $243,450.

7:56

The applicant has paid the $2,500 application fee, and the applicant will be required to pay the full mitigation fee of $2,667,000.

8:14

Okay.

8:14

Starting with Commissioner questions from my left.

8:19

I have one for Jenny.

8:22

Based on the voicemail that was played, it indicated that there were new endangered species listed in Bear County.

8:28

Is that true?

8:30

Good afternoon.

8:31

This is Jenny Blair with Blair Wildlife Consulting.

8:34

So there are no new listed endangered species that we're aware of that have been recently listed since Fish and Wildlife approved the plan.

8:46

We have our covered species in which the plan you know covers, and that's what we have purview over.

8:53

If a project did have a say, for example, a salamander that we we don't cover, then we would not be able to approve enrollment for a project such as that.

9:05

I guess just uh a hypothetical say we had that salamander at some point.

9:10

Could this permit be amended to include that?

9:13

Yeah.

9:14

We could the key the I guess the permittees could decide to amend the plan if as necessary to add species onto it in the future at such time as they're listed.

9:29

Okay, thank you.

9:30

Thank you.

9:32

Okay, any other questions to my left?

9:34

To my right?

9:35

Okay, I'll take a motion then for a motion.

10:01

Second.

10:04

I'll second.

10:05

Okay.

10:07

And can we get a roll call vote?

10:11

Chair Spiral?

10:12

Yes.

10:14

Mr.

10:15

Nino?

10:16

Yes.

10:16

Mr.

10:17

Brock.

10:19

Aye.

10:20

Mr.

10:20

Garcia?

10:22

Yes.

10:23

Ms.

10:24

Simper?

10:25

Aye.

10:27

Mr.

10:28

McGlammery.

10:29

Aye.

10:30

Motion passes.

10:31

Okay.

10:32

And we'll take agenda item number three.

10:50

Good afternoon.

10:51

This is Riley Bosegir Senior Planner with the Development Services Department, Policy Administration Team.

10:57

Item number three is discussion and possible action on SCP HCP application for San Antonio Water System.

11:04

Um application ending in 0008.

11:08

The project is located along IH 10 from La Contra Parkway through Camp Bullis Road.

11:14

This project consists of approximately 13.886 acres and is located within Council District 8.

11:20

The owner is San Antonio Water System and the consultant is SWCA Incorporated.

11:27

San Antonio Water System is considering the future development of the project area.

11:33

As such, the applicant wishes to enroll in the SCP-HCP to mitigate impacts to the SCP-HCP covered species from the development activities.

11:41

The project area includes 0.4 acres of golden cheeked warbler GCW habitat with within the project area and 17.11 acres of GCW habitat within 300 feet of the project area.

11:53

The project area will require a total of 10 GCW conservation credits.

11:58

The project area does not have any black cap virio BCV habitat and will not require any BCV conservation credits.

12:06

The project area is located over Car Zone 1 and Car Zone 4B.

12:10

A total of 8.31 acres occurs within car zone one and a total of 5.58 acres occurs within car zone 4B.

12:18

The project area is not located within any critical habitat units, nor is it within 750 feet of an occupied feature.

12:26

Participation in the SCP HCP for this application will require the following GCW conservation credits fee of $80,000, car zone 1 and 2 participation fee of $8,310, and a plan administration fee of $8,831.

12:43

The applicant has paid the $2,500 application fee.

12:46

The applicant will be required to pay the full mitigation fee of $97,141 prior to completing the enrollment in the plan.

12:54

Staff recommends approval and our biologist is here to answer questions.

12:58

Okay.

12:59

Thank you very much.

13:00

Any commissioner questions from my left?

13:03

And from my right?

13:04

Hearing none, can we get a motion?

13:09

Motion to approve.

13:11

And a second?

13:13

Second.

13:13

All right.

13:14

Roll call vote, please.

13:18

Mr.

13:18

Brock.

13:20

Aye.

13:22

Mr.

13:22

McLamry.

13:24

Aye.

13:25

Mr.

13:25

Nino?

13:27

Yes.

13:27

Mr.

13:28

Garcia?

13:29

Yes.

13:30

Ms.

13:30

Simper?

13:31

Aye.

13:32

Chair Sparrow.

13:33

Yes.

13:33

Motion passes.

13:35

All right.

13:35

And agenda item number four.

13:42

Item number four is discussion and possible action on SCP app HCP application for Old Camp Bulls Partners LTD.

13:49

Application ending in 0006.

13:52

This project is located at 6194 Old Camp Bullis Road.

13:56

The project consists of approximately 4.393 acres and is located within Council District 8.

14:03

The owner is Old Camp Bullis Partners LTD.

14:06

The consultant is Bowman Consulting Group.

14:08

Old Camp Bullis Partners is considering the future development of the project area.

14:12

As such, the applicant wishes to enroll in the SCP-HCP to mitigate impacts to the SCP-HCP covered species from the development activities.

14:20

Project area includes zero acres of GCW habitat within the project area and 6.39 acres of GCW habitat within 300 feet of the project area.

14:30

The project area will require will require a total of 3.5 GCW conservation credits.

14:36

Project area does not have any BCV habitat and will not require any BCV conservation credits.

14:42

Project area is located over CAR Zone 1 and CAR Zone 4B.

14:47

A total of 3.91 acres occurs within CARSone 1 and a total of 0.48 acres occurs within CAR Zone 4B.

14:54

The project is not located within any critical habitat units, nor is it within 750 feet of an occupied feature.

15:02

Participation in the SCP HCP for this application will require the following.

15:06

GCW conservation credits fee of $28,000, car zone 1 and 2 participation fee of $3,910, and a plan administration fee of $3,191.

15:19

The applicant has paid the $2,500 application fee.

15:22

The applicant will be required to pay the full mitigation fee of $35,101 prior to completing enrollment in the plan.

15:29

Staff recommends approval and our biologist is here to answer questions.

15:34

Thank you very much.

15:35

Any questions for my left?

15:38

Yep.

15:39

So Jenny, because the this is a little bit new.

15:44

So is that golden cheek warbler habitat that they actually within that area that's indirect for this but because there is no habitat on their property, it's indirectly impacting it.

15:58

That's correct.

15:59

So the plan requires that when we're we're assessing impacts for warbler habitat, we have to talk or we have to assess what is within the property to be enrolled itself and all habitat surrounding it up to 300 feet outside of the property.

16:16

And so that's why there's only indirect impacts associated with this one because within the property itself, there isn't any edge that um extends in from the surrounding habitat, but there is surrounding habitat within 300 feet.

16:32

Yeah, that's what I noticed.

16:33

It's like, well, there's only like maybe three trees on there, so it's correct.

16:37

Yeah.

16:40

Okay.

16:40

Any other questions for my left?

16:43

From my right?

16:44

If not, can we get a motion?

16:47

Motion to approve.

16:50

Second.

16:51

From Commissioner Garcia, okay.

16:54

And can we have a roll call vote?

16:56

Mr.

16:57

McLamry?

16:58

Aye.

16:59

Mr.

17:00

Garcia?

17:01

Yes.

17:02

Mr.

17:02

Brock?

17:04

Aye.

17:05

Mr.

17:05

Ms.

17:05

Simper?

17:06

Aye.

17:07

Mr.

17:08

Nino?

17:09

Yes.

17:10

Chair Sparrow?

17:11

Yes.

17:11

Motion passes.

17:12

All right.

17:12

Last item on the agenda is approval of the minutes from our November 25th meeting.

17:17

Were there any corrections to the minutes?

17:20

I believe I have a correction if I can have Bruna come up for a second.

17:33

Good afternoon.

17:34

Good afternoon.

17:35

Uh I don't know if you can see the comment that's there regarding what you stated at the last meeting.

17:42

But I had asked a question that because Guadalote Ranch is about 1,100 acre development, of which I don't know what 300 acres so far has been studied at this point.

17:58

That within that remaining 800 acres, is there a possibility that there might be a conservation easement that you might be able to present to the SCP HCP?

18:11

Um that the way that this is written, it looks like it just indicated that that was going to come up on this agenda, which it's not.

18:19

Uh but I just wanted to make sure that that's the same.

18:23

Yeah, it would be good if we could correct that.

18:25

There is no plans for a bank like you like you asked, right?

18:30

Rather than enrollment, we are enrolling by the phasing of the development.

18:35

Um in that future 800 acres still yet to be studied.

18:40

Is there a possibility that of that there might be?

18:43

What was my question?

18:45

So my I'm not a biologist, but my understanding is that the quality uh of the habitat for warbler would not be considered for um for us to be able to uh make a bank out of it.

19:00

Um we have studied the entire area.

19:02

We're just enrolling as needed for the development.

19:05

This is a very large development, so I am unaware of us proposing to create credits out of this project for warbler.

19:15

So if if we were to amend the minutes to this meeting to specify that at this time there is no plans for a bank that you intend to enroll by phase development, you would say that's accurate?

19:25

Yes.

19:26

Is that more clear for the minutes?

19:28

Yes, that could be correct.

19:30

Okay.

19:30

So can we have a motion as amended to include that language?

19:35

I move to approve with the amended language as just discussed.

19:40

And a second.

19:43

I'll second it.

19:44

Okay.

19:45

And we'll do a roll call vote, please.

19:48

Mr.

19:48

Brock.

19:50

Aye.

19:51

Ms.

19:51

Simper?

19:52

Aye.

19:53

Mr.

19:54

Garcia?

19:55

Yes.

19:57

Mr.

19:58

McLamry?

19:59

Aye.

20:00

Mr.

20:00

Nino?

20:01

Yes.

20:02

Chair Sparrow?

20:03

Yes.

20:04

Approve with amendments.

20:05

All right.

20:05

The time is 350 and that concludes the meeting.

Discussion Breakdown — Share of Meeting
Environmental Protection█████████████████████████████████████████████75%
Procedural███████████████25%
Summary of Proceedings

SCP HCP Coordinating Committee Meeting Summary (December 9, 2025)

The SCP HCP Coordinating Committee convened to review four conservation permit applications, assess public concerns regarding stakeholder engagement, and ratify amendments to the minutes from the November 25th meeting. The committee heard a voicemail from a community resident objecting to the exclusion of abutting residents and the City of Grey Forest from the consultation process for a specific application, while also clarifying the scope of future species listings. Four applications were discussed in detail, covering development impacts to Golden-cheeked Warbler habitat, and all were unanimously approved following committee deliberation and a final vote on the corrected minutes.

Consent Calendar

  • No separate consent calendar items were listed; routine applications were treated as standard discussion and vote items.

Public Comments & Testimony

  • Voicemail from Resident at 9525 Rochelle:
    • Position: Expressed formal opposition to Agenda Item 2 and requested a postponement of the decision.
    • Arguments: Stated that the charter and North Sector Plan require the involvement of "local stakeholders" defined as those living near, using, or affected by conservation projects. The speaker argued this definition was not met as abutting residents and the City of Grey Forest were excluded from the process.
    • Additional Concern: Noted that other biologists have reported additional endangered species missing from the mitigation report for the specific case, which were allegedly not discussed due to the lack of stakeholder engagement.

Discussion Items

  • Agenda Item 1: Journey Man Group (Application ending 0015)

    • Proposal: Enrollment to mitigate impacts on 17.58 acres in Council District 8, requiring 21 GCW conservation credits and fees totaling $668,800.
    • Deliberation: Staff recommended approval; no commissioner questions were raised. The biologist was available to answer questions but none were solicited.
    • Position of Members: All commissioners voted in favor of the application.
  • Agenda Item 2: Lenar Homes of Texas Incorporated (Application ending 0015)

    • Proposal: Enrollment to mitigate impacts on 248.59 acres in the ETG, requiring 302.11 GCW conservation credits and fees totaling $2,667,000.
    • Public Comment Context: Commissioner Nino referenced the voicemail regarding new endangered species in Bexar County.
    • Clarification: Biologist Jenny Blair (Blair Wildlife Consulting) expressed that no new endangered species have been recently listed since the plan's approval. She stated that the committee has purview only over currently covered species. She confirmed that if a non-covered species (e.g., a salamander) were to be listed in the future, the permit could be amended to include it if the permittee decided. She did not express opposition to the current application.
    • Position of Members: No other questions were raised; all commissioners voted in favor.
  • Agenda Item 3: San Antonio Water System (Application ending 0008)

    • Proposal: Enrollment to mitigate impacts on 13.886 acres along IH 10, requiring 10 GCW conservation credits and fees totaling $97,141.
    • Deliberation: Staff recommended approval; no commissioner questions were raised.
    • Position of Members: All commissioners voted in favor.
  • Agenda Item 4: Old Camp Bulls Partners LTD (Application ending 0006)

    • Proposal: Enrollment to mitigate impacts on 4.393 acres (0 acres of direct GCW habitat, 6.39 acres within 300 feet), requiring 3.5 GCW conservation credits and fees totaling $35,101.
    • Deliberation: Commissioner Garcia questioned the nature of the habitat impact. Biologist Jenny Blair explained that the 6.39 acres represents indirect impacts found within the required 300-foot buffer surrounding the property, not direct habitat on the site itself. She confirmed the assessment protocol requires evaluating both on-site and surrounding habitat up to 300 feet.
    • Position of Members: No further opposition expressed; all commissioners voted in favor.
  • Minutes Correction (November 25th Meeting)

    • Proposal: Correction to clarify status of Guadalote Ranch (1,100 acres).
    • Clarification: Commissioner expressed concern that minutes implied a conservation easement/bank was proposed for the remaining 800 acres. Biologist clarified there are currently no plans for a bank; the development will enroll phases as studied. It was noted that habitat quality for warblers in the remaining undeveloped acres would not qualify for a bank under current parameters.
    • Amendment: Motion to approve minutes with language stating: "At this time there are no plans for a bank... [we are] enrolling by the phasing of the development."

Key Outcomes

  • Approvals:
    • Journey Man Group: Motion passed 5-0. Applicant required to pay $668,800.
    • Lenar Homes of Texas: Motion passed 5-0. Applicant required to pay $2,667,000.
    • San Antonio Water System: Motion passed 5-0. Applicant required to pay $97,141.
    • Old Camp Bulls Partners LTD: Motion passed 5-0. Applicant required to pay $35,101.
  • Minutes: Approved with amendments to reflect that Guadalote Ranch is enrolling by phasing development with no current plans for a conservation bank.
  • Next Steps: Applicants to finalize fee payments prior to completing enrollment in the SCP HCP plan.
  • Clarifications Made:
    • Confirmed no new endangered species listings exist that would impede current approvals.
    • Clarified that non-covered species could be added via permit amendment in the future if listed.
    • Clarified the definition of "indirect impacts" regarding 300-foot habitat buffers.
    • Clarified the methodology for Guadalote Ranch enrollment (phased vs. banking).

Meeting Transcript

All right, everyone, I have 330, so we're gonna call the SCP HCP coordinating committee meeting to order. Can we start with roll call? Mr. Brock? Present Mr. Garcia? Ms. Simper? Present. Mr. McLamry? Present. Mr. Nino? Present. Chair Sparrow. Present. A quorum is present. All right, thank you very much. Do we have any public comment today? So we did re Hold on. So we did receive one public comment through email, and that was forwarded to the SCP coordinating commitment members this morning. And we have one voicemail. Okay. And nobody has signed up to speak. Great. Can we go ahead and play the voicemail? I live at 9525 Rochelle. And I am calling regarding agenda item two on the HEPHCP agenda, a case ending 0015. I was the planning chair for the Hebner Leoncree Community Plan and a contributor to the North Sector Plan. This community's web page defines one of its purposes is to involve local stakeholders in conservation planning. Google definition of local stakeholders and conservation planning is anyone in the community who live near, use, benefit from, or are affected by local natural resources or conservation conservation projects, be it individuals, residents, groups, businesses, or agencies. Since your task is to involve local stakeholders in conservation planning, and it did not include any abutting residents, nor the city of Grey Forest, I'm going to formally request that you postpone your decision until you have engaged these local stakeholders in conservation planning as defined in your charter and as defined in the North Sector Plan. Also, other biologists have reported additional endangered species that are missing from the provided case mitigation report. These additional endangered species would have been discussed if you had involved your stakeholders. Thank you very much. Have a great day. Okay, and no additional public comment, correct? That is correct. All right, thank you very much. Uh let's move on to agenda item number one. Good afternoon. I'm Fallie Rodriguez, senior planner with the policy administration team. Item number one is discussion and possible action on SCP HCP application for Journey Man Group. The project is located at 19302 Babcock Road, San Antonio, Texas, 78255, and the project consists of approximately 17.58 acres and is located within Council District 8. The owner is journeymen group and the consultant is Bowman Consulting Group. The project is considering the future development of the project area as such. The applicant wishes to enroll in the SCP-HCP to mitigate impacts to the SCP-HCP coverage species from the development activities. The project area includes 3.47 acres of Golden Cheek Warbler, GCW habitat within the project area and 27.87 acres of GCW habitat within 300 feet of the project area. The project area will require a total of 21 GCW conservation credits.

SUMMARIZED BY OPENPUBLICA AI
TRANSCRIPT VIA PUBLIC VIDEO
openpublica.com