4:06Chair Johnson and Commissioners Bowie and Kim are excused.
4:16Minutes twenty-five dash fifty.
4:18Approval of the November twenty twenty-five HRA meeting minutes.
4:23I will uh take a motion from Council President Naker to approve the meeting minutes.
4:28Is there any discussion?
4:31All right, no discussion.
4:32All those in favor say aye.
4:39The minutes are approved.
4:42Item number one for discussion.
4:45Resolution twenty-five dash nineteen oh eight.
4:48Resolution authorizing short-term extensions to parking operation and management agreements.
4:53Collectively, ramp agreements at one Robert Street Municipal Ramp at Ninety Five East Seventh Street.
5:01Two, Lower Town Municipal Ramp at 316 Jackson Street.
5:06Three, Lawson Municipal Ramp at 10 West 6th Street.
5:1047A Ramp at 13 West Exchange Street.
5:14Five, Block 19 Ramp at 145 East 7th Street.
5:19And six WTC Ramp at 477 Cedar Street, all in District 17, Ward 2.
5:27And I'll turn it over to Director McMahon for an explanation about this item.
5:32Chair Commissioners, this item authorizes the HRA to extend current contracts with our parking ramp management companies for one year.
5:38We are in the process of releasing an RFP for parking ramp operators next year.
5:42And the timing is such just that we need to extend our current contracts until that RFP is completed.
5:46Thank you, Director Mupin, for that.
5:48Any questions from my colleagues?
5:51All right, I'll take a motion from Council President Naker to approve this item.
5:55I guess any discussion.
5:58All right, all those in favor say aye.
6:01Four in favor, none opposed.
6:03The resolution is adopted.
6:08Item number three, resolution public hearing 25-280.
6:15Resolution approving and authorizing the sale and conveyance of a vacant lot at 77 Congress Street East to Iglesia Niclizo Church in West Side, District 3, Ward 2.
6:28All right, this item was presented to us previously, and this is the public hearing for that item.
6:34So if you are here to speak on item number three, this is a public hearing, and you can come forward and you'll have two minutes.
6:41So this is a public hearing.
6:42Is there anyone here to speak to this item?
6:47Seeing no one, I'll take a motion from Councilmember Coleman to close the public hearing and approve this item.
6:53All of those in favor say aye.
6:59Four in favor, none opposed.
7:01The public hearing is closed, and the resolution is adopted.
7:06Item number four, resolution public hearing 25-278.
7:12Resolution approving and authorizing the conveyance of three parcels located in Chestnut Plaza and along the riverfront to the city of St.
7:21Paul, District 9, Ward 2.
7:24All right, again, this is another public hearing item for number four.
7:28So if you're here to speak to this item, this is your public hearing, and please come up.
7:35Seeing no one, I'll take a motion from uh council member Yang to close the public hearing and approve this item.
7:41All in favor say aye.
7:45Four in favor, none opposed.
7:47The public hearing is closed, and the resolution is adopted.
7:52Item number five, SR25-268.
7:57Introduction to Ames Lake Property, RWMWD flood mitigation project.
8:03And I'll turn it over to Director McMahon for a presentation on this item.
8:07Hi, thank you, and welcome for that.
8:08This is introduction link to the Ames Lake Property Flood Mitigation Project.
8:12You can see here this HRA owned property is in Ward 6.
8:16We've owned and maintained this property for nearly 30 years.
8:19And we originally acquired it to achieve components of the Phaheline Village Small Area Plan that was adopted by the St.
8:24Paul City Council in 1995.
8:27And so it's over two acres and it is prone to flooding.
8:30You can see the um in teal is the property specifically we're talking about.
8:36So here again you can see the parcel in red there.
8:38So the Phahelan Village Small Area Plan shows it as the one that was adopted in the 90s.
8:42It shows it as open space surrounded by residential uses to the south.
8:46And the goal for the land was to restore Ames Lake and also to preserve wetlands and create wetlands in low areas, such as the parcel in question here, since they were unsuitable for development due to it being low-lying and prone for flooding.
9:00Again, here you can see separated by Magnolia.
9:03So sort of that northern and the southern part for Ames Lake here.
9:06There is identified a total of over eight Lakers for wetland mitigation, divided again by Magnolia.
9:14So North of Magnolia did successfully result in the restoration of Ames Lake.
9:18The watershed was heavily involved in that project, and so they have familiarity with the history of the area, the adopted plans for the area, and the environmental needs of the area.
9:29You can see here the watershed proposal came forward.
9:32The watershed completed the Ames Lake flood control feasibility study just a few years ago in 2023.
9:38And as mentioned, again, the area being low-lying is prone to flooding, and even more so due to lack of stormwater management on that HRA parcel that's south of Magnolia.
9:48The watershed is proposing proposing improvements to three different parcels.
9:53You can see them there, the West Ames Lake Berm, the main basin options, and then the South Basin options.
10:00Storm Mother and other mitigation or what's being proposed in order to better prevent flooding to the adjacent properties.
10:06You can see here, as part of the proposal for that West Basin, that they are proposing to do a new berm there to restore it with the prairie vegetation to replace trees as needed and have the back flow preventer as an outlet pipe from that townhouse pond.
10:23You can see adjacent there on Ames Lake.
10:28Within the main basin, this is for that parcel south of Magnolia that you saw on the earlier slides.
10:33The watershed's proposing significant investment to improve water management and stormwater management on that parcel.
10:39And you can see listed some of the specifics of the technical things that they would be doing there.
10:45So as the watershed continues or technical work to refine what would be needed on that parcel, you can see a few different options emerging here.
10:52Both are really similar and provide the same benefits to the surrounding neighborhood and to that land immediately adjacent to the HRA parcel.
11:00You can see here some more details of the options that the watershed is exploring.
11:04I really just wanted to note here that the public amenities, and I'll actually go back a slide to show some of those.
11:09I think the visuals may be a little easier than the list form to see the public amenities for the surrounding neighborhood.
11:14And to me, it's a really great example of forward thinking work that we're doing on sustainability.
11:20That's exciting to see.
11:21So instead of just going in and having a stormwater pond or something that oftentimes just sort of sits there, isn't really usable, ends up being vacant space for the community.
11:29What happens is you have all those technical improvements.
11:32You have the stormwater management, you have the flood mitigation, but you're doing it in a way that's an amenity for the community.
11:38You can see here the potential of having a path that goes around some benches for seating, trees there for shade, a space that people can really go and you know explore.
11:47If you've got some green space there for playing, kids can run around, that sort of thing, as opposed to again what it is now, which is just prone to flooding, low-lying areas.
11:54That's essentially unusable.
11:56So that design, again, there's some more of the details will continue to be refined as that technical work continues from the watershed.
12:03On the south basin here, you can see additional stormwater management improved um improvements that are proposed with again native vegetation restoration.
12:13So, while the proposal for improvements to HR land, HRA land is always great to see.
12:17I think this slide is especially exciting because it shows that this work will be entirely funded by the watershed.
12:24And I think that's something that is a wonderful partnership we have.
12:27I'm really thankful to the watershed for that partnership and for the work that they're proposing on this land.
12:32They're doing a great job of applying for grants and finding additional non-HRA, non-city resources to help fund this and really important work for the community and for sustainability goals.
12:44You can see here some of the timelines and some of the results.
12:48Again, noting that the improvements for the property go beyond just taking care of the flooding and that risk mitigation on the property itself.
12:55But there's some really real and direct benefits for the adjacent properties, either by reducing or removing entirely some of those properties from the floodplain and from the flood risk.
13:05So next week, what will be before you is this action and the HRA action requested is a resolution of support for this partnership and for moving this uh work forward.
13:14And that would then give the watershed the ability as they apply for grants to be able to, you know, attach the resolution and show yep, we're working in partnership, we're all in support for moving this forward.
13:22And then in the future, eventually would be back before you with a request to then convey the land to the city.
13:28So the watershed would come in, they would entirely fund all of the improvements and do the work.
13:32And that parcel just north, the actual Ames Lake Restoration, north of Magnolia.
13:37The intent has always been for that to be owned by the city, and the same would be true of this parcel south of Magnolia as well, then to the city, and would be operated by parks.
13:47Are there any questions on this?
13:53Thank you, Chair Joel.
13:54So I don't have questions, but I want to say thank you, Director McMahon, to you and their staff for meeting with me beforehand, getting me familiar with the proposal here.
14:03I am very pleased with the proposal and also very supportive of it.
14:08In my time on the council here, I've been asked by a few developers about whether they can buy this property and develop on it and what would we want to see developed, but it is very challenging with the flooding that happens.
14:18And um, and so this is a really great proposal that uh provides a public amenity for our community members.
14:24And one of the asks that I did share with our staff is really to um make sure that when we are ready to have conversations and do engagement about what sort of features you would want, like for example, if we're gonna have a bench, where would we have it?
14:37Like that would be engagement that I want to see happen so that um the community members can utilize the um just those uh that money the way that they would like to, and to also be really clear that this isn't going to be a space where we're gonna see um a playground, for example, or just you know, full-blown uh transformation, and to just be really um clear about uh what we uh what is actually possible here, and that that's something that they are uh very committed to and also bringing the watershed district on on board for hopefully to do the engagement as well.
15:06So I appreciate you all in uh the communication you've been doing with the watershed district, and uh and again I'm very supportive of this.
15:15Thank you, Council Yang.
15:16Um, all any other comments from colleagues?
15:19I'll just uh make a comment about this.
15:21Thank you, Director McMahon.
15:22I really appreciate the different options and and again the amenities, the loop trail at the site because I think that anytime we can take you know what is a um of flood mitigation infrastructure, you know, that's maybe not very exciting, but turn it into an amenity and something that the community can enjoy and also learn more about, you know, more education and awareness around what um you know how these how these uh how these ponds work.
15:50I think is is really exciting to me, especially as an engineer.
15:53I just spent some time yesterday at the stormwater feature at Highland Bridge again, uh which has won many awards, and so I'm just really uh appreciative of all of uh all of our staff's work on this project and um look forward to the next steps next week.
16:17Item number six staff report 25-269 introduction to Grand and Victoria Redevelopment TIFF district.
16:26All right, I'll welcome up uh Jenny Wolf to give a presentation on this item.
16:52Uh good afternoon, Vice Chair Joe's uh commissioners.
16:56Uh, Jenny Wolf with PED, and I will be presenting an introduction to the proposed Grand and Victoria TIF District financing request.
17:05Uh so here's a quick project overview.
17:08This is an ill illustrative rendering of the project, which includes one six-story mixed-use building with 90 rental apartments, 12,800 square feet of commercial space, and additionally, the project includes structured parking with 22 public parking spaces to benefit the commercial space.
17:28By way of comparison, here is the are the current conditions for the two properties to be redeveloped.
17:34857 grand and 841 Grand Avenue.
17:39This is a map of the proposed TIFF district and project area, which includes the two properties to be redeveloped.
17:49The developer and owner of the property is 845 Grand LLC, and Ari Peritts is the managing member.
17:57Ari is the president and founder of Afton Park Development and has 10 years of development experience.
18:04Ari partnered with Reuter Walton to develop the Kenton House project just east of this development site on Grand and St.
18:14The developer applied to the HRA requesting tax increment financing, otherwise known as TIFF, to advance the redevelopment.
18:23An initial step in this process is to ensure that the statutory requirements to create a redevelopment TIFF district can be met.
18:31The HRA retain the services of LHB, a professional engineering firm with decades of experience to complete an assessment of the property to ensure that the statutory blight test is met.
18:43LHB confirmed the property meets the requirements with three substandard buildings exhibiting significant code deficiencies.
18:54A redevelopment plan was prepared by the HRA outlining the goals and objectives to advance the proposed creation of the TIFF district, including the removal of lighting conditions, increasing the housing supply, and creating jobs for local residents, to name a few.
19:13Additionally, the development objectives outlined in the redevelopment plan include public realm, energy efficiency and stormwater, transportation and parking, housing, and employment.
19:24The proposed project to be constructed in the TIFF district is consistent with the development objectives.
19:32On November 14th, the St.
19:34Paul Planning Commission reviewed the HRA's proposed redevelopment plan and determined the redevelopment plan is consistent with the 2040 comprehensive plan, including multiple land use policies as well as the development of new housing in our city.
19:52Now I want to step back a bit here and cover broader TIFF topics.
20:00TIFF is a locally approved financing tool authorized under state law.
20:03The state law enables redevelopment authorities and municipalities across the state to capture increased local property taxes to advance development in their community that would not otherwise occur but for the assistance.
20:17The creation of a TIFF district captures the increased value from the redevelopment and the value that was in place prior to the TIFF district is frozen before it declines further, resulting in a steady tax revenue, as the TIFF Authority then captures the increment.
20:34This illustration here is from the Minnesota Department of Revenue to demonstrate the benefit to the taxing jurisdictions.
20:41The incremental property taxes are used to finance or reimburse eligible costs related to the development, including administrative costs.
20:53The property owners within a TIFF district still pay their property taxes, like any other property owner.
21:00The property taxes are divided as shown here.
21:03The TIFF Authority captures the local taxes from the increased value with the taxes from the value in place prior, still paid to the taxing jurisdictions.
21:14Additional non-local property taxes are not captured in TIFF.
21:18Those include market value based taxes levied by the school district and state commercial taxes.
21:27The proposed TIFF district to be created is a redevelopment TIFF district.
21:32The maximum duration is 26 total years, and this type of TIFF district requires certain conditions in place prior to the proposed redevelopment to meet the statutory requirements.
21:44As mentioned, this includes blighting conditions with substandard buildings.
21:49The tax increments must be used to remedy the conditions that allowed the qualification of the TIFF district.
21:56So removal of those substandard buildings and completion of related site improvements and installation of public improvements.
22:04Additionally, tax increments may be pooled and spent outside the TIFF district boundary but within the project area.
22:12However, qualifying affordable housing expenditures may occur anywhere within the city and are not limited to an associated project area.
22:22A TIFF district is located within a project area.
22:26The TIFF district includes the parcels that will generate the tax increments, and the project area is the area where expenditures must occur.
22:36As outlined in the redevelopment plan, the proposed Grand and Victoria project area is coterminous with the TIFF district.
22:43This will result in the maximum pooling to invest in affordable housing anywhere within the city.
22:52Any proposed TIFF district must meet statutory requirements for its creation.
22:58It must demonstrate that the BUT 4 test has been met, requiring a determination that the proposed project would not happen solely through private means within a reasonable time frame.
23:10It must include TIFF eligible expenditures consistent with the adopted TIFF plan and associated budget, which budget will establish the maximum amount of tax increments to be collected and spent.
24:16A TIFF development agreement is then presented to the HRA board for approval.
24:21It will include the maximum amount of tax increment and specific requirements therefore, including TIFF eligible expenditures of the development are financed on a pay-as-you go basis.
24:34This means the developer pays up front all the costs and is reimbursed over time from the tax increments as they are collected.
24:43The developer bears the risk that they will be repaid for their upfront investment, and the development agreement includes language to evaluate the appropriateness of the financial assistance throughout the term of the agreement, resulting in a potential reduction in the TIFF assistance.
25:03There has been quite a bit of conversations around how we use TIFF in St.
25:09For example, there have been claims that city taxpayers are at risk for TIFF district obligations.
25:15This is not true, especially regarding this current request, which includes the proposed issuance of a pay as you go TIFF note.
25:24The collected and pledged tax increments are the sole revenue pledged to the TIFF district obligation.
25:32Nor is TIFF a gift to a developer.
25:35As previously mentioned, the developer must secure the funds necessary and complete the project, including incurring the TIFF eligible costs, and then be reimbursed over time for their original investment.
25:49The city benefits from the completed development, including the removal of blight and increased housing options for residents.
25:58Now back to the Grand and Victoria Redevelopment TIFF district and TIFF plan.
26:03The TIFF plan and budget utilizes the following assumptions.
26:08The expected taxable value at completion is $26.5 million, and that's compares to the recent 2025 assessed value of around $6.5 million.
26:18This results in over $20 million of increased value.
26:23The first receipt of increment will be delayed until pay 2028, resulting in a final collection year of 2053, which is the maximum 26 total years.
26:34The tax increments collected by the HRA are estimated to total $363,076 annually beginning in tax pay year 2030, with lower amounts in the prior two years while the project is constructed and stabilized.
26:50The total projected tax increments collected in the TIFF district is just over $9 million.
26:58The budget included in the TIFF plan is shown on this slide, with the proposed pay as you go note listed under site improvement prep costs and other qualifying public improvements and interest.
27:10The budget also includes expenditures for HRA administration and the construction of affordable housing of nearly $3 million.
27:20Council President has a question.
27:24Wolf, before we go on, um, I know we're going to get to the analysis that the project requires $2.956 million in gap financing, and that I assume is the number that's written here.
27:39Is that the number that is that why that's this is 2.956?
27:42Okay, we'll get to that.
27:44So maybe when as we get to that, just to explain the difference between the total amount of increment and project costs here compared to what is the gap needed for the project.
27:58Vice Chair Joe's uh Commissioner Naker.
28:00So what is shown on this slide is the um TIFF plan budget, and there's site improvement prep costs of 1,288 and other qualifying public improvements of 1,668, those combined to total 2 million 956.
28:15That is the amount of assistance that we would reimburse, the that's the principal amount, and then the balance of the payments on the pay go note would be under the interest expense.
28:27So it just so happens that the affordable housing is also 2956.
28:31Um, and then is that that construction of affordable housing that's the pooled amount for affordable housing elsewhere in the city because this development is market rate housing.
28:40Um, Vice Chair Joseph Commissioner Naker, this is market rate housing, and the um pledge of tax increments to the developer will be set such that we maximize the amount we can pool.
28:51So the um I and that's on a future slide, but yeah, that's the intent.
28:56And then one last question, Chair.
28:58Um, where do the up on the estimated sources of revenue?
29:01Where do the interest and investment earnings come from?
29:04Um Vice Chair Joseph Commissioner Naker.
29:07So when we collect tax increments, we hold them with the city, and the city invests all of our our funds, and so interest is um generated and those are tax increments, the interest that is collected, generated from the tax increments as they're held with the HRA.
29:24And so that's just a rough estimate.
29:40The HRA board will consider the approval of a TIFF development agreement for the project.
29:45The HRA retained LRS as our municipal advisor to determine the need for the financial assistance proposed through the creation of the new TIFF district.
29:54Ellers is a full service independent financial advisory firm and works with multiple cities across the metro area analyzing requests for TIFF assistance.
30:04Ellers evaluated information provided by the developer, including their estimated cost to complete the development and the expected operating revenues and expenses.
30:13Ellers concluded that the project requires two million, a $2,956,000 TIFF note to attract adequate capital and debt financing to complete the project.
30:25The following slide includes the proposed sources and uses with a total development cost of uh 44,605,000 with sources including the private debt, a TIFF note, developer equity, and a $350,000 deed grant.
30:41That's this table here.
30:45Ellers reviewed Ellers review signifies adherence to the BUT 4 test.
30:52Their recommendations are shown here.
30:54This review is based on current market conditions and concludes the proposed development is not feasible without the TIFF assistance of 2,956,000.
31:11The TIFF development agreement includes the following terms regarding the issuance of a TIFF note for the project.
31:18The maximum principal amount of $2,956,000 to be issued upon completion of the project.
31:26Pledging 85% of tax increments collected in the first year, which is pay 2028, and then stepping down 5% each year to 60% in the sixth year, and then beyond.
31:37It'll stay at the 60%.
31:39The principal amount will be limited to the TIFF eligible costs identified here, including the cost of the public parking spaces.
31:47The proposed TIFF plan will authorize 35% of the tax increments to be expended outside the TIFF district, enabling maximum maximum pooling for affordable housing.
32:00The agreement will include language to allow the HRA to confirm the BUT 4 test, which is commonly known as a look back, and compliance will be triggered, including prevailing wages for construction and living wage ordinance for the project operation, as well as adherence to our city's sustainable building ordinance.
32:19Council President Achars one.
32:22Just looking at the first bullet, Ms.
32:24Wolf, so just to make sure I'm understanding if 85% of the tax increment is pledged for the first year.
32:28That means that the city will realize 15% of the new tax increment in the first year and an additional 5% every year going forward.
32:38And then 40% of the new increment will be coming in distributed amongst all the jurisdictions starting in the sixth year and beyond.
32:46Oh uh Vice Chair Joseph Commissioner Naker.
32:50No, the the HRA will collect 100%.
32:54And what's shown here is the amount that's pledged to the TIFF note.
32:58And then that means the HRA retains the balance.
33:02And that's what we use for the pooling for affordable housing and for our admin.
33:15Um the city council and the HRA board will consider resolutions in one week on December 17th to authorize the following.
33:24Approval of the redevelopment plan and uh redevelopment project area and redevelopment plan, establishment of the redevelopment TIFF district, and TIFF plan.
33:34A public hearing will be held prior to approval of either resolution.
33:39The HRA board resolution will include authorization for execution of a TIFF development agreement, providing the tax increment assistance as outlined to the developer for the project.
33:50The project construction is anticipated to commence in February and uh complete in the summer of 27.
33:59Um, I list here our outside team for contact information.
34:03Uh, Carla and Stacy are both in attendance here, as is uh Ari Perrett's the developer, if there's any questions for him.
34:13Do you have any questions?
34:18Oh, council president.
34:21Joseph I thank you so much, Ms.
34:23I don't have specific questions, but I do think if the developer is here, it would make sense to hear from the yeah, that's what we were just talking about.
34:29So um uh Ari Garretts, the developer is gonna come up, just introduce himself.
34:37Thank you, Vice Chair and Commissioners.
34:38It's a pleasure to be with you in this capacity today.
34:41Um, I'm Ari Perretts.
34:42I'm the founder and president of Afton Park Development.
34:45I think I'd qualify as about as local and neighborhood of a developer as you could be.
34:49I live in the Summit University neighborhood of St.
34:52Uh I've previously been fortunate to develop in our city.
35:00And it really is a privilege to be able to work on such an important site, not just in our neighborhood, but the city and the metro area overall.
35:09We started this process six months ago in June of this past summer, as the financial realities of financing development construction crystallized for this specific project.
35:23We've gotten questions before about why this wasn't a part of public discourse prior to that.
35:27The truth is we were totally focused on our uh approvals and the the land use approvals and entitlement prior this summer when the financial realities crystallize, that's when we put forward our application.
35:39Um and we've been spending quite a bit of time as as city staff will attest, making sure this is right.
35:45Um there have been uh questions asked about how much we need this, and is it true that at an intersection as important and iconic in many ways as Granit Victoria?
35:57Why would an intersection like that need this kind of public support?
36:00The truth is is that in today's economy, just about every market rate project needs this kind of public support.
36:07It doesn't matter how good of an intersection it is.
36:10The best intersection just gets you to the table to be able to have this kind of conversation.
36:14That's how hard it is to uh assemble financing for new developments today.
36:20Uh I'll I'll share a statistic uh that just came across my desk in the last couple days that I think will help illustrate this point, specific to the Minneapolis-St.
36:30We are ranked dead last of the top 50 MSAs in the country in availability of market rate multifamily housing.
36:38And that counts both the inventory that exists and the vacancy rates, which in our market are very low, and uh the availability of new supply, how many projects are in the pipeline under construction.
36:50We are at the end, the very very last of the top 50 metros.
36:53And that shows you that we have no new supply.
36:56This is the reason, is because it is this hard to develop in today's economy without the kind of assistance that redevelopment TIFF districts can offer, even if it's at as important of an intersection as Granite Victoria.
37:10I also want to share that because many of us have been fortunate to spend time in and around that intersection, it's not immediately apparent to you or to anyone why this site in particular is blighted or why something at Granite Victoria would count as blighted.
37:24So above and beyond the report that LHB did, which is the statutorily required analysis.
37:31I would invite anyone who's curious to come in and tour the inside of these buildings, and you will see with your own eyes why these buildings must be torn down, why they cannot be reused, and why they qualify as blight.
37:43Elements on the outside anyone can see just by standing at the sidewalk, and then there's much more inside that help paint this picture.
37:49So I just wanted to extend that offer if anybody would like to come see it.
37:52I'm happy to show you around.
37:55So I that covers sort of why here and why now and why this is a unique feature and function of today's uh economy in this particular site.
38:04A lot of the public benefits, including the pooling for affordable housing, have already been discussed.
38:09I just want to reiterate how much of a driving factor that was in our whole conceptualization of this site, the ability to not just provide needed new housing units, but also to provide a major improvement to the public realm at this corner and at this intersection overall.
38:25New commercial space, which includes uh a tenant that's coming back into the space and able to re-up for the next 10 to 20 years.
38:32They've been in this location for a long time, but their space has deteriorated like much of the rest of the physical infrastructure.
38:38They're able to come back and we're able to create two new spaces for two new tenants together with public parking, which which has been a pretty significant issue at this intersection.
38:48Uh many of the criticisms that have been uh I know shared with you all and have kind of circulated in in the media have a lot to do with this project not meeting but four, I think, based off of the information in front of you.
39:01Hopefully, you see it very clearly does meet the butt for, and you hear coming from me we don't have an ability to create this project without this.
39:08Um, but also this concept of a precedence set.
39:12And I just wanted to state for the record the six months that my team has spent working with city staff should illustrate that there is no precedence set.
39:20Every project has to stand on its own merits, defend its own assumptions in its own time and place to make the case for why but four applies to it and then my project has done that.
39:33That doesn't mean that me or any other developer six months or twelve months from now in a location that's perceived to be just as nice or or in a different spot, would be able to just somehow as a gimme come in and say, Well, they got it, me too.
39:46That's not how this works.
39:48Like based on my own experience in the last six months, I can guarantee you that's not how this works.
39:52And I just want to state that for the record.
39:54Um, and and be able to address that concern as it continues to circulate in in the public discourse.
40:00Uh so I'm glad to take any questions.
40:01I really appreciate your time and attention to this matter, and I thank you in advance.
40:07Parents, for being here.
40:08Any questions from commissioners?
40:12Um, well, this item is thank you for being here, Mr.
40:16Um, this item again will be before um the HRE in the council.
40:20Um, at the eight at the council meeting next week, we'll be convening the HRA within the council meeting to take action, and at that time before we take action will be the public hearing for this item.
40:30Um, not today, there will be a public hearing next week.
40:39Well, the developer would be able to make a comment.
40:41Um, yes, we have the the the developer come in and just introduce themselves and speak, but the public hearing um on this item is next week.
40:53Well, um, that is the last item on our agenda, and with nothing else to come before us, we are adjourned.