The Infrastructure Committee met on December 4, 2018, to discuss several items including an update on the Balboa Park Plaza de Panama project, a cooperative agreement for bicycle improvements, an amendment for engineering services on the Palm Avenue/I-805 interchange project, and ratification of emergency sole source contracts. Public comments were heard on the Plaza de Panama project and non-agenda items. All action items were approved unanimously.
Good afternoon, everybody. We're gonna go get ahead and get started. Uh today is Wednesday, October 24, 2018. Welcome to the October meeting of the infrastructure committee. Well, the record reflect that we are joined by Vice Chair Ward, Councilmember Zeff. I think, or no, you're not vice chair anywhere. Alvarez is vice chair, my bad. Uh it's been you know 11 months. Um Victor Alvarez will be joining us later, I believe. Uh we also have our City Attorney Representative Tina Ray. We have our IBA representative Jillian Cassie and our mayor representative Lee Friedman, as well as our committee consultant Justin Garber. I'd like to thank the members of the public who are with us today. Uh I'm a little bit under the weather, so we're gonna get through this as expeditiously as possible because I think we may be losing uh a committee member at some point anyway. So we'll start with non-agenda public comment. Each member of the public has two minutes to speak, starting with Robert Buck. And then going to Martha Welch. Hello, my name is Robert Buck, retiree plumbers and pipe fitters local 230. I am here today to inform you of your liability and culpability by replacing and religion perfectly functioning sewer pipes that have a 2,000-year service life with an inferior product and for no reason at all. You have now created a scenario that will go something like this. There will be a hard obstruction in a sewer line that no amount of flushing and water will wash out. And because of the fragile nature of this liner, where you will you will stick a still auger into the sewer and try to retrieve the obstruction, you would damage the lining, thereby voiding the 25-year warranty and possibly damaging the liner. So your other option is to dig it up. The sewer laterals are the sewer laterals were the responsibility of the individual property owner to maintain as needed. Now, if they run an auger down it, they can severely affect the functioning of that lateral, and the city is going to have to repair that lateral. This product that you are putting in is not meant to be a replacement for a perfectly functioning pipe. It is meant to extend the service life of a malfunctioning deteriorating system a little bit longer. That's it. Thank you, sir. Martha Welch. Mark Bros. I've been in the meeting for three years. I never saw you vote for two minutes and and the committee. You didn't do that. There's a lawsuit about this also, I think, because um you didn't vote for that. Now, where we have all these pumps, um, where that where they go? Because um we don't have a sewer plant at all. Online, no, we don't have one. Point lonely is water. So where does it go? Where do you pump to? I don't know. You know what you do? Dry sewer. That's what you do. Now, where are these pumps go? I don't know. Now, potholes and cracks. Now, on um uh downtown where I live. Now, on 11th and 10th and market and Broadway all cracked up. They're all cracked up, big cracks all over there.