4:52We're gonna jump right into it.
5:00So counselor, where we see.
5:07So shall anybody take that or should we so I'll keep it on the back.
5:13So counselor my joke.
5:15Thank you, Madam President.
5:16I have item 12 to 22.
5:23Anyone from BPW here.
5:33So we were on the purchasing this slot on Midland.
5:37Uh we own most of the properties in the area.
5:39Property owner approached us uh looking to get rid of his property.
5:44The sale prices for a little less than appraised value, I think.
5:47And this is just to create um an open space assemblage in the neighborhood.
5:54So do we know what we want to do with it?
5:56Just holding it forever uh forever recreational open space, passive recreational space.
6:03It's right next to the creek walk, so it's a forever green space, right?
6:07Yeah, it's in the it's in the flood zone.
6:09Um but yeah, we thought it was in the city.
6:17Is it getting bought from a resident or from who?
6:20Um I do believe it's a neighborhood resident.
6:23Obviously, it's vacant land, so the person wasn't living there at the time.
6:25But the the space has been vacant for my entire 20 years at least.
6:37Um the next one, maybe Mayor Robuson.
6:42Oh, nil, neil that you're good afternoon, counsel.
6:51Um3 is uh related to a grant opportunity with New York State DOT.
6:59This is a transportation alternatives grant.
7:01We've been pretty successful with these over the past few years, and these typically cover pedestrian and bicycle safety improvements.
7:09Um we're working on the application now, but we're here for um your approval first before we do anything.
7:18Pedestrian okay, all right.
7:25Any more detail at a granular level in terms of what you'd want to do with this money?
7:29So for these, we typically utilized studies that have already happened from SMTC.
7:35This area we're looking at near West Side Skunk City.
7:40Uh there's some really great studies that have come out in the past few years from our friends at the MPO.
7:46So we're gonna repackage that and use it.
7:48Um as we get cl further along, we'll be back for authorization as it relates to any bonding or anything like that.
7:59By then we should be able to have rooms to maybe be specific as to what we want to engage these money on.
8:08Any RFPs that we should know about?
8:12Um specific you're feel free to reach out always.
8:17Just wanted to make sure that if we were writing a grant that involved vendor selection, that we have that done now versus later on.
8:24Yeah, so we're not there yet, but of course, we'll obviously come to you guys for approval.
8:36Good afternoon, counselors.
8:38Mary Robison, City Engineer.
8:40Um item 14 through 16 is related to a tip project.
8:45Uh the north-south-east-west corridor signal interconnect um phase two project, which is primarily on uh James Street and South Salina Street.
8:58We bid this project last year and weren't able to award it.
9:02Um so we rebid it recently and unfortunately it came in above what our budget is, so we're asking for an additional 260,000 for um the construction phase.
9:16Um as I told you uh at the last meeting, there's no tip money available for this.
9:24Um so we are using local shares, so that brings our federal reimbursement to 57%, marchically to 11%, and local share at 32%.
9:40The march is selling goes down because of this the additional money.
9:45Last year we needed additional money as well, but now we have a contractor and we're going through the process.
9:52Um we need to get the additional money and amend our agreements with the state.
10:00So 14 is the amending the bond authorization, 15 is um mending the agreement with DOT, and 16 is increasing the project authorization all by 260,000 for total project cost of um just under 4.6 million.
10:16Mary, how far up James Street?
10:17Is it just at James and Salina?
10:19Just at the intersection?
10:20No, it's along the corridor.
10:21I'd have to get back to you specifically.
10:24It's miscellaneous intersections tying the signals together so that they're properly timed and traffic flows better.
10:34Any other questions?
10:36So that took care of $14, $15 and 16, right, Mary?
10:40So next one is a uh bridge New York project, which is also kind of a tip project for replacing the East Calvin Street um culvert, which uh over Meadowbrook.
10:53So 17, 18, and 19 when we came to you for this project, which is 1.476 million, 100% reimbursement.
11:03Um we forgot to add some language that is required in the ordinance to follow New York State DOT Bridge New York.
11:11And basically it says that if we go over the 1.476 million, um that any additional cost would be local share, and the other piece of language that's added is the schedule to get it done.
11:27Which is like 24 months for design.
11:31We're this is a box culvert, which is like a square culvert, and we're taking it out across Calvin Street, kind of near SU and Comstock Commons in that vicinity, um, and replacing it, putting a new culvert in.
11:46Are we projecting additional costs?
11:49I wish I could answer that question.
11:52I can't at this point.
11:54We're just we're just uh we're just starting.
12:00We're still negotiating the contract with the consultant.
12:03I'll be back to you soon with that.
12:07Any questions on that?
12:10No, that's 17, 18, and 19, right?
12:14So 20, the next three are all revocable permissions for SU for their residential um living unit, you know, halls.
12:25Uh the first one is related to the residential hall at 501 Comstock.
12:31They're putting miscellaneous uh duck banks underground.
12:36I can go through the locations, but it's listed pretty clearly in the um short title.
12:42Um so this is our standard revocable permission, giving them permission to install conduits in our right of way or duck banks.
12:50Um, and then the we calculate our annual estimated fee for their occupation of our right of way, and the one at 501 Comstock is three thousand three hundred and twelve dollars.
13:05So mayor for so the duration for this uh permission is three months, right?
13:12The duration of the case.
13:13We we charge them every year.
13:15It's revocable if if we're doing a project and they need to relocate or we want want to revoke it, they would have to find no an alternate location.
13:26Obviously, we can't cut off their electric and communications, but there's no sunset for this unless there is no sunset unless the council revokes it.
13:37You have the ability to revoke it.
13:40And that can be initiated by the city or uh or a series of university, right?
13:45If they pull it out, they can yep, ask it to be terminated.
13:49How did how did the fee come to be determined?
13:54So this started back in approximately the year 2000.
14:00Um, and the fee at that point was based on a dollar per linear foot for a four-inch conduit.
14:08And that price has been tied the to the I think it's a consumer price index.
14:14It's one of the indexes.
14:16I'd have to look it up.
14:17So that price has escalated every year since approximately year 2000.
14:25Does this provide any additional right of way access?
14:30Like in terms of service and conduit and things like that.
14:35They put it in only if they need to repair it or replace it.
14:41Then so once it's installed, it's just there.
14:48So if you look at the letter, it tells you how much.
14:52I don't have it right in front of me, but it gives the price for each of the conduits, the four-inch, the five-inch, the eight-inch.
15:09Any other questions?
15:11These fees are paid prior to them starting, right?
15:17Once this gets approved, then they submit, they have to submit all the insurance that's required for the revocable permission.
15:24And they have to apply for a streetcar permit.
15:27And they pay fees associated for you know per our streetcar permit.
15:33So this is just the uh the annual fee is you know for occupying the right-of-way.
15:40Who set these prices?
15:43Is it the city basal?
15:45The city, yeah, based on the a dollar per linear foot that was initially established in approximate maybe it was the late 90s.
15:54Does it have a go up?
15:55Does it have a lot of it?
15:56Yes, it's tied to the index.
15:58Consumer price index or construction cost index.
16:04Any other questions?
16:08Uh so then just 22 or 21 is that for 505 comstock av.
16:15Electrical and communication duck banks.
16:18And 22 is for the residential hall at 315 waverly av again, communication duck banks.
16:34That'll be all of them.
16:36Uh, I'm gonna go to Council of Calga.
16:42Penny Agua blesses the all today.
16:45I have item number 10, and here we go.
16:49So hello, I'm uh Tom Ferrar from the city school district.
16:52I'm the director of facilities.
16:54DeFlorio, Chief of Operations, is here.
16:57So uh we have two projects here that we have to talk to you about, and they are both for field turf field replacement.
17:03So um the turf field behind Sunny Crest Rink at Hannegar, not the main stadium, but the one behind it uh and the one down at Valley Field.
17:14Um both of those pieces of turf are over 20 years old.
17:17I think I've had three park commissioners ask us if we could replace it, and we worked with them to do that.
17:23Uh when the school district does these projects, we get aid on them.
17:26So those two fields are permitted by City Parks who operates those.
17:30Our kids use them heavily, they're used by the community, uh, but we get aid where you would not get aid on.
17:36So that's why we did it as a school district project.
17:38Because we did JSCB phase two projects at both areas, we have to tie them to the buildings.
17:44We had to wait five years to the aid reset.
17:46So we started on these projects 2024.
17:49We got the projects approved by the school board.
17:52We did our normal designs, and we had got those approved by the state.
17:56That usually takes about a year.
17:57Uh we awarded the POs for the projects last November, and the contractor is ready to rock and roll on April 1st, as soon as the weather breaks.
18:05Um and then the projects will be both be done in July.
18:08The fields are in a condition right now where I think it's real questionable.
18:15I've cut a PO for what we call a G test.
18:18So if we don't do this, we're gonna have to run I'm gonna have to run a G test to make sure that we can still use the fields.
18:24So what happened was um there was a rural school district that used what they call the piggy backing law, and Chief Pachanko would be here to explain this to you today, but he's advocating for the district in Albany.
18:36Um so what happened was there was a piggybacking law in a rural school district down in the Binghamton area went a little too far with the piggybacking and basically like tried to do a whole renovation by piggybacking, and a judge said you didn't competitively come um get that work, you can't do that.
18:53Well, the judge left a lot of uh things unsaid.
18:56There's been an appeal on the case, they're not gonna know the answers on the appeal until like late summer in the fall.
19:03So out of caution, the New York State Comptroller issued some guidance, and people are concerned that the way we procured this, which is through piggybacking uh in November may not be a hundred percent good.
19:16So what we're asking for is a bid waiver because if we cancel these POs, we're gonna get cost, and then we're gonna have to rebid the work won't be done until at best this late fall or next year.
19:26So that's why we're asking for bid waivers on these projects.
19:29Uh on Dog County, Hopkins Field did it the same way using um not a bid waiver, but did use this same piggybacking.
19:37Uh we did something very similar uh on other projects like that for uh for turf replacement.
19:43So I I have a question.
19:45Um I guess my question is are there long-term capital improvement plans in place to to it's it just I'm not a fan of waiving RFPs for whatever reason we do it.
20:00Um when I read over the information in our packet, it said that because you guys had a long-term relationship with this company and have worked with them before, you wanted to go with them.
20:06I don't know that that's always in our best interest to do that.
20:10Um so I'm not saying we shouldn't do these projects, but I have a real issue with us continuing to waive RFPs and not get the most competitive bid on projects because it ends up costing us more in the long run.
20:23Maroon who's known me for a long time.
20:25I think I think I've asked for one bid waiver in 17 years for the school district from you folks.
20:32So we we don't normally do this when and um so it's it's not something we normally do.
20:37Um we're gonna have to see what the courts say about this.
20:40Um the one thing that's nice with this firm that we're using is field turf.
20:44So the parks department and us have to maintain it, and there's different types of turf.
20:49So when you go to bid, somebody can substitute and under New York State law, because we're using public money, if it's or equal, we have to accept it.
20:55So one thing nice about using these types of contracts is we get the same type of turf, which makes it easier for all of us to maintain it.
21:02So there's pros and cons about things like that.
21:05But I I do think this is uh um a good reason to for a bid waiver.
21:10Oh, I was just gonna ask, and by by doing this process, then we're you can start in April.
21:15Start April first soon, but even earlier, whenever the weather breaks, whenever the weather breaks and we'll have a couple nice ribbon cutting ceremonies uh end of June for all of you folks to come to the city.
21:23So we don't it would only take to June.
21:25And our busy time for turf is really the fall because we have football and soccer.
21:29We use it too in the spring for other sports like lacrosse and things, and we have uh the girls' football, flag football is a very big sport now.
21:36It's really taken off.
21:37We we do that in the spring.
21:39But this is actually, and I I won't speak for the commissioner, but this is actually a good time to get the work done.
21:44And then uh for we're also we talked to parks um for the Valley Lacrosse League that starts a little earlier in June.
21:50We'll we will make our other turf fields available for that program.
21:54Yeah, so one of the things that um we've talked previously, and I've talked to um Mike Kachinko uh regarding this, and also we are really pushing away from um letting people get get through without putting RFPs out.
22:11And he explained to me the situation, and also that as you guys are moving forward with all the joint construction school construction board that you guys are RFP in and doing all the great things to make sure we have a competitive bids, right?
22:24Right, that that all gets RFP'd.
22:25Um we work we we do all our capital projects with the city engineer's office.
22:30So uh what happens is it all your role, uh believe it or not, is financing.
22:36So the JSCB stuff we have to bond for that.
22:39So that all comes that'll all come through you.
22:41So yeah, we have the first three projects.
22:43We uh have the architects under contract now, so Nottingham, uh Seymour, and Webster.
22:50Nottingham is saying Hanneger is on the list too, and is Corkman.
22:57So we're we're gonna do we're gonna get the whole the whole district done.
23:00We're in great shape though, we really are.
23:01So we have the architects just got selected and they've been uh they're gonna start.
23:05We have public meetings next week.
23:06We're hoping we can see it.
23:08Nottingham and Seymour and Webster uh next week, five o'clock.
23:11Uh I think it's Monday, Tuesday, and Thursday.
23:14So um please come to those meetings and give us your input.
23:17And uh we're looking forward.
23:18Those projects will be coming through to you for the financing.
23:23I do have a question.
23:25I understand that you believe that field turf is the safest alternative in terms of the turfs, but my understanding is that turf fields are not as safe for our athletes as grass fields.
23:35Could you give me a justification as to why we would be replacing turf fields as opposed to taking them out entirely?
23:41Um you could take out the turf field entirely and have grass.
23:44Um I I don't know if Commissioner Byrd wants to talk about it, but what's nice about turf fields um is you're gonna get the turf like end of March, early April.
23:54If you're dealing with grass, um my son played college lacrosse, he played in a parking lot when he was in high school.
24:00They practice in a parking lot, and you know, and even in college, uh they would go to different places.
24:05Um so that's what that's what's nice about the turf.
24:08You get it earlier in the spring here and you can use it.
24:12Um if you're talking pure I I'd have to be a doctor to answer is turf better than grass.
24:19There's different maintenance and things like that.
24:21But the the big reason is we get it earlier and you can use it a little later in the season too.
24:25You can usually are most of our stadiums shut down around November after Thanksgiving, but you could actually go farther until the snow really comes.
24:34So I just want to say that um I have been waiting for this field to be replaced.
24:42And and the reason I'm saying that is that I I don't know how many people know that this field is a feel when it comes to Tamatot, it gave you seven days a week.
24:52I go in there to play soccer, you know, with your seven children with with everybody.
25:00So just you know, you know, as of for the something year old, you are running with 20 something year old playing soccer, and the last thing you want is anything that is going to distract your past and be used as SQs and the feel is like it's it's ripped.
25:20Yeah, sometimes some winners, we can't always do it, but we actually clean the snow off.
25:24We have like some machinery, and a couple times, like up at Nottingham, we had half of the snow cleared off, and the kids are playing soccer on the other as we're clearing it.
25:33So yeah, um, you know, Lincoln, uh kid kids are out as soon as those fields are cleared.
25:38We uh yeah, we really um get a lot of use community use out of these fields.
25:42So I I appreciate what you guys are doing here.
25:44That feel, even if during the day, if you go summertime, just take a trip out there, summertime, and any uh late afternoon, early evening, you will see three, four, five teams across that field.
25:58Yeah, but it's overly used.
26:01Yeah so you coming guys coming through with this is is really appreciated.
26:05And then on the grass side, it's it's chillapark.
26:09You know, I I know assembly men shout out to assemblyman Mangrele.
26:13We invested a lot of money to get that field back to where it was.
26:18You two years after that, you go back and that field was torn up.
26:22So when you food turpin, you I mean, anything natural is good, but when you get into a position where the field is overused like that, the grass just doesn't hold up.
26:33And then heat, the grass is getting dry, it's not getting water, it's just it's it become a mess.
26:41More injuries, right?
26:42With respect, I hear that.
26:44Yeah, but natural is always good.
26:45Well better, preferably.
26:48Our heat index is also going up, and turf fields can have uh difference of 10 degrees hotter than grass fields in the summertime.
26:55That's gonna impact kids, and it's gonna end up impact use.
26:58So I just I want to make sure that we're thinking about use holistically, in addition to things like ACL tears and things like that.
27:05I want to make sure our student athletes continue to be healthy and have a long and illustrious career, like Counselor Caldwell here.
27:12Still used to have more twisted ankles on grass than I had on turf.
27:20But thank you, I appreciate everybody's because they're we appreciate it.
27:23They have a before you step away.
27:25Um not about this, but could you just give us an update on the field behind ITC?
27:31On the stadium behind ITC?
27:33Yeah, so the stadium behind ITC, we still do not have approval from the state of New York.
27:37We are very, very close.
27:39So as soon as we get that, we will be handing it off to uh city engineer to get it out to bid.
27:45And and I think she wants us to talk to you folks about that too.
27:49And why um uh I'm all over the place today.
27:55Counselor Rouser, um, Jones Rousser mentioned that.
27:59Can you also um make sure that the athletes at ITC get to see the renderings of what the stadium's gonna look like because they mentioned it to me.
28:09So just I just thought about it right here that you get them together so they can see it because they've been talking about it and they just really want to see it.
28:16But thank you for everything you do.
28:20Well, I'll say Councillor Innervick.
28:28Uh item 23 payment to Sundance Leisure for providing services related to the salt conversion systems at city pools.
28:36Hi, good afternoon, Saisha Bird Commissioner Parks.
28:39Um, this is a payment from physical year 2025 to Sundance.
28:45It's an amount of $2,000 to repair the salt water systems to do some work on it.
28:50So, as you all know, we've been converting some of the pools into salt systems versus chlorine.
28:56You still have to use some chlorine.
28:58Um, but the goal we're really pushing this year to get the the pools up and running on these salt systems.
29:06Um we have a training March 11th to learn how to use the system again with the team.
29:13And so I'm hopeful that after that training we can start getting them up and moving.
29:16Some of that had to do with like um IT connection in the in the pools and the buildings, outdoors.
29:23So we've been able to work through some of that.
29:27Um, and just to add to the gro the turf versus grass, I also understand like grass is so much better.
29:34The the hard part about grass for some of the fields.
29:37I know my kids play at Norwood, is irrigating and reseeding, and they play on it so much that there's holes and bald spots, and so I'm sending teams out all the time to fill holes to plant more seeds, but they use them so often it's hard to get them irrigated and seeded because they're always on them.
30:01Is there draining pipes when it rains at these facilities?
30:07Under not I know not Norwood.
30:11So parts of them stay kind of wet, the practice field does.
30:17But economically, is it more to more to have turf fields and grass fields?
30:26I know you get longer play time on a turf field.
30:30You know, they're more attractive.
30:31It's less work for for our crews to go out and seed and arrogate, but no questions about sundance.
30:42We're gonna thank you very much, Commissioner.
30:45Reason why you're up there.
30:58Thank you, Madam President.
30:59I have items 24, 25, and 26.
31:07Afternoon, counselors.
31:08I'm Deputy Chief Tom, Syracuse Police Department.
31:10Uh I have 24 and 25.
31:12They are to ask and to enter into an agreement with Helio Health to provide mental health awareness and wellness training for our department.
31:20And 25 is to enter an agreement with Helio Health to provide uh evaluating services for our officers in crisis.
31:30So we did an RFP, and the applicants were Helio Health and another company.
31:36Uh Healy Health provided a better, a better, more comprehensive service.
31:41They have more resources available, they have a larger library when it comes to training.
31:45They were going to dedicate specific people as our evaluators.
31:49We have an established relationship with them already, uh working relationship.
31:53Um, and they were the most cost-effective.
31:56Um was any of the counsel on the RFP?
32:00Um I think President Paniago was there on the committee.
32:05Um I have my reservations about Helio Health.
32:11Um, their reputation with their their main business um is not so good, but at the same time, I just feel like being that they need to focus on their primary work, that that will be pulling their staff away from what they do to accommodate this.
32:39Um by any chance do you know what the other uh the other RFP's responses were, who those were.
32:47They couldn't give us so we asked specifically for who the trainers would be and who they're not the trainers, who were the other RFPs.
32:53Uh the only one local was COMCs.
32:56Um, and there they had two clinicians here in City of Syracuse.
33:00They couldn't dedicate them full time.
33:01The other ones were virtual uh in Florida.
33:04And I'd uh capacity.
33:06I'd prefer to work with a company that's local and that we can have face-to-face interactions with.
33:12And they did say that I can't speak for how much of a strain would fall on their other business, but we did have an interview with them, and in meeting with the evaluators and the educators, we felt very comfortable with what they were going to provide just in terms of a service.
33:30They've also um just speaking on the housing aspect, they've also entered that arena as far as like wraparound services, um, and they've done a terrible job at that.
33:42Um so the things that they state they can do, you know.
33:46I don't know, you know, if that's 100% true all the time.
33:52I think they just have their hands in a lot of things.
33:55Um, but from our standpoint, our our um working relationship with them from being co-responders um in and interacting with people with mental health issues, and then working specifically with an officer when we had an officer in crisis.
34:12Um there's a a very the people who will be working with our officers are are not the people that are out in the field, and that was very specific on our part to make sure there was no uh conflicts of interest.
34:26Um I can't speak of how well of a job they did.
34:29They did present really well, and they give a very um very compelling reason that we should go with them.
34:36We could talk all day about the shortage of mental health.
34:38Yes, you know, that we're we have a problem where we just don't have enough providers to actually be taking care of people.
34:43So I know I say this every year, but thank you for at least making sure that we have a place for people to go.
34:49Your jobs are not easy.
34:50You you go to them, or do they heal your health comes to you?
35:00We'll have what we've done in the past is we can have uh phone conference, and if it escalates to the point where we need them to respond in person, then they'll respond in person.
35:04Okay, so they are there also in emergencies.
35:08Yeah, there so let me let me um clarify.
35:14I mean, item 24 is specifically for training uh for our officers, our command staff, our peer support team.
35:21Item 25 is in emergency situations, they will respond.
35:26And to go back to what council Jones Rousser said about the neighborhoods.
35:31Uh Heli Health has an apartment on Catherine Street.
35:35I've heard complaints from constituents there, people shooting themselves up.
35:40We've had many police officers have to travel in that area.
35:45So they and there's people who who have crisis issues, who have mental health issues, who live in that neighborhood, and they call me about issues like that as well.
35:55Last week I met with a nurse in my office, and we talked about healing health and what they do.
36:02So I understand that it's it's important, but sometimes I mean it's a great program, but as the counselor said, um, they're not always good neighbors.
36:12They're not being held responsible of what they're doing sometimes.
36:18And that's the point that we we wanted to bring across.
36:22Because that puts a burden on you department.
36:27I mean, this is not to serve the community, it's to serve this is the only to serve the officers.
36:32We know that we're saying that the just to make sure that what they do is specific to the community, but they're reaching in other places that they're pulling staff, I believe, to do stuff that they don't normally do, and it's weakening everything.
36:55So Chief, I I understand number 24 as being on the training part.
37:04Number 25 being on the evaluation side.
37:09I thought last year we that there is a specific person dedicated to the evaluation of officers.
37:17Why is helial help being pulled in?
37:19We had a contract with Dr.
37:21Bernard that we severed our relationship with because there were conflicts of interest in how she was treating our officers.
37:28So we went back to the drawing board, we did an RFP, and we decided to separate the two um programs, being one's treating and then one not treating.
37:38One is an evaluation and one is uh instruction or education.
37:43So we no longer have that relationship with their own.
37:45What about because I I also remember fire department also had at another one.
37:51Is it was there a way?
37:53Chief, uh am I just not am I confusing things here, or don't you have an evaluator as well that you use?
38:05Um, this is a different program.
38:07And we're gonna use Krause help people for similar types of issues, but this is gonna be like um our behavioral health, um, critical incident stress.
38:17Um, when we have uh people that need to get umger management, all these different types of uh social behaviors.
38:24Yeah, the psychological distress of the work itself, right?
38:28And I'm I'm not totally familiar with their program, but I think they're they're not exactly the same, I will say.
38:35Yeah, they're different.
38:36And we were we were working with who who put in for our RFP as well, and they did not apply for our RFP.
38:42So do you have any knowledge of people being pulled out of I I don't know in terms of how their business is run.
38:50I can't I can't speak for what they're doing with their resources.
38:54Um and I understand that's the reputation from the community standpoint, but like I said, we've had a we've had a great experience with them in in or in from a training aspect and also from an evaluation aspect.
39:07Any other questions?
39:09You'll say I'm also thank you.
39:35That project will be um to move us to 1153 and to provide for the remainder of the project management costs on that project.
39:48So we've um we've had moving expenses on the last three to four uh agendas.
40:02Yeah, I can explain that.
40:03So two sessions ago, I did come before you and I asked for money for the move and the project uh management, but that was for bonded cash.
40:11And what we learned between the council session and the vote is that um bonded cash cannot be used for services.
40:18So I had to remove those and the appendix, the updated appendix that you got for uh the last vote didn't have the move on it.
40:26So I asked twice, but the the bond council and the usable life and all those specific rules with bonded money forced us to look for unallocated cash in our existing cash capital in order to move this forward.
40:41So apologize for that twice, but that's that's exactly what happened.
40:51Donna, are you on sick?
40:52Oh, I wasn't saying thank you.
40:53Like I spoke for everybody.
41:00Thank you for trying.
41:05I have uh oh, I'm sorry, the um the CDBG um item 27 is for a CDBG uh public hearing, um, which is will be held next Monday at 5 30 p.m.
41:22Um item number 28 is in this application I again, everybody.
41:46But we're looking to expand the senior uh exemption program.
41:49Um expanding the pool of um, I should say um increasing the eligible exemption for uh incomes 65 percent of total uh property value.
42:01We've we've provided some numbers to Counselor Jones Rousser.
42:04Uh I think we've got a meeting of the minds uh that this is a pretty good step in the right direction for for the demographic we're looking to serve and uh hope to get this introduced and uh voted upon.
42:16Oh council, um, what is the maximum for uh oh gosh, and this is what I get for not printing out my letter.
42:26Um I think the maximum is 54,999.99 cents, but I can double check and get back to it.
42:36Yeah, but you have if you have the letter in front of you.
43:00So essentially this uh just ups the percentage of taxable um assessed value that would be eligible for the exemption up to 65 percent for those making under the the minimum threshold any questions.
43:24All right, 29 is uh what is this one?
43:36Good afternoon, council.
43:37Jake Dishhaw, deputy commissioner of code enforcement and zoning.
43:40Item number 29 is a renewal for a contract to do third-party plan review for building permit uh reviews, so development can start construction.
43:50So uh as a quick summary, we recently a year ago we approved six firms to do plan review on the city's behalf.
43:57This is an extension of the permit office doing uh building code reviews um so we can get permits issued faster.
44:04It's going really well.
44:06Um we're just looking to renew with these six firms.
44:11Have we ever have have we been able to maybe collect a data to see from from the time when we didn't authorize the third party to the time that we have authorized them and and how much time in terms of how quickly the the permits have been approved?
44:29Have we we look at that to see to really make it the benefit the benefit of this?
44:34Yeah, um, we can send you information on that, but I can give a quick statement that kind of puts it in real perspective.
44:41Prior to having third-party plan review, we would have dozens and dozens of projects waiting to just get plan reviewers' eyes on it.
44:48They're just sitting in a in line in queue.
44:51Now with these six firms, as soon as an application comes in, we we put it out within a day to start reviewing.
44:58We've my entire career here that's never happened.
45:01So I I guess for what I'm trying to go at is so say in before we approve this at this time of the year before we prove approve the third party.
45:12How many um permits have gone through relative to this time of the year?
45:18The last time before we had approved.
45:21Um I'd have to run the numbers, but I mean it's gotta be significantly more because this is like adding six full-time employees to my office doing plan review.
45:31Like without them, the volume of reviews just isn't happening over the course of the week that our employees are working.
45:38Um I would love to see the volume.
45:41Yeah, we can send you that.
45:42You know, just I mean, I mean, Jake, this is this is good.
45:46Any anything we can do to alleviate a stress of being overloaded, it's it's good, right?
45:54But at the same time as people who authorized it, we would like to see the real-time data as to how this has transformed over the time.
46:04So let me let me make a comment and because this is a process that I myself went through just recently, which it you know, it flowed okay.
46:14But there was one thing um that we we struggled a little bit with from the approval of the code of the commission, uh, to share that the information of part of the project.
46:29Since these people are not here, they just don't know our our our area or or what the commission uh the zoning commission, you know, uh agreed to approved.
46:42Um so for instance, in in my particular experience, um, there were some site improvements that had nothing to do with the project that the commission gave them a certain amount of time to get it done, but that that was not part of the are you referring to delaying you know what?
47:02Are you you mean the planning commission?
47:04So this is strictly for New York State uniform building code review only.
47:10It's it's uniform in the entire city of New York, except for New York City and large municipalities along.
47:16It has nothing to do with zoning reviews.
47:18This is just for construction plan review.
47:22So building code review before you get a building permit to start, you know, raising a uh a building and framing and foundation and all that.
47:30But the process starts with the with uh with the review, right?
47:34Well, yeah, certain projects definitely.
47:46Um so there's that process, but this these firms do not they're they're doing building code review on construction plans, making sure they're compliant with the New York State uniform code.
47:56Okay, so it's different.
47:58It's different, yes.
48:00Um happy to sit down you know, outside of uh this meeting and review any of this, but uh I mean I've I've spent my career working on getting to this point.
48:10It's not been better in my time, and we can provide data.
48:14Well, I think it's great.
48:15I'm not gonna I'm not yeah, it's I think it's it's a good thing to do.
48:19I was just you know Yeah, understood.
48:21And happy to discuss the zoning process.
48:24Just making sure that the process flow even is.
48:27So Jake, big picture.
48:28Um I know one of the points of contention during the last budget cycle was the reduction of offering this amount um from I believe 600 down to 300,000.
48:41Um you're coming with kind of the second half of that allocation more than halfway through the year.
48:48Um what I guess what was the flow.
48:54How do people get into the queue to use the the third-party review?
48:58And if knowing that we're coming into budget season very shortly, if there were more money in this pool, could you push more people into that third-party process?
49:12So how they get into the queue is we are assigning these firms reviews no different than how I would assign a full-time plan reviewer sitting on the seventh floor of one park place.
49:22So we have project management and our director and assistant director of the permit office uh with project management uh staff, they oversee kind of the flow of everything and what projects are in each reviewer's plate.
49:36So they just keep assigning them based on you know capacity, uh, based on turnaround times, like based on you know availability as well.
49:45Um and they try to get these uh assigned to companies and or full personnel so we can get to them as quickly as we can we can.
49:52More money means putting out more projects, which means these third-party firms can commit more staff to do it if they're gonna make more money off it.
50:01We've been told that if if you spent more money on this, we would provide more staff to do it on the city's behalf.
50:09Um yes, and I think we'd be looking at you know close to three quarters of a million dollars, if not more.
50:19Um, as that's what I would ask for.
50:22Um, you know, kind of as we think about the next month, two months.
50:26Um I know that there were numbers getting kicked around last cycle around if we put this much in, we can get this much back out.
50:33Um I'd encourage you to think about that return on investment and how much money we can generate with additional allocations to third party review.
50:44Um, and I think you know, indirect there's positives too, because it's not just um time is money in the development world, and I'm sure many of you or most of you, or even all of you have heard from developers saying they're losing uh you know money off interest waiting and time.
51:02Contractors are in town, can't start, you know, shovels aren't in the ground.
51:06Like this helps all of that too.
51:08Um so I want I don't want that to be forgotten in the whole conversation about this.
51:14Um it helps everything to um uh about the development.
51:20Um quick note, and we can talk offline, Clerk.
51:23The short title and the the amount doesn't seem to match the latter submitted, so we can can we take a look at that.
51:36Um if you can just give I'm because I'm confused by uh I'll I'll try to do my best.
51:43Oh, it's going from Camon to me, so I'll let her talk about it.
51:49Good afternoon, counselors.
51:50Come on Jordan, director of housing and neighborhood planning.
51:53So this is a request to have uh deputy commissioner de Shaw named as uh environmental review certifying officer.
51:59So for every project that we put federal funds into, we need to complete an environmental review.
52:04We were informed by HUD a few weeks ago that the person preparing the review cannot be the person that signs off.
52:10So we would have NBD staff like myself, um people in zoning who would complete the review, and then Jake would just sign off as the officer.
52:18So on uh CPC is mirror that person, does Mira do that?
52:28So I'm conducting the environmental reviews currently.
52:33So the the office of the administration does the uh uh seeker reviews.
52:39Uh Mayor um is just the land use attorney from corp council that's uh staffing um the zoning office and our boards.
52:48Um, but the staff do the reviews and ultimately um as zoning administrator, it falls under my purview.
52:54So we're I think what Camon's saying is this would just shift um in align with that.
53:01It would shift from her to me.
53:03Oh, from you to her, okay.
53:05So this is you're the writer.
53:08So I'm the currently I am the preparer, so I'm doing the review, and I'm signing off on them.
53:14We can I can't do both.
53:15So Jake will sign off and I will do the reviews.
53:18And NEPA is separate from Seeker.
53:20There's two separate environmental review processes.
53:27Uh can you give me an update on uh 635637 East Well, North McBride Street?
53:34Yeah, so from my understanding, I believe the law department was working to send out the final 30-day and surplus notice to foreclose.
53:40I can take a look and follow up.
53:42Please go, all right.
53:44And I know you had another court street address that you were curious about.
53:48So it'll go before the land bank for a resolution.
53:50After that, we can bring it before council.
54:05I have items 31 and 32.
54:06Uh, we're going to continue to hold 31.
54:12Yeah, I have a meeting um on Friday, Matt.
54:15So yeah, if there's anything I can do to help clarify and move this forward to start up this morning.
54:20So we're gonna talk Friday and then we might be ready money.
54:24Just want to emphasize that this is um not only in keeping, you know, consistent with all of our shelter red requests, but I think uh about at the ceiling of what we do request.
54:32So um happy to do whatever I can to move it forward.
54:36Okay, we'll we'll know Monday.
54:39Maybe Friday after we meet.
54:44And 32 we're gonna hold as well.
54:51I also have item 33.
54:57Good afternoon, counselors Michael Lehman, deputy commissioner with the assessment departments.
55:01Uh just want to preface this by saying we aren't asking for any additional money.
55:06This uh is asking to amend an ordinance that had authorized funds to be paid to Hubert Brewer for the purchase and installation of audiovisual equipment.
55:14We're just looking to increase that amount, and this is that increase is based on bonds that were authorized last summer.
55:21So really just moving numbers from one column to another.
55:24No additional funding is being requested today.
55:30But is it is that that at the end of it is going to combine 26 and 33 together eventually?
55:38Can you say that again, please?
55:40Um item 26 and 33 eventually are going to be combined, right?
55:47Um they do in separate things, two different accounts.
55:50I'm only speaking for the Department of Assessments funds.
55:54Rita, I have one more thing.
55:59Ums that were originally bonded and appropriated for furniture to the installation and delivery of audio visual equipment.
56:10What are we doing for the furniture?
56:12So last year we asked for a total of two million dollars for furniture fixtures and equipment.
56:17This 497 falls under that two million dollars.
56:21We just hadn't when we asked um in December, I believe it was for um funding for Huber Brewer for appliances and audiovisual equipment.
56:32We only had authorized the amount for the appliances.
56:36And this audio visual equipment is utilized for this will be over at uh 1153 West Fiat, the new public safety headquarters.
56:45Um it'll be uh interactive and non-interactive uh televisions primarily bill.
56:58So uh so the AV that we're operating on at 511 is archaic.
57:03It it doesn't exist.
57:04We have cameras on top of our TVs that fall off when we're doing teams, that sort of thing.
57:08So this really the AV package outfits our conference rooms with smart boards so that we would have interactive capabilities in our conference rooms.
57:18There are two EOCs, emergency operations centers, one on the uh the sixth floor for the fire department, and another one on the fifth floor for the police department.
57:27Multi-screen, multi-capabilities in terms of what we display on those screens.
57:32It really brings us into modern day uh equipment that we didn't have before.
57:38So I know it's a lot of money, but it is really just it's not like we're stepping from something that was good into this.
57:45We just don't have anything like that, and we're going into you know this these products, so that's why the that money is there for that.
57:54Do we purchase off of a state contract or how do we get these?
57:57Um so we put the A V bid out, right?
58:01Um, and no one applied back.
58:03One one sorry, one person applied back, but only on the partial of it, couldn't even fulfill it all.
58:08So we worked with city government and were able to um get a waiver because we did the RFP.
58:14No one applied, so we went to HB, they fulfilled it.
58:17So no one no one came back on the RFP.
58:20Just as a side note, I think it's really wonderful to see the police and fire department working together on specifically equipment needs, and it would be wonderful to see more overlap on other non civil service positions and things of that nature in terms of your budget overlaps.
58:37Yeah, I know you talked about the mental health uh Chief Mons, Chief Rustin and I have been talking about converging that mental health work together, talking about IT, um converging IT functions together.
58:48So we are in merely earnest discussion about saving the city money by combining um resources.
58:57Love to hear more of that.
58:59Chief, that's that's because that's what I was trying to refer to earlier with with Chief Mann being here with um, not to interrupt you.
59:08But I I I feel I feel like yes, police and fire are a different uh different profession.
59:15The psychological and the emotional exposure to some to some degree mirror, you know.
59:21And if you are able to find a way to kind of utilize a same vendor, it makes makes a lot of sense.
59:30Yep, we don't disagree.
59:31Just those two particular programs that DC Tom is talking about and what the chief presented before were a little different.
59:36But there are absolute avenues, and we talked about you know the IT, mental health, um, those sort of things for sure.
59:44Commissioner OJ, can you come back up?
59:46Because Councillor Williams has a question on 31.
59:50Thank you, Counselor.
1:00:00So, Commissioner, my concern with this item has always been that our numbers are not matching.
1:00:07Um we had our committee meeting, we heard that the current payment is approximately $300,000 going to be up to $800,000.
1:00:18The agenda item has it listed for $215,000.
1:00:23Um we asked for additional detail, and you know, the number that they put out is $280,000, which again does not match the 215.
1:00:33Um, I'm I'm wondering about the discrepancy between the 215 and the 280 and how we ever make it to 800.
1:00:41Well, not to be pedantic, but we didn't.
1:00:44Um our request is simply for a shelter rent agreement that authorizes the 216 uh 150.
1:00:51Um based on the developer's calculations.
1:00:54Um if we were to calculate 10% of gross rent less utilities, if rents continue to increase at some time during the deal.
1:01:02This could be worth that um the 816 and change annually.
1:01:06Um but that that is pointedly not what the administration, what assessment is asking for right now.
1:01:11If we were to get there, splendid.
1:01:14Um but right now we're we're simply asking for a straightforward 550 a unit shelter rent or 10% of gross rent less utilities, whichever is greater.
1:01:22Um, and again, if that were to exceed the floor that we've asked for, that would be terrific.
1:01:27But right now, um wait, we only anticipate what's in the request for legislation.
1:01:33I I think I I you know there are a few cooks in the kitchen on this one.
1:01:37Um really appreciate the cooperation from the development partners.
1:01:41Um, but but the inclusion of some of these figures, I think um, I hope it hasn't unreasonably reset expectations on the part of the council.
1:01:49Um because, you know, the the the virtues of this deal, I think are contained in in our request for legislation.
1:01:58Um and I don't want to get distracted by other figures.
1:02:02How do we realize the gains if you know this future state that you talk about comes to fruition where you know how and when are we able to continue to gain additional funds from the shelter rental?
1:02:20In in in the course of the instant deal, you mean uh to two to this end of uh $800,000 protected predicted by the developer.
1:02:28If rents continue to go up, um if audited financial reports from the developer come into the Department of Finance every year, if finance is appropriately staffed and administers this property, if they bill, um and if the developer pays, yeah, it it could it could possibly touch that.
1:02:46It doesn't seem like we're ever getting there.
1:02:51I don't I don't mean to be too too um pointed with with my conditionals here.
1:02:55Um but but I you know I don't I don't like to I don't like to lean on that when I make these asks of council because we've established this um this unit fee to take some of the burden off finance and and to sort of mitigate against the um unpredictability that comes from relying on the audited financial statements of a developer.
1:03:14That's a heck of a lot of work for the department.
1:03:17Um checking that work can be a little unreliable.
1:03:23If if we request a 500 a unit, 525 unit, 550 a unit floor, that's a certain amount that we're getting every year.
1:03:30It it's not a terrible administrative burden.
1:03:32It's very predictable for underwriters for the developer for everybody on the developer side.
1:03:37Um and it's worked really well for us since before I've been here.
1:03:43I hope that's not aiming too low, but but you know, uh again I I think finance would probably agree with me that it's it's worked awfully well for us of late.
1:03:52May I I want to make a comment.
1:03:54Oh uh with these uh tax exemptions programs.
1:03:58It's like we're giving them a carrot to please build here, and we'll promise you it will there will not be any crime or any problems.
1:04:09And and I think it's unfortunate to bring people to do a project, it's always tax exemption, but the taxpayers should still have to get the bill.
1:04:20It's like we're giving them a carat.
1:04:22Yeah, and I know I know my belief isn't necessarily shared on this one.
1:04:25I I really like these shelter rent um exemptions because we do get something.
1:04:29There's an annual liability for the developer and the and the community, you know, the the corporation of the city of Syracuse right down to the community to get something it needs housing.
1:04:37Um this call 300 tax rolls.
1:04:40It it yeah, it it'll be a roll section one property.
1:04:42They'd be paying 550 dollars per year per unit annually in addition to charges and fees.
1:04:48Um and we're getting 393 either new or wholly renovated units of housing um in in a neighborhood and in a city that needs it.
1:04:57And every unit we add has a ripple effect on the rest of the 393.
1:05:02Um whole wholesale replacement of everything that's there, whether on the western portion of the complex, gut reno, and on the two new buildings to replace the eastern portion of the complex, new build at the two corners of the Westmoreland and um and East Fayette intersection.
1:05:18So uh in a in an era where HUD has starved housing authorities, there is there is no public money for building new units.
1:05:26This this is the best thing we've come up with, and assessment really happens to like it.
1:05:31Perfect, maybe not, but it's it's how we're getting new units.
1:05:35And I don't see anybody else coming up with 393 new units of affordable housing.
1:05:42So I think we end up with our back to the wall and we end up taking what we can get, which it feels like that a lot, but I I understand what you're saying that still doesn't feel great all the time.
1:05:51I think it probably feels like that in every every aspect of government, but here I don't know.
1:05:55I I I think the the net gain well outweighs the negatives.
1:06:02If it's done right.
1:06:02And again, one one guy's opinion.
1:06:12All right, so we adjourned this meeting.
1:06:14Motion to adjourn.