7:04Meeting of September 25th, 2025 is now in session.
7:07The first order of business is to approve the minutes from the September 4th meeting.
7:18Would you make any corrections?
7:20Do you have corrections?
7:23And the uh what's your phrase?
7:26There's a reference to the wife of the applicant going to from the porch to the basement, and I believe that's incorrect.
7:33Uh it's got to that line has to be uh either edited or or struck from the uh minutes.
7:41What paragraph are you on?
7:47The porch makes it easier for him and his wife to navigate their way to the basement.
7:53What paragraph are you uh?
7:54I think he did say that.
7:56I think I think it's it'll leave it to the Fifth.
8:02Right, yeah, no, it didn't yes, the answer in well.
8:05They don't have to go to the basement with the porch was part of the thing.
8:09Yeah, I think it's I just thought it's fine.
8:15Yeah, I think it's fine.
8:30Uh minutes are officially adopted.
8:34Uh we will now do the public hearings uh for today.
8:37First, the applicant or the applicant's representative will state the reasons for the requested variants and present any material or documentation which is to be considered regarding the proposal.
8:45Next, persons wishing to speak in favor of the proposal will be given the opportunity to address the board.
8:50Then persons who wish to speak in opposition will be allowed to address the board.
8:54Finally, the applicant or representative will be given the option to make any closing arguments or comments.
8:58Following the public hearing this afternoon, the board may make a decision on each application heard.
9:03The board may also decide to hold its decision until the next public hearing.
9:51It's in the MX One's own district.
9:55Somebody here to speak for the applicant.
10:00You run such a good public hearing, Jeff.
10:01Just give us your name and address.
10:04I'm an attorney with Barclay Damon.
10:06We're at 125 Jefferson.
10:09Here representing T Mobile.
10:12And thank you for the opportunity to speak.
10:22And actually, a little background, two years ago, I got approved replacement of that steeple or cross with new antennas in there at by the planning board.
10:37As we then went to get the equipment to put the antennas in the cross, that equipment was no longer available and no longer made.
10:45So as this industry goes, this is what's known as a three in one antenna design.
10:51So normally you see antenna rays when you drive down the throughway and you look up at a tower, you'll see that there's three on one side, three on another, and three on another.
10:59It's like a triangle, and there's three antennas on each one of those faces of the triangle.
11:04Each one of those antennas is doing a send and receive in a certain area.
11:08Inside a stealth cross, they actually take all three of those antennas and combine them into one antenna that then faces one.
11:17They still have three of them, but one of them faces one way of each one of the asthmoths of the triangle.
11:22When you have a three-in-one antenna, it requires the antennas to be bigger.
11:27So as a result of us trying to keep this a stealth facility at the church and still allow the upgrade in technology for the new antennas.
11:37Um it required a redesign.
11:39And so we worked for the last two years with the church to come up with a redesign that uh works for uh them but also works on a technology side.
11:49Um the redesign is a replacement of the stealth cross.
11:53Um the replacement uh is a taller stealth cross and a wider stealth cross, but it allows the bigger antennas to fit in there.
12:02As a result of us being taller, we now exceed the 20-foot height limit by two and a half feet.
12:08Uh and so the requested variance is the two and a half foot variants above the allowed 20 foot that we we could do in the code um for an antenna.
12:18Um there are currently eight other antennas on the structure.
12:25This structure's been used since 2003 to support antennas for various wireless companies.
12:30There are eight antennas on there that are uh old Nextel antennas.
12:35Next Dell no longer exists.
12:37It was then through a series of sprints and then T-Mobile, it is now all covered under the T Mobile umbrella.
12:43So as part of this application, um, we would be replacing the stealth cross and then removing those eight nextel antennas.
12:51Those are on the exterior, those are visible.
12:53People can see the antennas.
12:55Um, and so those will actually come off.
12:58They will no longer be visible, and all the antennas on the facility for T-Mobile purposes will be contained solely within that stealth cross.
13:05Are we talking about the large cross on the right or the small one on top of the steeple?
13:10Uh, we're talking about the one on the right.
13:13Uh, and so you can see overall the you know, we're well below the overall structure height um when you cat when you factor in the steeple height.
13:21Um, but the cross on the right, uh, and that is a um is that an existing or proposed photo there?
13:31At the bottom, it's yeah.
13:33So that is the proposed, so you can kind of scroll through.
13:36That's what it would look like after um installation.
13:40Um this is what we've been working with the church for approval on for that installation at their facility.
13:48And I can answer any questions that you may have, but that's roughly the gist of it.
13:52We need a two and a half foot height variance.
13:54After that, this is a uh minor site plan, so uh it will be an administrative site plan approval.
14:01Any questions from the board?
14:04Uh one being I think you've commented on it, but there's no other technology that would reduce the height that would fit within the variance.
14:13If there was, we would we would have done it over the last two years.
14:17Then uh slightly up to purview, but what is the material of the stone cross that you're you're capping the it will be it will be a new new cross.
14:25The exterior of the material has to be all RF-facing material that allows the the material, the frequency waves to go through it.
14:32So it's not uh uh a solid surface stone material on the exterior.
14:37But it will look, I know that you had commented that the new one is is dirty, right?
14:41It it is you know, uh it's been up there for a while.
14:44This will be an all-new facility, uh, and similar design.
14:47That's this is what you see right there.
14:49But uh where those antennas are, that is an RF transparent material that allows them to go through.
14:54I can't tell you the exact name of it, but um uh if you have something right in front of the antennas that isn't RF transparent, it blocks the signal.
15:02So is the intent that this one obviously is new, so it'll be clean, but is it gonna be maintained more than already has been or um it will be maintained.
15:13Uh I mean we're we're when we're there, uh there's not a lot you can do in terms of you know it once it's up.
15:18Yeah, once it's up, it's up.
15:20Uh uh, you know, there's uh like any structure that's 70 or 80 feet in the air, uh it it will be it I it will get dirty.
15:28Uh but uh they certainly make sure that there's nothing that uh like no nests on it, none of that type of stuff because all that causes interference and issues.
15:37So when they do go to the site and they maintain it, which they do about once a month, um, they're looking for those type of things.
15:43And if there's anything wrong with this with it structurally, something's broken, uh, then that all gets repaired.
15:50Is it do you have an idea of the lifetime of those antennas?
15:53How long that would be needed?
15:55Yeah, well the ones I mean, actually I I did this original stealth lacrosse, uh Stealth Cross many years ago.
16:01So it it's probably been there 15 years, I think.
16:05Um so the antennas that were inside there were replaced twice since then.
16:09They the antenna upgrades that happened happen quite frequently.
16:13Uh every few years they're going back.
16:15The design of this one is designed, understanding that there's still capacity in there for future antennas and and what they're seeing.
16:21They at their time they may replace those the exterior so it would look fresh again.
16:26Uh I I'm not sure if they would if they would need to do that, but uh the goal is that they don't have to do this again.
16:31This is very expensive uh process to go through.
16:33Mounting antennas on the exterior of a building and pending them to match um is a lot easier than than going through this process.
16:41Other questions on the board.
16:44Thank you very much.
16:47Anyone else who wishes to speak in favor of the application?
16:54Anybody wishes to speak against the application?
16:56It's your shot, Heather.
17:01Uh hearing none, I will close the public hearing.
17:08Um discussion questions from the board?
17:12I have a general question.
17:14Is the obviously it's a 20 foot, I'm not necessarily against it, but where did with the new rezone that 20 foot item come from?
17:22I mean, I know you weren't part of it, but with the fact that this is probably gonna happen more and more.
17:27Um, you know, is this something that we need to look at and you know, increase the height at a future point, and this is just gonna be one of many, or uh so we will discuss later uh about this one, but uh right now it's um just about this application.
17:52They are requesting the higher so normally we will see the antenna will be less than 20 feet, but this one is uh special.
18:01And um we will discuss later about the code.
18:06All right, if there's no further discussion, does somebody want to make a motion and take us through the area variants?
18:11Well, we have to do seeker.
18:19Not only is it a little bit taller, but it's significantly larger in mass than the existing one.
18:24So I was just asking.
18:25We don't have any purview over that.
18:29Well, to the extent that you're allowing it to be taller.
18:34Uh you have purview over the size, because you could not grant the variance if you believe that with the height and added bulk, it's um not compatible with the neighborhood.
18:47It's not that it's big.
18:57Where's our secret note?
18:59Has everyone had a chance to review the EAF part one that's contained in your packet?
19:03Prepared by the applicant?
19:04Has everyone had a chance to review the EAF part two also contained in your packet?
19:09And prepared by staff on your behalf.
19:11Does anyone believe the proposed action will result in a medium moderate to large impact under seeker?
19:25Having determined that there will be no moderate to large impacts, I recommend that you make a negative declaration and complete the EAF part three accordingly.
19:34Someone make a motion on the negative declaration.
19:37Motion on a negative declaration.
19:45We're moving to declare a negative declaration under seeker.
19:48Moving to determine a negative declaration under seeker.
19:50You're gonna ask me a script.
19:54First, second, okay.
19:56All those in favor of a negative declaration under seeker.
20:06Is there a motion on the area variants before us today?
20:15Motion to approve the variance.
20:19Liam, will you take us through the uh balancing task?
20:26I I think as far as neighborhood character goes, I think the uh one, the fact that the church is working with these folks, I think you know they feel strongly that the change is not so significant that it would affect the character.
20:39Um as far as the height goes, it's it's minimal.
20:42Uh as far as feasibility of alternatives, if there were any, um the project would have happened sooner.
20:48There was a delay due to the lack of it.
20:51Um I think this is insubstantial, not substantial, uh with two and a half feet.
20:58Um there are no real adverse effects as far as I can tell.
21:05And as far as it being self-created, I think uh you know it is, but that is not a deal breaker, and also the equipment challenges make it um mitigate that anyways.
21:16Otis, anything else?
21:18Yeah, the only thing that I would add is that uh uh as long as they follow uh the recommendations made.
21:27I think uh it's a home run of I live in that neighborhood drive by the church all the time, and the property is very well kept.
21:39And the uh increase in size is going to be so minimal that I don't know who would recognize it.
21:50I mean, you literally would have to get up there with a measuring tape.
21:54So with those things being stated in uh the recommendations of uh uh the committee here, I concur and think that it's a great uh project.
22:08Um so in addition to uh the balancing test, um the uh motion includes a general condition approval.
22:17Uh sorry, the conditions for general conditions for approval.
22:20I didn't sleep a lot last night for the area variants, and then staff is recommending that they require that the applicant uh obtain all required permits prior to the site plan approval and that they ensure that the tenna and supporting structure are maintained in good condition.
22:36With that's all said, all those in favor.
22:41Motion carries one opposal.
22:44Oh, you're opposing.
22:46I thought you said aye first.
22:48All right, one opposed.
22:49Uh all right, motion carries.
23:01Uh motion to adjourn.