0:12Start the recording because it started and then it's okay.
0:16I just actually I just pressed play on the recording.
0:20So it it is recording now.
0:27This is the December 16th meeting of the Stanford Planning Board.
0:32Um first item have on agenda are the minutes from our last two meetings.
0:43Uh first we have the minutes from November 18th, uh 2025, uh, which we reviewed at the September at the December 2nd meeting, but did not have forum to approve.
0:54Um no, there were some additional corrections as well.
0:58Um so present at that meeting.
1:01Uh are myself, uh Ravi, um Bill and Chet.
1:14So can I put forward another motion to approve the minutes?
1:22Uh motion approval second.
1:33And three of us approve the minutes uh of November 18th.
1:39Uh next on our agenda are the minutes from uh Tuesday, December uh present at that meeting where Jeremy are there any uh hey Jennifer audio is making up quite quite a lot.
2:06Um why don't we um I'll I'll take the motion for this and then I'll switch to phone audio.
2:17I hope that I have to abstain because I was not present.
2:22So um I chet and Jeremy can vote on the minutes.
2:26Um do I have a motion for approval of the minutes, motion second for all in favor?
2:34Um the passes from the three of us.
3:17Um the the board just approved the first two uh agenda items, which is of the minutes.
3:27Jennifer is very frozen, so she should be joining audio soon.
3:46Well, we're I thought there were only two items total.
3:52Uh the the minutes, the the meeting minutes.
3:59So we haven't discussed the schools yet.
4:26Is there can we move on or are we we are we having more dip technical difficulties?
4:33I think uh Jennifer is supposed to have to switch to the phone.
4:38Uh that's what I thought was happening.
4:42So I'm I'm but she's on mute on the screen, so I don't know.
4:48I can't hear you, Robbie.
4:50She's um she's looking up the phone number on the agenda, likely calling it.
4:57Will you can hear the others?
5:04Um we do also have the team here for the Roxbury item.
5:10They're all in the attendees.
5:11I just wanted to make you where they should they should be promoted.
5:15That would be uh Dave Cravenzola, Kelly Nelly, Mary Lynn, uh Randall, uh Randall Luther.
5:22Um, and we have Craig DeJong from the West Hill team.
5:25All right, you all you got it.
5:38All right, how is my audio now?
5:46Um, we can go ahead and proceed with the presentations, and I will just note for the planning board that um it is our duty um in listening to these presentations to also reform their alignment with the um the comprehensive plan.
6:09Um so if our presenters can go ahead and just introduce themselves for the record.
6:14Um, we'll be glad to hear about all these exciting projects.
6:20Um so I'll just kick off and say I'm Catherine Mobaldo, uh director of school construction for the city of Stanford.
6:27Um this evening, we have a couple of procedural uh votes for uh for this board.
6:33Um the first item will be Roxbury Elementary School.
6:37Uh Roxbury Elementary School is going for its uh bid authorization meeting with the state of Connecticut, and in doing so is seeking a uh affirmative letter from this planning board.
6:50Uh and we'll have presenters Kelly Nelly from Arcadis, uh Randall Luther from TSKP Studio, um, and Mary Lynn Redick from ITF Studio, and we have David Carbenzola from ONG construction.
7:11Good evening, everybody.
7:18Now, Catherine, I think I missed like the first 10 seconds of what you were saying when I was switching to my.
7:23Oh, do you want to share?
7:24Do you want to share your screen?
7:28Let's not keep these folks waiting any longer than they have.
7:33Um, can you all hear me?
7:37It says disabled share.
7:39So you should I just enabled it, so you should be able to share now.
7:43All right, let's try again.
7:46All right, sharing screen two.
7:50All right, let me know when you can all see a presentation that says the city of Stanford Roxbury K through eight school.
8:01Thanks for having our team here tonight.
8:03We look forward to um working with all of you.
8:06As Catherine mentioned, we're here for two things um for your support and approval for the new Roxbury K through eight school, and then also for um approval to move forward with demolition of three structures on the existing K through eight Roxbury School.
8:22Um, so moving forward through here, um, a quick overview of the project.
8:26We are building a new K through eight school on the existing Roxbury K through five school.
8:33So the new building is going to be bringing in grades six through eight.
8:36So we're gonna have a larger, larger school going from you know a little over 500 students, 850 students, as you see.
8:44Um, I think I'm on the second slide if you can see that.
8:47We have a very tight site.
8:49So our new proposed building is going to go back there on the um right side of the site where the only open area we have.
8:58Um, but in doing so, we're going to have to um make some adjustments to the existing building.
9:05Can you guys see my cursor moving?
9:09That chance great, thank you.
9:10So I'm circling an area of portables here and then up here.
9:15Those are two sections of portables that are gonna have to be demolished.
9:19We also have this little square here.
9:23It's four classrooms.
9:24It's an addition that was put on after the the existing school is built.
9:30The lower level is a garage, and the upper level is for classrooms.
9:34So we're gonna also demo demo those for classrooms as well.
9:38Because as you see these notes here, this is a very large slope that goes down to this field.
9:44Um, so being able to have access around the building during construction is going to be important.
9:48So demo demolishing that will enable us to have the new school on our existing site.
9:55Um, we have two phases of construction.
10:00Phase one is going to be our geothermal wells down here where you'll see this play area and this open space.
10:04We're also going to be doing some ground improvements right here with the building pad is going.
10:09And then some additional things, site fencing, the demolition, and some new parking over here where you'll see it says play.
10:18It's a uh existing basketball course.
10:20So we're going to be moving basically this parking lot up here.
10:24Um on my next slide, we are zooming into the new proposed site layout.
10:31So key considerations as you saw, or one quick one quick overview here.
10:37The existing school has two entrances.
10:40The buses come here, students come from the into the front of the building, and you have parking and car drop-off in the back.
10:48So we're kind of maintaining that same thing on the new on the new um the new layout for the new building.
10:54It's probably going to be even more so used down here because this is just going to be either car or bus.
11:01Um and then same thing with the upper lot, car or bus.
11:04So you have two main entrances.
11:12All of the main things like media center and cafeteria on that floor for them.
11:17So you don't have to move through the building.
11:19Um and then their play area is also down here.
11:22Um, so they kind of can just stay on that that main floor.
11:27Um, another great item we have is a is a very large um middle school soccer field with additional play area and a basketball court.
11:37Um a very important thing to know is we are very much increasing our parking.
11:43We have about 45 to and 35 in the existing layout at the existing uh Roxbury School, but we're gonna have over 160 parking spaces at this new school.
11:56Um, and as far as the car queuing and bus queuing, I will say that you know, TSKP and their consultants have done a great job to really maximize these bus loops and car loops.
12:07So um the upper loop can have up to 24 buses or 45 cars, so it's really flexible.
12:12They can the school can choose which path they want to go or change it however they please.
12:18And then the lower parking or not parking, the lower loop has either 22 buses or 34 cars can queue at a time.
12:28This loop will be gated off though after school drop off.
12:32So when the kids do come out to play at the playgrounds um and the play areas, there's no car traffic coming in here, and then it'll be open back up for um when it's time to depart.
12:45Um that is really it for our presentation today.
12:48If anybody has any questions, please feel free.
12:51Myself, O and G T S KP are here to answer any questions you may have.
12:59How long how long is this construction going to going to take?
13:05So we are going to be starting phase one construction in July when school gets out.
13:10That is going to be as mentioned, the demolition and uh geothermal.
13:15And then we move into the main construction in November of 2026, and we are complete in 2028.
13:21So the kids will move into their new school August of 2028.
13:25So roughly we're estimating about 22 months, David, off the top of my head, 23 months.
13:30Our main construction is 18-month construction, but we've added phase one to demo demo the part of the building and then add the geothermal well.
13:39So there's a and then Kelly, following that is the phase of demolition of the existing Roxbury School, and then completion of the rest of the site amenities that continues for approximately 10 10 months after the occupancy before the start of the 28-29 school year.
14:03Uh, Chester, I think you were had your hand up first.
14:06Um, thank you, Kelly.
14:07Just to adjust to one question regarding the loop in the back.
14:13Umce there's not a whole lot of green space back there.
14:18Um was any consideration given to making that um a more per uh permeable paved surface?
14:26Um, you know, the at least the loop that the cars are gonna go on.
14:32Um, I can have Rangel jump in here if that was ever a consideration.
14:36Um, but as of right now, you know, this secured play area in the loop is you know, uh it's not mulch, but it's that it's a play surface material, and then you have uh basically a paved area right here where the kids can have like hopscotch and four square and things like that.
14:53So, Randall, I don't know if there was anything you wanted to add.
15:00Uh no, you're well, so Kelly's correct, and that the play surface itself is rubberized and it is porous and it is permeable, so that portion of it is will you know serve to recharge some of the groundwater?
15:11Uh, as far as the pavement itself, um, there were some early discussions.
15:16Uh the the building will be uh lead uh silver, and as we were looking at stormwater options, and there was some discussion about permeable paving.
15:26Um, but it was felt to be one more expensive and two higher maintenance, and so it was not pursued.
15:34Thank you very much for that answer.
15:40Um yeah, I was just wondering uh the footprint of the new building looks like it's much smaller than the old.
15:47Is that because it's three stories?
15:54And and that's one of the there's one of the few benefits to having uh very little area to work with while the existing building's in operation, it's forced us to make a building that's very compact, uh very efficient.
16:09Um and in fact, the the grade as well has worked to our advantage in that we're able to enter into the middle of a three-story building, so that typically nobody really has more than one story to traverse, other than the oldest kids if they're going from the top level.
16:23They may have to go down to the lowest level, but the younger kids either traverse no floors or one floor.
16:30And why do we need three times as much parking?
16:37Well, there I mean, there are there are two reasons.
16:41One that the existing parking is inadequate.
16:44Um, and then second, the school enrollment is increasing um significantly.
16:49And so the combination of those two factors has has led to the increase in parking.
17:04Uh no, just one quick question.
17:06The soccer field is it uh artificial turf or is it natural long natural regardless?
17:26Um, one last question, if I may.
17:28Was any consideration given um to orienting the new soccer field 90 degrees?
17:35So that it is um, you know, when there's uh a ball that overshoots the foul line, it's not heading into the driveway and parking.
17:48I mean, so the field itself is all flat, um, with you know, just very subtle pitch for drainage.
17:56Uh and you could in fact turn that field in either direction.
17:59It's just graphically how we chose to illustrate it.
18:02But that that's a we've had that very same conversation in the office, like should we show it this way or show it that way?
18:07Um so you you could in fact turn it 90 degrees depending on how they want to lay it out, or depending on what sport they're using it for.
18:13It doesn't have to be for soccer.
18:15It could be for for any number of um uses.
18:19In this orientation, you have easy access to the basketball court too from the sidewalk.
18:24If the the soccer field was over here uh next to the drive, then you'd have to go over here to the basketball court because the slope is very steep right here.
18:33So fitting it over here would have been difficult.
18:36Uh so that was my question.
18:38Um so it could uh it could not turn 90 degrees and and kind of occupy the the uh the space closer to the intersection of Roxbury and West Hill.
18:48No, no, it it could.
18:50Um and in fact, you know, everything's still a little fluid.
18:54We're we're just completing design development.
18:57And we we've to facilitate that, we've actually are looking at right now at moving that basketball court a little closer to the drive because it is there is some fencing there, uh and that would free up more space to give you the flexibility to do just what you're talking about to turn it 90 degrees or or to stripe any other kind of activity you might want to put up there.
19:20So you'll make that assessment in design development, I assume.
19:23Yes, as we move forward.
19:31Are there any further questions from the board?
19:38Um, Lindsay, procedurally, should we just kind of do all the motions at the end or should we do it per item?
19:45I would do it per per item because we'll we'll be having different um there will be a separate letter for each from the planning board.
20:00So as pertain to cut.
20:08Um as pertains to this presentation on Rock Aerry.
20:14Um again, our charge of the planning board is to review and determine its compatibility with the comprehensive plan and the capital plan.
20:24Uh do have a motion on this item.
20:37Uh a second on that motion.
20:48I second okay, second and bill.
20:54Um all in favor of um affirming the alignment of this project, please shut your hand.
21:02Uh Jeremy, do we have you?
21:04Uh yeah, Jennifer, I'm going to abstain from this one.
21:09Okay, so four and approval and one abstention.
21:15Uh now on to our next presentation.
21:19Um before we move on, could I ask that we take item one and I apologize item three, which is the demolition.
21:28Uh the it's a according to the charter, section 9-10.
21:34Uh the mayor must refer the demolition of existing assets to the planning board.
21:39Um, so we didn't have a separate presentation for that.
21:42We're hoping we could we could take both.
21:45That would be all right.
21:48So we'll just say procedurally that that was the motion for item one for uh and for the project itself, and then we'll have uh we'll take a motion for the demolition.
22:03Uh chat move uh approval for affirmation of the demolition in alignment with the capital plan, the comprehensive plan for the second, second from bill, all in favor um for an approval and generally an abstention.
22:26Uh so next uh the presentation on West Hill Demolition.
22:34Uh wonderful chair, uh, have Adam Levitis here from Collier's Project Leaders and Craigant from Slam Architects.
22:40Adam's going to be uh sharing the screen as we go through the construction logistics, uh, which describe the demolition on the West Hill High School's campus, uh, which is the item we are here for uh seeking your uh approval for this evening.
22:56Um starting in April, and I apologize if some of you have seen this before, but um we'll we'll try and zip through.
23:04Um in April, um uh we are anticipating uh doing your construction to mobilize on the West Hill High School campus.
23:12They are going to demolish uh the blue square in the lower left-hand corner.
23:17Uh we often refer to that as the old VoAG.
23:21Uh Principal Ronaldi remembers it as the old Voag.
23:25It is currently um a bit of an abandoned kind of um storage uh maintenance uh area.
23:33Um it is it is not the Voag building.
23:36We will not be demolishing the Voag or what is known as the AgriSigns building, just to be clear.
23:42Um on the right hand side is the construction which are we're doing to bring utilities in, but that that is not any that's just necessary construction.
23:53Um after graduation next year, uh we will start selective demolition of the uh auxiliary gymnasium to make way for our room uh on the site as we continue to at this point.
24:07We will fence uh the full perimeter around the site.
24:12Um this will be our condition for the next three years.
24:19You can see it there June 2026.
24:21So graduation will occur uh in the stadium as planned in 2026, and then the campus will or the majority of the campus will be uh fenced off for construction activities, and we will uh start demolition, selected demolition with the uh the auxiliary gymnasium.
24:42Um we will also be making modifications.
24:45You see the other circle there to the loading dock area.
24:48Um the current loading dock area is where you see a little bit of a purple circulation line.
24:54Um that will become emergency egress.
24:57Um we will have to relocate the loading dock so services can come in and out.
25:02And off to the right-hand side, you can see the work that we're already starting.
25:05We've been completed the hall road connection.
25:07That will be bring our truck traffic in and out of the site.
25:12So we will not be bringing um trucks carrying their deliveries through the site.
25:17Uh we will allow the campus a bit of the a front of house, so to speak, uh, to try and maintain its everyday activities.
25:25The front field uh will remain open uh as will the majority of West Hill High School minus the uh the gym, which will be demolished in the summer of 2026.
25:38Uh next um these are our our construction as we continue through construction of the new building.
25:47Um we'll go at this point we'll have new bus.
25:53We're we're preparing for busing, we're preparing for staff parking.
26:00And then when we transfer students to uh the new school first day of school 2029, um we will create temporary parking for staff.
26:10We will have our busing located and we will start the demolition of the of the existing uh West Hill High School, the majority of the existing West Hill High School.
26:21I think we maybe have one final slide kind of showing the finished condition.
26:24I'm not sure which deck we're in.
26:28Once the a little bit more here, once we demolish, we need to demolish obviously to create the the new staff and student parking lot and uh finish out the matatorium or pool, as we would call it, the pool and the tennis courts, which you can see in the rendering.
26:50So Catherine, at what point um if you could go back to those phase diagrams uh for a moment, um one right before this, I think.
27:02Um so at what point do the does the field um get continued for use uh only after the new school is is uh completed or sometime before that the fields that are the baseball and softball fields will open in 2029.
27:28Okay, so with with the completion of the of the new school.
27:34So um during, but they're not but they're not necessarily needed for construction, isn't it?
27:39Is that true the case, or at least certainly not the uh the football field?
27:45Um actually the the stadium, the football field on the left-hand side of the screen, and the baseball fields uh will be housing our geothermal wells.
27:56Uh there'll be 240 approximately geothermal wells on the site, uh, which will be uh providing uh energy to our existing building.
28:06So we will we will need um to regrade that area um and we're actually reorienting location of those fields.
28:15If you see the site today, that's not where those fields are today.
28:19Okay, so we're actually relocating the stadium then.
28:23Well, the stadium is stays where it is, but the baseball field and the softball field are actually moving a little bit.
28:31Uh well then forgive me if I'm getting a little confused.
28:34So where your cursor is right now.
28:37Um that's currently an existing um field of some kind.
28:44Football field, yes.
28:46Um and in the final analysis, we'll um I think you're saying you're you're placing the geothermal wells there.
28:56Um at what point do the uh or when in the calendar do the thermal wells get drilled and and the that area get uh regraded?
29:06We are doing the uh geothermal wells first on the site.
29:13Um and then there'll be some grading.
29:16Um but we will also be needing that area because the site is so tight for our bus and our temporary parking before we can return it to yeah, it's it's two very large high schools coexisting unfortunately.
29:35We've really packed this site.
29:36I mean, max absolute maximum capacity.
29:39Okay, you've answered my question.
29:41Thank you very much.
30:01Are you trying to hear no further question?
30:11And then the specific item that's before us is the authorization of the demolition.
30:18I have a motion on affirmation of the demolition of West Hills.
30:29I'll make a motion to approve.
30:34And Chet is seconding the motion.
30:37So all in favor of approval for the demolition of West Hill.
30:44And this passes unanimously.
30:47Thank you very much.
30:50And thank you for your persistence in making this meeting happen this evening.
30:55Yes, very important to keeping us all on schedule, and we really appreciate it.
31:07So those were our core items on the agenda.
31:10I do want to note as a I guess an item of business in relation to the um to the capital plan that we did just receive the recommendation for the safe debt limit.
31:26And it is a $35 million in general obligation bonds, of which 10 million are to be earmarked for a Board of Education projects above and beyond these projects that we have heard tonight about the school construction.
31:43And so the slate of various renovations and upgrades and improvements for Board of Education buildings is what that $10 million yearmark is out of the requests that have come before us.
32:00Yeah, so I I have a question about that.
32:08Subdividing the net limit uh level into both city and uh board of education, did we?
32:18We we did not have that specific recommendation from uh uh from the city or the board of finance.
32:27So that is uh the new um bifurcation uh between the two.
32:34Okay, and and is it is it a recommendation?
32:37Is it a requirement?
32:38I mean, we can we if it's a recommendation, then we can choose to accept it or or not, or how does it work?
32:48Um my understanding is that it would be binding.
32:53Um however, that would be a question uh for uh Ben Barnes to confirm.
33:00Okay, because I I would like the opportunity since that's it it's quite a uh a bit uh more than what has preliminarily been allocated to the board of education thus far in our in our uh discussions.
33:16Um I'd like to have the opportunity to reconsider that and and not do such drastic cutting um back to the city side of the capital budget.
33:31Um we can certainly send that question along.
33:34Um I mean I I understand the reservations, and I also acknowledge that I my I think one reason for the earmark is that um you know we've we've been talking in general about wanting to honor the long-term facilities planning that's been happening both on the board of education side as well as across many city facilities.
33:55Um and so my best uh guess would be that the um recommendation for the 10 million dollar year mark is in order to move uh more of the long-term facilities backlog uh forward more quickly.
34:09Um I while I don't know what the recommended timelines were offhand for all of these various projects in the long-term facilities plan.
34:19Um it's all my understanding is already a few years behind what was recommended when um all of these projects were put forward.
34:27So again, we can um we can go ahead and ask for clarification on the bifurcation between the Board of Education uh element and the um and the rest of the general obligation bonds for city projects.
34:44Um I will note another precedent um from a few years ago was when uh the city was setting aside funds for uh the replacement of the police headquarters.
35:00So during that period, also there was a there was a chunk that was just set aside for the multi-year construction, and during that time, the general obligation bonds that were available for other city projects, you know, inclusive of Board of Education and across the city departments was shrunk down as well.
35:17So that sort of earmarking is not without precedent, but we'll definitely confer to see uh what the guardrails are around that.
35:29Um and I'll just note then for the um uh for the board also just as a point of comparison, um, that last year we were working with a overall general obligation uh limit of uh 40 million dollars.
35:44And so um the overall um general obligation limit that we're working with in this year is 35 million, again, inclusive of the 10 for Board of Education projects and the um 25 for other city projects.
35:59Um I don't know um all of the uh background considerations on this and you know, knowing how many school construction projects are proceeding over the next few years, again with a very high reimbursement rate, much higher than we've seen in prior years.
36:15I imagine that is having some impact upon uh what can be issued as general obligation bonds.
36:22Understand that, uh, but but at the same time, the uh the the amount that between uh West Hill, Roxbury, and um and the and the new South End school that's currently in planning.
36:35Um the the amount that still has to be funded by the city is still in excess of 100 million dollars.
36:44So um which the city is already that's that's a portion of debt limit that the city is already allocating to the board of education.
36:53So all deeply understood.
37:00Um I'll I guess the last thing I'll just note um in terms of context is that um the portion of the of that last year, the portion of the 40 million dollars of general obligation bonds that went to the board of education was actually significantly smaller than it typically has been in uh years prior.
37:18Um a lot of that was just driven by the fact that there were fewer requests that came in uh last year, whereas this year um we've been put forward with a significant slate.
37:28Um certainly many of them uh there's an expectation that only some of them will be approved, but that we'll kind of chart out the rest into the out years.
37:37Um that one also keep that in mind as well.
37:43Um so uh again, we'll we'll um send the question about uh uh whether the um division of the general obligation bond is um is a recommendation or if it is binding.
37:58Um and they'll also confer in terms of process between now and the January 7th uh public hearing uh whether we ought to um hold off on any um amendments or if it makes sense to make some amendments ahead of that uh hearing to bring uh the recommended budget closer in line with um what is called for in the safe debt limit letter.
38:25Um any other uh questions on this item from other board members.
38:35All right, um hearing none I'll not record that this is our final meeting of 2025.
38:45Um, actually, no, we have a special meeting on Monday for one item.
38:50Uh but this is our last regular meeting, Jeremy.
38:53We have there's a ZBA application that's on the agenda.
38:59Uh that was actually taken off the agenda.
39:02Yeah, it didn't need to be referred to the planning board.
39:06Okay, yeah, no, I just saw it still on the on online and in our packet.
39:11So just want to make sure we're not missing anything.
39:15Yeah, the one in our packet is um is has been revised since.
39:19And so we got an email from Leslie, uh, I think at the end of last week with the with that revision.
39:28Um, our next regularly scheduled planning board meetings um aside from the special meeting, which has been called uh for uh Monday.
39:41Um will be the public hearing for the capital budget on January 13th, uh the a regular meeting on January 27th and a regular meeting on February 10th.
40:00Uh so in that regard, um don't doesn't the board need to um basically take some uh make a final review of of what uh of the capital planning budget before the public meeting on the 13th.
40:18We do not need to have another official review as I understand it, because what needs to be affirmed by the planning board is the final transmission, which occurs after the public hearing.
40:30So we reviewed the um the budget proposal all together um at our December 2nd meeting.
40:39Um but in terms of like official action, there um we didn't have to like affirm it to put it before a public hearing.
40:51Okay, but I thought we were still uh uh uh awaiting additional input uh in terms of prioritization from the other um planning board members who were just hearing it for the first time on December 2nd.
41:07Um understanding is that the so I know that um that Tony Um OPM has forwarded the questions that were listed in the um with within the capital budget spreadsheet to the respective departments and that we have received responses on some of those.
41:29Um that you know I think our next um step for more formal deliberation across all of board members would be after the uh public hearing.
41:41Um we typically are submitting uh the a letter um for a recommended capital budget to the mayor by early February.
41:51Um and certainly between now and then any of the board members are welcome to take a look at uh what's been proposed so far and to uh suggest any modifications or ask additional questions.
42:03Okay, so on the meeting of January 13th, we're uh we're not expected to take any uh action, are we?
42:11Um well we're for the public hearing, we're to hear the comments.
42:19Other than to hear them, that's our only formal or action.
42:24That is the formal action, and then we take that into the following meeting.
42:29I mean, I I will say that like if at the end of the public hearing we determined that no edits needed to be made, we could go ahead and affirm the budget, but that seems unlikely.
42:48Um well and thank you very much to all of you.
42:51Um happy holidays and happy year.