The Infrastructure Committee of the San Diego City Council met on Wednesday, October 24, 2018, at 10:00 AM. The meeting included non-agenda public comment, approval of a consent agenda, an informational update on the Balboa Park Plaza de Panama project, and action items on bicycle improvements, an interchange project amendment, and ratification of emergency contracts. The committee also approved the minutes from the September 26, 2018 meeting.
Good afternoon, everybody. We're gonna go ahead and get started. Uh today is Wednesday, October twenty-fourth, twenty eighteen. Welcome to the October meeting of the infrastructure committee. Let the record reflect that we are joined by Vice Chair Ward, Council Member Zeff. I think or no, you're not Vice Chair anywhere. Alvarez is Vice Chair, my bad. Uh it's been, you know, eleven months. Um Victor Alvarez will be joining us later, I believe. Uh, we also have our City Attorney Representative Tina Ray, we have our IBA representative Jillian Jillian Cassie, and our mayor representative Lee Friedman, as well as our committee consultant Justin Garber like to thank the members of the public who are with us today. Uh, I'm a little bit under the weather, so we're gonna get through this as expeditiously as possible because I think we may be losing uh a committee member at some point anyway. So we'll start with an unagenda public comment. Each member of the public has two minutes to speak, starting with Robert Buck. And then going to Martha Welch. You have now created a scenario that will go something like this. There will be a hard obstruction in a sewer line that no amount of flushing and water will wash out. And because of the fragile nature of this liner, where you will you'll stick a still auger into the sewer and try to retrieve the obstruction, you would damage the lining, thereby voiding the 25-year warranty and possibly damaging the liner. So your other option is to dig it up. The sewer laterals are the sewer laterals were the responsibility of the individual property owner to maintain as needed. Now, if they run an auger down it, they can severely affect the functioning of that lateral, and the city is going to have to repair that lateral. This product that you are putting in is not meant to be a replacement for a perfectly functioning pipe. It is meant to extend the service life of a malfunctioning deteriorating system a little bit longer. That's it. Next one. Thank you, sir. Martha Welch. Mark Bros. I've been in meeting for three years. I never saw you vote for two minutes and the committee. You didn't do that. There's a lawsuit about this, also, I think, because um you didn't vote for that. Now where we have all these pumps um where the where they go? Because um we don't have a sewer plant at all. Online, no, we don't have one. Point in the only is water. So where does it go? Where do you pump to? I don't know. You know you do dry sewer. That's what you do. Now where these pumps go, I don't know. Now, potholes and cracks. Now on um uh downtown where I live. Now on 11th and 10th and market and Broadway all cracked up. They're all cracked up, big cracks all over there. It's it's been maybe 20 years to fix this or something. I don't know, because it's all cracked up. There's the big cracks on market and Broadway and 10th and 11th, and it's 9th, it's all is it's it's it's all cracked up. It's just it's all cracked up. It's not fit in the sidewalks or up and down, all that stuff, and um it's not right what you do here.