OPENPUBLICA · PUBLIC MEETING RECORD
Record of Proceedings

San Diego Infrastructure Committee Meeting - September 20, 2017

Active Transportation & Infrastructure CommitteeWednesday, September 20, 2017
BodySan Diego, California
SessionActive Transportation & Infrastructure Committee
DateWednesday, September 20, 2017
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
1:21

I'm sorry, sorry, sorry, it's gone.

1:25

Sorry, sorry, sorry, it's called Sorry, sorry, sorry, it's come.

1:34

Sorry, sorry it's gone.

1:52

It's safe to say forgive what I've done wrong.

2:06

So I can do it.

2:33

Your access to City Halloween.

6:04

Good afternoon, everybody.

6:06

Thank you for joining us for today's meeting of the infrastructure committee.

6:09

Today is uh September 20th, 2017.

6:11

We all enjoyed your time off this summer.

6:13

Let the record reflect.

6:14

We're joined by a full committee, including Vice Chair Ward, Councilmember Zaf and Gomez.

6:18

We also have our city attorney representative, Mark Mercer, our IBA representative, Jillian Cassie, our mayor representative Alejandra.

6:26

Says or Marshall, but it's definitely Alejandra.

6:28

And our infrastructure committee consultant, of course, Lee Friedman.

6:31

I'd like to thank the uh members of the uh public who are here or watching us on television on City TV.

6:36

We'll of course get started with non-agenda public comment.

6:39

We have one member of the public, Martha Welch.

6:41

Come forward, you have two minutes life work?

6:48

Martha Welch.

6:50

Yesterday we saw something about roads and also in Turkro, same problem.

6:54

She talked about uh her road is so bad, and and the other one got paved because not so uh easier, but her didn't get paved.

7:02

Turquo same pay uh um cold and and they it's really bad, and other up here would get um was uh paved.

7:09

Why?

7:10

Because they're easier.

7:11

I saw I saw that all the time on market, same thing.

7:14

They don't need the but it doesn't need it.

7:17

I drive uh the bus goes there all the time and doesn't need it.

7:19

So what do you do?

7:20

You the easiest one, that's what you like to do.

7:22

You don't the old ones, you don't you don't do it.

7:24

Why?

7:25

Because you lie to them all the time.

7:26

Years and years to collect.

7:28

You always say next time, next time, next time, next summer, next summer.

7:31

It's uh and you you lie to these people uh all the time.

7:35

Why?

7:35

Because we don't have people to do it on the city.

7:37

That's why you saw you said we have to have a contract.

7:40

Well, because it's private, obviously we don't have workers because we don't want we don't want workers because the pension plan is something like that.

7:47

So we don't have workers.

7:49

And so we can and also if we we had a contract that was right, we'd have an open end with so much money to work your potholes.

7:56

We won't do that because you have to send similar um uh in um injured uh and um um uh civil um can't say it right now, I'm sorry about that.

8:10

So, you know, that's what goes on here.

8:13

Um potholes all over this place.

8:15

Uh and the and the city beat, they had one that was all across over across the driveway.

8:21

And uh everywhere I look there's potholes.

8:24

Everywhere I look, there's potholes, and they'll get fixed, and we told next year, next year, next year.

8:28

But never happens.

8:30

And so um also um San You C or and the trans uh the other transits has plans, but I don't see it here like the other one, uh other library.

8:39

So is it happy or not, or just a uh or just a lie of that library because it's not on your agenda.

8:45

I've never seen it.

8:47

And uh it's turning to committee comment.

8:52

Uh would any member of the committee like to make a comment at this time?

8:54

Seeing none, we'll turn to City Attorney IBA mayoral staff comment.

8:59

Jillian Um Gillian can see from the IBA.

9:03

I just wanted to um let everybody know that the um annual update to the uh citizens guide to infrastructure is being released today.

9:11

So just look out for that.

9:13

Thank you.

9:14

We shall.

Discussion Breakdown — Share of Meeting
Procedural████████████████████████24%
Public Works█████████████████████21%
Parks and Recreation█████████████████17%
Libraries████████████████16%
Pipeline Construction██████████10%
Public Comment████████8%
Road Maintenance████4%
Summary of Proceedings

San Diego Infrastructure Committee Meeting - September 20, 2017

The Infrastructure Committee of the San Diego City Council met on September 20, 2017, at 2:00 P.M. in Council Chambers. The meeting was chaired by Chair Kirsey, with Vice Chair Ward, Councilmember Zaf, and Councilmember Gomez present, along with City Attorney representative Mark Mercer, IBA representative Jillian Cassie, Mayor's representative Alejandra, and committee consultant Lee Friedman. The committee addressed three discussion items: a $6.1 million pipeline design agreement, a reallocation of park improvement funds for Chollas Lake playgrounds, and a $1.2 million library design consultant agreement. All three items were approved unanimously, and the meeting lasted approximately 24 minutes.

Consent Calendar

  • No consent agenda items were presented at this meeting.
  • The committee approved the meeting minutes from August 2, 2017, as distributed, without objection.

Public Comments & Testimony

  • Martha Welch, speaking during non-agenda public comment, expressed strong frustration about road conditions and potholes throughout the city, alleging that the city repeatedly promises residents that roads will be paved "next year" or "next summer" but never follows through, and that easier roads get paved while worse ones are neglected. She also claimed the city lacks sufficient in-house workers due to pension concerns and questioned whether a library project she had heard about would actually appear on the agenda.
  • During the Chollas Lake playground item, Ms. Welch expressed support for the project, stating she was glad to see it moving forward and that she has a personal connection to the lake.

Discussion Items

  • Agreement with Kennedy/Jenks Consultants, Inc. for Alvarado 2nd Pipeline Extension (H166752): Deputy Director Akron Bassione and Assistant Deputy Director Abby Palisade of the Public Works Department presented a request to approve a $6.1 million agreement with Kennedy/Jenks Consultants, Inc. for design, environmental, and construction support services. The project includes a brand-new 48-inch and 30-inch pipeline starting at West Michim Bay Drive and extending along SeaWorld Drive, Hazard Center Drive, and Friars Road to the east side of I-805, plus replacement of a 16-inch asbestos cement pipe along Friars Road. The total project is estimated at approximately $53 million, including about $42 million in construction hard costs and $10.9 million in soft costs. Design is expected to take two years (completing late 2019), followed by approximately six months to bid and award the construction contract, with construction anticipated to take up to two and a half years, completing by 2023. Vice Chair Ward raised questions about the timeline, which presenters attributed to the project's roughly 10-mile length, three freeway crossings, two railroad crossings, fault analysis, and extensive permitting requirements. Ward also asked about the replacement pipe material; presenters confirmed the asbestos cement pipe would be replaced with PVC pipe, which has an expected lifespan of about 75 years. Staff noted that because the construction contract will exceed $30 million, they will return to the committee for approval before awarding it.
  • Reallocation of Regional Park Improvement Funds from L18001 Chollas Lake Improvements to S14002 Chollas Lake Park Playground Improvements: Assistant Director Andy Field of the Parks and Recreation Department presented a request to reallocate approximately $300,000 from the Chollas Lake Improvements project (L18001) to the Chollas Lake Park Playground Improvements project (S14002). The playground project includes new playgrounds at Gloria's Mesa (ages 2-5 and 5-12) and at Friday's Gate (all ages), replacing very old equipment. The first two playgrounds at Gloria's Mesa are fully funded and already slated to begin construction. The reallocation would fund the Friday's Gate playground, which the community views as an essential increment, while leaving $200,000 in the improvements project for future work. The improvements project is intended to bring electrical power and security lighting to the lake, which currently has no power on its entire eastern edge, plus solar panels and other improvements. The Regional Park Improvement Oversight Committee approved the reallocation during the summer. Councilmember Gomez expressed familiarity with the area and support for directing resources to it.
  • Consultant Agreement with Architects Hanna Gabriel Wells for Pacific Highlands Ranch Branch Library: Acting Deputy Director Elif Chitin of the Public Works Department's Architectural Engineering Parks Division presented a request to award a $1.2 million consultant agreement with Architects Hanna Gabriel Wells for design and construction support services for a new library. The library will be approximately 18,000 square feet on a 1.5-acre site, including a large community meeting room, teen and children's areas, study rooms, a catering (warm-up) kitchen, and patio and exterior seating areas. The library will serve the Pacific Highlands Ranch, Black Mountain Ranch, Tory Highlands, and Del Mar Mesa communities, located immediately north of Highway 56 and east of Highway 5, near Carmel Mountain Road, directly across from a community park. The estimated total project budget is just over $19 million, funded by FBA (Facilities Benefit Assessment) funds received in increments. Design is scheduled to begin in fall 2017, with construction documents advertised in summer 2019, construction starting in winter 2019-2020, and completion estimated in summer 2021. Chair Kirsey asked about the city managing developer-funded projects; project officer Cynthia Meinhart explained that city-managed projects are typically more efficient and cost-effective because developers managing projects still require city oversight, making it more expensive. Regarding the catering kitchen, Meinhart clarified that a warm-up kitchen avoids the extensive county permitting requirements (including grease traps) associated with full food preparation kitchens.

Key Outcomes

  • Approved the agreement with Kennedy/Jenks Consultants, Inc. for design and construction support services for the Alvarado 2nd Pipeline Extension, in the amount of $6.1 million, including a 10% contingency. Motion by Vice Chair Ward, seconded by Councilmember Gomez; carried unanimously.
  • Approved the reallocation of Regional Park Improvement Funds from L18001 Chollas Lake Improvements to S14002 Chollas Lake Park Playground Improvements, in the amount of approximately $300,000. Motion by Councilmember Gomez, seconded by Vice Chair Ward; carried unanimously.
  • Approved the consultant agreement with Architects Hanna Gabriel Wells for design services for the Pacific Highlands Ranch Branch Library, in the amount of $1.2 million. Motion by Vice Chair Ward, seconded by Councilmember Gomez; carried unanimously.
  • The next Infrastructure Committee meeting was scheduled for October 25, 2017.

Meeting Transcript

I'm sorry, sorry, sorry, it's gone. Sorry, sorry, sorry, it's called Sorry, sorry, sorry, it's come. Sorry, sorry it's gone. It's safe to say forgive what I've done wrong. So I can do it. Your access to City Halloween. Good afternoon, everybody. Thank you for joining us for today's meeting of the infrastructure committee. Today is uh September 20th, 2017. We all enjoyed your time off this summer. Let the record reflect. We're joined by a full committee, including Vice Chair Ward, Councilmember Zaf and Gomez. We also have our city attorney representative, Mark Mercer, our IBA representative, Jillian Cassie, our mayor representative Alejandra. Says or Marshall, but it's definitely Alejandra. And our infrastructure committee consultant, of course, Lee Friedman. I'd like to thank the uh members of the uh public who are here or watching us on television on City TV. We'll of course get started with non-agenda public comment. We have one member of the public, Martha Welch. Come forward, you have two minutes life work? Martha Welch. Yesterday we saw something about roads and also in Turkro, same problem. She talked about uh her road is so bad, and and the other one got paved because not so uh easier, but her didn't get paved. Turquo same pay uh um cold and and they it's really bad, and other up here would get um was uh paved. Why? Because they're easier. I saw I saw that all the time on market, same thing. They don't need the but it doesn't need it. I drive uh the bus goes there all the time and doesn't need it. So what do you do? You the easiest one, that's what you like to do. You don't the old ones, you don't you don't do it. Why? Because you lie to them all the time. Years and years to collect. You always say next time, next time, next time, next summer, next summer. It's uh and you you lie to these people uh all the time. Why? Because we don't have people to do it on the city. That's why you saw you said we have to have a contract. Well, because it's private, obviously we don't have workers because we don't want we don't want workers because the pension plan is something like that. So we don't have workers. And so we can and also if we we had a contract that was right, we'd have an open end with so much money to work your potholes. We won't do that because you have to send similar um uh in um injured uh and um um uh civil um can't say it right now, I'm sorry about that. So, you know, that's what goes on here. Um potholes all over this place. Uh and the and the city beat, they had one that was all across over across the driveway. And uh everywhere I look there's potholes. Everywhere I look, there's potholes, and they'll get fixed, and we told next year, next year, next year. But never happens. And so um also um San You C or and the trans uh the other transits has plans, but I don't see it here like the other one, uh other library.

SUMMARIZED BY OPENPUBLICA AI
TRANSCRIPT VIA PUBLIC VIDEO
openpublica.com