Browse by city
Date range
Search help

Search titles, summaries, topics and stored transcripts together. Keywords may match separately; put the whole query in double quotes for a phrase. Matching follows word analysis, so punctuation is not exact. Both dates are included. Documents are not searched.

SHOWING 1541–1550 ENTRIES
1541
DEC 9, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Meeting – December 9, 2015

The Utilities Rate Advisory Commission (URAC) met on Wednesday, December 9, 2015, at 5:30 p.m. in the Council Chambers at 915 I Street, Sacramento. The meeting covered two major discussion items: the Department of Utilities (DOU) Utility Rate Development Planning Update and the DOU Accountability Plan Update. Commissioners received detailed presentations on proposed rate adjustments, capital improvement programs, community outreach, and drought conservation efforts. No public comments were offered. The meeting adjourned at 7:10 p.m. Consent Calendar - Approval of Minutes for October 28, 2015 – The Commission unanimously approved the minutes from the previous meeting. Motion by April Butcher, second by Brian Biering, with all present members voting aye (Brian Biering, Timothy Horner, April Butcher, Andrew Day, Carolyn Veal-Hunter). Ryan McManus was absent. Discussion Items 1. Department of Utilities – Utility Rate Development Planning Update (Item 3, moved ahead of Item 2) DOU Director Bill Busath presented an overview of the rate development process, covering six areas: - Community Engagement Plan ("Your Utilities, Your Community"): A microsite (yourutilitiesyourcommunity.com), fact sheets in multiple languages (Russian, Spanish, Hmong), utility bill inserts, and presentations at neighborhood association meetings (three held so far: Cabrillo area, Natomas, Tahoe Park). - Storm Drainage Rate Proposal: Proposed structure change from room count/gross parcel area to impervious area basis, plus a rate adjustment that would require a mail ballot election. A surgical change for vacant parcels (charging 20% of area) would be brought to council in January 2016. The storm drainage rate is higher than neighboring communities due to older infrastructure, a mandatory combined system, and 104 pumped basins out of 135. - Best Practice Replacement Cycle: City Manager’s scenario to achieve a 100-year replacement cycle for water, wastewater, and storm drainage systems, with associated annual rate increases (red dots on slides) – not a formal proposal. - Return on Investment (Dan Sherry): Detailed capital improvement program (CIP) for FY17–20: Water $265.5 million (including $230M for meter retrofit), Wastewater $53.5 million (including $28M for McKinley Park underground storage for combined sewer overflow), Storm Drainage $58 million (including corrugated steel pipe replacement and detention basins). Presenter emphasized regulatory compliance risks and potential fines if rate adjustments are not approved. - IT Master Plan (Rod Van Buskirk, consultant): Critical need to replace the customer service/billing system (CIS) as it is obsolete and risky. Other priorities: GIS, work management, capital asset planning, cybersecurity. - Utility Rate Assistance Program (Susan Goodison): Currently 1,600+ enrolled (increase of 100 since October); 4,500 applications received (about 25% of eligible households). Program funding would be exhausted by FY19 without rate increases. Proposed outreach includes partnering with SMUD to identify eligible customers. - Prop 218 Process: Notice mailed December 2, 2015; 45-day protest period ends mid-January; public hearing before URAC on January 27, 2016. Written protests by a majority of property owners would block the rates. Commissioners asked about ballot timing and consequences of failure. - Commission Questions/Comments: - Commissioner Horner requested that the January 27 presentation include a reminder of when last rate increases occurred to correct misinformation. - Commissioner Biering noted the new website should list URAC meetings and council dates; questioned impact of rate delay on meter rollout and tiered rate structure (Bill Busath said it would likely delay tiered rates). - Commissioner Butcher asked about community meeting turnout (low but with follow-up via newsletters) and suggested targeting underserved areas like Oak Park and MacRoad; also asked about permeable pavement incentives (under development as a fee mitigation credit). - Commissioner Day asked about documentation required for rate assistance (SMUD verification or wage proof at 200% poverty level) and turnout at meetings. - Commissioner Biering also asked about Prop 218 protest procedures (clarified by Deputy City Attorney Joe Robinson: only written protests counted, past protests were less than 1%). 2. Department of Utilities – Accountability Plan Update (Item 2) Bill Busath provided a brief update covering: - Bond Expenditures: On track to spend 85% of tax-exempt bond proceeds within three years (water deadline May 2016, wastewater June 2016). - Capital Program Dashboards: Available online; included in report. - Drought and Water Conservation: City is under a Governor’s mandate to conserve 28% from June 1 to end of February; currently at 32% conservation; municipal conservation at 40%. Expect to meet the target. Governor’s mandate extended to at least end of calendar year 2016, with potential reduction to 20%. - Rate Assistance: Already covered in previous item. The presentation concluded with a reminder that detailed information was in the meeting packet. Public Comments & Testimony - No members of the public submitted speaker slips or spoke during the public comment period. Key Outcomes - Consent Calendar Approved: Unanimous. - Received and Filed: Both discussion items (Rate Development Planning Update and Accountability Plan Update) were received and filed by the Commission. No formal votes were taken on the rate proposals; the Commission’s role is to review and make recommendations to the City Council. - Next Steps: The Prop 218 public hearing will be held on January 27, 2016. The Commission is expected to make final rate recommendations at that meeting, which will then go to City Council in February or March 2016. The storm drainage mail ballot is targeted for April 2016 with a potential effective date of July 1, 2016 (or FY18 if delayed). - Commissioner Requests: Staff to include historical rate context in the January presentation; add URAC and council dates to the outreach website; explore direct data sharing with SMUD for rate assistance enrollment; and continue developing a storm drainage fee mitigation credit program.

UTILITIES 25% · WATER MANAGEMENT 21% · BUDGET AND FINANCE 18% · PUBLIC ENGAGEMENT 6%
1542
NOV 23, 2015 · SACRAMENTO, CALIFORNIA · COMMUNITY POLICE REVIEW COMMISSION
Sacramento Community Police Commission Meeting – November 23, 2015

Date: Monday, November 23, 2015 Time: 6:00 PM – 7:11 PM Location: Sacramento City Hall, Council Chambers, 915 I Street, NCH Present: Les Simmons (Chair, pro tem), Clif Roberts (Vice-Chair, pro tem), Basim Elkarra, Betty Williams, Bill Knowlton, Cathy Thao, Dr. Ernest Uwazie, Mariana Sabeniano, Rick Jones, Rosalyn Van Buren, Tim Davis (SPOA) Staff: Francine Tournour (Director, Office of Public Safety Accountability), Matthew Ruyak (Assistant City Attorney), Phoebe Schueler (City Clerk’s Office) Guests: Mayor Kevin Johnson, City Manager John Shirey Consent Calendar - No items. The consent calendar was empty. Public Comments & Testimony - Ross Hendrick (public comment on matters not on the agenda) – Comments received and filed. (Note: The agenda listed the speaker as “Ross Hendrickx,” but the minutes record “Ross Hendrick.”) Discussion Items 1. Welcoming Remarks – Mayor Kevin Johnson and City Manager John Shirey - Received and filed. Both officials welcomed the commission and emphasized the importance of improving community-police relationships and public safety. 2. Commission Scope / Ordinance Review - Presented by Assistant City Attorney Matthew Ruyak. He outlined the purpose of the commission as defined in the ordinance: to provide recommendations to the mayor and city council on bias-free policing. He noted that attorney Jeff Massey would regularly assist the commission. Item received and filed. 3. Brown Act Training - Presented by Phoebe Schueler from the City Clerk’s Office. (Discrepancy: The agenda listed the contact as Wendy Klock-Johnson, but the minutes and subsequent training were delivered by Phoebe Schueler. The training covered the Brown Act requirements for open meetings.) Received and filed. 4. Member Introductions - Each commissioner introduced themselves. Item received and filed. 5. Selection of Commission Chair and Vice-Chair - Motion: Bill Knowlton/Mariana Sabeniano to elect Clif Roberts as Chair. Failed (vote not recorded in minutes). - Substitute motion: Betty Williams/Basim Elkarra to re-open nominations. Passed (7 yes: Simmons, Williams, Elkarra, Thao, Uwazie, Sabeniano, Jones; 4 no: Van Buren, Knowlton, Roberts, Davis). - Election of Chair: Les Simmons was elected Chair (motion by Betty Williams/Basim Elkarra; exact vote not separately recorded, but subsequent vice-chair vote indicates Simmons as Chair). - Election of Vice-Chair: Clif Roberts was elected Vice-Chair (motion by Basim Elkarra/Betty Williams; passed unanimously with 11 yes votes: Simmons, Williams, Elkarra, Thao, Van Buren, Knowlton, Uwazie, Sabeniano, Roberts, Jones, Davis). Key Outcomes - Chair: Les Simmons elected as Chair of the Sacramento Community Police Commission. - Vice-Chair: Clif Roberts elected as Vice-Chair. - No other actionable items – all discussion items were received and filed. - Public comment from Ross Hendrick was received and filed without further action. - Adjournment: The meeting adjourned at 7:11 PM. Note: There is a discrepancy in the meeting records regarding the Brown Act training presenter. The agenda indicated Wendy Klock-Johnson, but the minutes and actual presentation were by Phoebe Schueler. Additionally, the public comment speaker was spelled “Hendrickx” on the agenda but “Hendrick” in the minutes.

PROCEDURAL 28% · COMMUNITY ENGAGEMENT 21% · COMMUNITY POLICING 14% · POLICE POLICY REVIEW 12%
1543
NOV 19, 2015 · SACRAMENTO, CALIFORNIA · PRESERVATION COMMISSION
Sacramento Preservation Commission Meeting Summary - November 18, 2015

The Sacramento Preservation Commission met on Wednesday, November 18, 2015, at 5:30 PM in the New City Hall, 915 I Street Council Chambers. Commissioners present: Bounds, Hook, Moffitt, Fuller, Marshak; absent: Forrest, Piner. A quorum was established. The agenda included the consent calendar, two review-and-comment items (Railyards Specific Plan Amendment and Special Sign District for the Entertainment Sports Complex), public comments, member comments, and the Director's Report. Consent Calendar - Approval of Minutes of the October 21, 2015 Meeting: Commissioner Moffitt moved approval, seconded by Commissioner Moffat. The motion carried unanimously, with Commissioner Marshak abstaining (he was absent from the October meeting). Public Comments & Testimony - No public comments were made on agendized items. At the end of the meeting, a brief announcement about the upcoming Preservation Roundtable was given in place of public comment. Discussion Items - Item 3: P15-040 Railyards Specific Plan Amendment (Review and Comment) – Staff planner Teresa Haenggi presented a request to modify the boundaries of the Central Shops Historic District as part of a larger entitlement amendment for the Railyards project. The proposed changes would accommodate a Kaiser Permanente medical center and a Major League Soccer stadium. Commissioners asked about vehicular circulation, the fate of historic artifacts during remediation, and how the reduced residential capacity (from 10,000 to 6,000 units) aligns with the mayor's goal of 10,000 new downtown housing units. The applicant responded that the original density assumptions were unrealistic and that other projects would fill the gap. No action was taken; the item was for early input only. - Item 4: M14-004 Special Sign District for the Entertainment Sports Complex (Review and Comment) – Staff and applicant presented a proposed sign district covering multiple buildings (Travelers, Fruit, Ramona, Marshall, etc.). Key features include mandatory property owner participation, deed restrictions binding future owners, content guidelines managed by a private association, and a single sign manager. Commissioners discussed whether sign programs should incorporate Secretary of the Interior standards and suggested referencing the more specific Brief 25 guidance. No action was taken; the applicant indicated a return to the Commission in February 2016 for a recommendation. - Director's Report – Preservation Director Roberta Deering provided updates: ongoing commissioner recruitment; the December meeting will focus on the annual Certified Local Government report; and reminders about workshops and conferences. The report was received and filed. Key Outcomes - Consent calendar minutes approved. - Items 3 and 4 were reviewed and discussed only; no formal votes or recommendations were made. - Director's report received and filed. - Commissioner Marshak noted progress on the Hart Mansion rehabilitation (2131 H Street) by Burnett and Sons. - Commissioner Hook requested the 40th anniversary of the commission be placed on a future agenda. - An accidental quorum question was addressed; commissioners were reminded to avoid discussing commission business if a majority are present at a non-public event. - Meeting adjourned.

SIGNAGE REGULATION 39% · LAND USE PLANNING 18% · HISTORIC PRESERVATION 16% · PUBLIC PRIVATE PARTNERSHIPS 6%
1544
OCT 28, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Meeting - October 28, 2015

On October 28, 2015, the Sacramento Utilities Rate Advisory Commission (URAC) met at 5:30 p.m. in Council Chambers (915 I Street, 1st Floor). Commissioners present: Ryan McManus, Timothy Horner, April Butcher, and Chair Carolyn Veal-Hunter; absent: Brian Biering and Andrew Day. The meeting covered approval of prior meeting minutes, adoption of the 2016 meeting calendar, and a detailed presentation on the Water, Wastewater, and Storm Drainage Program Finance Plan, which included proposed rate adjustments for the next four fiscal years (FY17–FY20). No public comments on non‑agenda items were made. Consent Calendar - Approval of Minutes for September 23, 2015: Approved unanimously by the four present commissioners. Discussion Items - 2016 URAC Meeting Calendar: Approved unanimously. The calendar sets regular meetings on the fourth Wednesday of each month, with exceptions in November and December (moved to the second Wednesday) and an additional meeting on February 10, 2016, to accommodate rate hearings. - Department of Utilities Water, Wastewater, and Storm Drainage Program Finance Plan: Staff presented a comprehensive overview of the capital program and financial plan. Key highlights: - Accountability: Over‑delivery on prior rate‑funded projects (e.g., treatment plant $10M under budget, 28 miles of pipe rehab vs. 11 promised, 27 wells rehabbed). - Proposed Capital Program: $230M for water meter retrofits (41,000 meters, 76 miles of backyard main replacement), $30M for combined system improvements (McKinley Park storage), and $13M for storm drainage regulatory compliance and rehab. - Rate Proposals: Water – 10% annual increases; Wastewater – 9% annual increases; Storm drainage – 16% annual increases (first increase in 19 years) along with a rate structure change from room‑count to impervious area. - Financial Plan: Assumes mix of cash and debt (State Revolving Fund loans at 3% interest, tax‑exempt bonds at 5.75%). Aims to maintain 120 days of operating reserve and achieve cash‑funded capital programs after this four‑year period. - Rate Assistance: Existing program funded by 1% of general fund transfer; proposal to extend to storm drainage. Approximately 1,500 customers currently enrolled; staff seeking to expand outreach. - Regional Comparison: Water rates initially lower than peers; wastewater rates higher due to smaller rate base; storm drainage rates higher due to flat terrain and 105 pump stations. - Next Steps: Proposition 218 notice mid‑November to early December; city council workshop November 3; official rate hearing January 27, 2016; storm drainage mail‑back ballot in April 2016 (requires 50% + 1 of returned ballots for approval). Key Outcomes - Received and Filed: The Finance Plan presentation was received and filed by the Commission. No formal vote on rate increases was taken at this meeting; rates will be considered at a future hearing (January 27, 2016). - Commission Requests: For the December 9, 2015 meeting, the Commission requested: 1. A presentation from outreach consultant Crocker & Crocker on public communication plans. 2. Additional analysis of alternative rate scenarios or consequences of not approving the proposed rates (e.g., delay in accelerated meter program, failure to meet regulatory deadlines). - Adjournment: The meeting adjourned at 7:31 p.m.

PUBLIC FINANCE 22% · RATE INCREASES 21% · UTILITIES 14% · WATER MANAGEMENT 13%
1545
OCT 21, 2015 · SACRAMENTO, CALIFORNIA · PRESERVATION COMMISSION
Sacramento Preservation Commission Meeting - October 21, 2015

The Sacramento Preservation Commission held a regular meeting on October 21, 2015, at 5:30 PM (open session at 5:43 PM) in the New City Hall Council Chambers. The meeting focused on two intertwined projects: a mixed-use development at 2301/2305 K Street and the relocation of a landmark residential building to 1808 U Street. The commission approved both projects with conditions and heard public comments on parking, safety, and design concerns. Consent Calendar - Approval of Minutes: The commission unanimously approved the minutes from the September 16, 2015 meeting (5-0-2, with Commissioners Forrest and Marshack absent). - Director Report: The report was received and filed. The director noted this would be the last meeting with water pitchers provided and announced that Interim Planning Director Tom Pace had accepted a position as Deputy Planning Director for Stockton. Public Comments & Testimony - Nick Karas (property owner on J and 23rd Streets) expressed support for the project but raised concerns about the removal of three on-street parking spaces on 23rd Street, safety at the garage entrance, and the need for a light and siren at the driveway. - Kelly Karas (property owner and resident) supported the project but strongly opposed the loss of parking spaces, citing safety issues and the existing parking shortage in the area. - Patrick Stelmach (Preservation Sacramento) spoke in strong support of both the relocation and the new construction, praising the preservation approach and the design. - Ed Carroll (adjacent neighbor to the relocation site) expressed concerns about the placement of the relocated house, particularly the proximity of the trash enclosure and sidewalk to his property, and requested more input on the site plan. - Emily Fong (area resident) supported preservation but questioned where the two off-street parking spaces would be located for the relocated house and suggested better landscaping maintenance. - Bob Proctor (owner of adjacent property at 2309 K Street) expressed concern about how the project would address the encroachment of a large redwood tree onto the new building's foundation. Discussion Items - PB15-055 K Street Mixed Use (Item 3): Staff presented a proposal for a 17,152-square-foot, three-story mixed-use building with 1,654 square feet of retail and 8 residential units at 2301/2305 K Street. The project required an environmental exemption, preservation review to move the landmark building, and site plan/design review. The design features a curvilinear glass corner, a grillage element, and retention of a redwood tree. The commission discussed materials, the stair tower, and the relationship between the ground-floor retail and the upper floors. The motion to approve included added conditions from the Sacramento Police Department. - PB15-056 Landmark Relocation (Item 4): The relocation of the 900-square-foot Crossman-Negro-Schaefer House from 2305 K Street to 1808 U Street was presented. The owner, Karen Jacques, detailed the reconstruction of the porch based on documentation from the previous owner, Marilyn, and the plan to restore the chimney with salvaged bricks. The project includes a new foundation and a rear addition that meets Secretary of Interior standards. The commission approved the motion with an updated exhibit showing the porch stair details. Key Outcomes - Item 3 (K Street Mixed Use): Approved (4-0-3, with Commissioners Forrest and Marshack absent, Commissioner Piner recused). The motion carried with staff recommendations and added conditions from the police department regarding security and access. - Item 4 (Landmark Relocation): Approved (4-0-3, same vote). The motion included the updated exhibit for the porch reconstruction. - Director Report: Received and filed. - Member Comments: Commissioner Huck announced a social hour for the commission's 40th anniversary on October 30 at the Empress Tavern. - Adjournment: The meeting adjourned at 7:35 PM.

HISTORIC PRESERVATION 19% · URBAN DESIGN 17% · LAND USE PLANNING 11% · HISTORICAL PRESERVATION 11%
1546
SEP 23, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Meeting – September 23, 2015

The Sacramento Utilities Rate Advisory Commission (URAC) met on Wednesday, September 23, 2015, at 5:30 p.m. in the Council Chambers at 915 I Street. The commission approved the consent calendar, clarified the list of current URAC members, received an update on tiered water rates, and held a detailed workshop on the storm drainage system’s financial and infrastructure challenges. No public comments were made. Consent Calendar - Item 1 – Approval of Minutes (September 9, 2015): Approved unanimously on a motion and second, with all five commissioners voting yes (Brian Beering, Ryan McManus, Timothy Horner, April Butcher, Andrew Day; Carolyn Veil Hunter absent). Discussion Items - Item 2 – Current URAC Commissioners: Staff clarified that the new commissioners appointed are Andrew Day and Ryan McManus (not John Matthias, whose name had been erroneously announced earlier). The clarification was received and filed. - Item 3 – Tiered Water Rates (presented by Bill Busath, Director of Utilities): The city is committed to conservation pricing but faces two constraints: (1) only 55% of customers are metered (45% on flat rates), and (2) a recent court decision (San Juan Capistrano) struck down tiered rates that lacked a nexus to actual costs. The city is not planning a tiered rate proposal for FY 2017 but is hiring a consultant to develop a legally defensible structure for possible implementation in FY 2018. Commissioner Ryan McManus asked whether a full cost‑of‑service analysis would precede the tiered design; staff confirmed the rate change would be revenue‑neutral. - Item 4 – Storm Drainage Workshop (presented by Susan Goodison, Business Services Manager, and Brett Grant, Supervising Engineer): - Financial State: No rate adjustment since 1996. Current operating expenditures are projected to exceed revenues, with a $850,000 capital appropriation for FY 2016. Without rate changes, the fund balance is expected to be fully depleted within six years (by 2021). The fund also risks violating a 1.25 × debt service coverage ratio on an IBank loan, which could trigger a mandatory rate increase process under Proposition 218. - System Overview: 135 drainage basins (104 pumped), 842 miles of pipeline, 420 miles of creeks/channels, 62 flood‑control basins. Only 53 of 135 basins have completed master plans, identifying over $200 million in needed improvements. The current pipe replacement cycle is one every 2,884 years. - Proposed CIP (FY 2018‑21): $48.1 million total, including $11 million for regulatory projects, $9.3 million for rehabilitation, and $18 million for improvements. Investment would add an estimated 128 jobs and $19.8 million to the local economy. - Next Steps: Financial plan to be presented October 28, with a follow‑up meeting in early November. Prop 218 notice would be mailed in November, public hearing in January, and council action in mid‑spring. Storm drainage rate adjustments require voter approval. Public Comments & Testimony - No members of the public spoke. Key Outcomes 1. Consent Calendar – Approved. 2. Commissioners Clarification – Received and filed. 3. Tiered Water Rates – City will not propose tiered rates for FY 2017; consultant to develop a defensible structure for FY 2018. 4. Storm Drainage Workshop – Presentations and discussion received; staff will return with a detailed financial plan on October 28, 2015. 5. Adjournment – The meeting adjourned at 6:27 p.m.

DRAINAGE FUND 23% · WATER MANAGEMENT 20% · PROCEDURAL 19% · INFRASTRUCTURE 16%
1547
SEP 16, 2015 · SACRAMENTO, CALIFORNIA · PRESERVATION COMMISSION
Sacramento Preservation Commission Meeting: SMUD HQ Rehab Review and Comment, September 16, 2015

The Sacramento Preservation Commission met on Wednesday, September 16, 2015, at 5:30 p.m. in the Council Chambers at New City Hall, 915 I Street, Sacramento. The meeting was called to order at 5:38 p.m. All seven commissioners were present, with Chair Eric Fuller and Commissioner Caru Bowns arriving late (at 5:55 p.m. and 5:47 p.m., respectively). Vice Chair Chad Moffett presided until Chair Fuller arrived. The commission reviewed the rehabilitation of the SMUD Headquarters, a National Register-listed property, as a courtesy review and comment item, approved the prior meeting minutes, and received the Preservation Director's report. The meeting adjourned at 6:47 p.m. Consent Calendar - Approved minutes of August 19, 2015, on a motion by Commissioner Marshack, seconded by Commissioner Piner, with a 5:0:2 vote; Commissioners Fuller and Bowns were absent at the time (5:0:2; absent: Fuller, Bowns). Director Report - Preservation Director Roberta Deering reported an appeal by Unite Here Local 49 of the Commission's decision on the Hyatt Boutique Hotel; the appeal will go to City Council (date not set). - Announced that the Sacramento Register's August 2015 update is online, and the California Historic Properties Directory is being integrated with Sacramento City listings. - The report was received and filed. Discussion Items: DR15-177 SMUD HQ Rehab - Staff and applicant presentations. Staff noted this was a courtesy review and comment because the property is on the National Register, not the Sacramento Register; no final action was taken. - Project description: Rehabilitate SMUD Headquarters, including a 20,000 sq ft addition to the building's central core; 147,400 +/- sq ft office building, 50,300 +/- sq ft attached parking structure, and approx. 404 surface parking spaces on 19.7 acres in C-4 zone. Listed National Register in 2010. - Applicant team: SMUD (Steve Johns, Doug Norwood), Dreyfuss & Blackford Architects (Chris Barkley), and Calender Associates (Ben Woodside) presented. They emphasized meeting Secretary of Interior Standards, preserving mid-century modern character, addressing seismic/ADA/fire/life-safety deficiencies, hazardous materials abatement, and sustainability, including water-efficient landscaping. - Ex parte disclosures: Commissioner Moffett met with SMUD on Sept. 2; Commissioner Marshack met with SMUD on Sept. 3; Commissioner Piner drove around the site on Sept. 3. - Commissioner questions/comments: - Commissioner Marshack asked whether SMUD would consider Sacramento Register listing; SMUD said it would take that to executives/board. He also raised visitor bike parking, pathway alignment, and questioned the replacement of terrazzo walkways and extensive vegetation removal; he encouraged listing, visible visitor bike parking, and preserving the curved pathway alignment. - Commissioner Piner questioned the performance of interior shading for new west-facing glass at the core expansion; he commended thorough work but was curious about long-term energy performance. - Commissioner Bowns asked about heritage tree protection and public access for the self-guided arborist tour; the landscape architect confirmed protection and rehabilitation of the tour with digital apps. - Commissioner Huck asked about restoration of removed historic elements; the team cited wood tables/benches to be remilled from a removed redwood. - Staff comment (Roberta Deering) praised the design as respectful of historic character and comparable to award-winning additions elsewhere. Public Comments – Matters Not on the Agenda - None. Member Comments - Commissioner Marshack raised concern that National Register-listed properties are not automatically reviewed with approval authority by the Commission, since the Sacramento Register listing criteria are less rigorous than National Register criteria; he suggested future deliberation on aligning review authority for historic resources. - Commissioner Fuller echoed the concern about the dichotomy. Key Outcomes - The commission reviewed and commented on the SMUD HQ rehabilitation; no formal approval was given (review and comment only). - The commission approved the August 19, 2015 meeting minutes. - The Director Report was received and filed. - No public comment was received for non-agenda items. - Commissioners agreed to consider the issue of National Register versus Sacramento Register review authority at a future date.

HISTORIC PRESERVATION 50% · ARCHITECTURE 32% · PROCEDURAL 6% · URBAN FORESTRY 6%
1548
SEP 9, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Workshop on Water and Wastewater – September 9, 2015

The Utilities Rate Advisory Commission (URAC) met on Wednesday, September 9, 2015, at 5:30 p.m. in the Council Chambers at 915 I Street, Sacramento. The meeting featured a detailed workshop from the Department of Utilities on water and wastewater commodity programs, capital improvement plans, and financing approaches. The commission approved the previous meeting's minutes and elected a new vice chair. Consent Calendar - Approval of Minutes (August 26, 2015): Approved unanimously by roll call vote (6-0). The minutes' cover date was corrected to September 9, 2015, and the staff contact was updated. Discussion Items - Selection of New Commission Vice Chair: Commissioner Timothy Horner was nominated by Commissioner April Butcher and seconded by Commissioner Brian McCannis. Horner accepted and was elected by unanimous roll call vote. Horner succeeded the previous vice chair. - Introduction of New Commission Members: Two new commissioners were introduced: Ryan Vander Weil and Andrew Day. A third new member, John Mathis, was not present. Each expressed enthusiasm for serving the community. - Department of Utilities Water & Wastewater Workshop: - Overview & Strategic Plan (Mike Malone): Presented the department's mission, vision, core values (customers, environmental stewardship, compliance, infrastructure investment, cost efficiency), and recent achievements: advanced metering infrastructure (AMI), pipeline assessment, well rehabilitation, combined system storage (3.8 million gallon Oak Park facility), community outreach (500+ web portal sign-ups), security master plan, and emergency preparedness. - Accountability & Financial Stewardship (Susan Goodison): - Water CIP: Expected expenditures from 2013 bond program: $239.5 million raised with only $215 million in debt (due to bond premium). Program delivery exceeded projections: 28 miles of pipeline replacement completed (vs. 11 projected), 27 groundwater wells rehabbed (vs. 6 projected). FY16 water CIP investment: $23 million (no rate adjustment), with $20 million directed to accelerated meter program. - Wastewater CIP: Combined system rehab: 2.5 miles completed. FY16 wastewater CIP investment: $11 million from fund balance. - Grant Funding: $7.7 million secured in the last three years (on top of $6.4 million previously). A new grant manager position was filled. - Credit Ratings: Water bonds rated AA- (S&P, Fitch); wastewater bonds rated AA (Fitch). - Water System Overview (Michelle Carey): - Supply: 80-85% from rivers (American and Sacramento treatment plants), 15-20% from groundwater wells. Key programs: meter acceleration (deadline 2025, accelerated to 2020 with $230 million additional funding contingent on approval), rehab of aging infrastructure (many pipes 100 years old), regulatory compliance, and security upgrades. - Challenges: Aging pipes (tuberculated cast iron reducing fire flow), treatment plant rehab (Sacramento plant built 1920s, Fairburn 1960s), well rehabilitation neglected for decades, IT/billing system nearing obsolescence, security improvements recommended by Homeland Security. - Proposed 4-year water CIP (FY17-20): $265.5 million, including $230 million for meter program, $18 million for rehab/replacement (8.5 miles of distribution main), $7.5 million for security/emergency preparedness, and $2 million in operating support. - Wastewater System Overview (Brett Grant): - System: 35% maintained by outside agency; combined system (central city) conveys both wastewater and stormwater; separated system (41 basins) with 8 gravity basins and 35 pumped basins (higher cost). - Combined Sewer Improvement Plan (adopted 1995): $150 million spent to date; goal of zero flooding in a 10-year storm. Updated 30-year plan identifies 29 projects costing $280 million (mostly underground storage). - Challenges: Pipes 100 years old (some brick), leaky pipes/inflow/infiltration (e.g., Pocket area), backyard easements, flat terrain requiring pump stations, need for master planning (8 of 41 basins completed), security. - Proposed 4-year wastewater CIP (FY17-20): $53.5 million, including $30 million for combined sewer improvement, $13 million for critical rehab, IT/security, and $1.3 million in operating support. - Financing Approach (Susan Goodison): - Development of financial plan ongoing; guiding principles: mix of bond/cash/grant funding, self-contained debt (paid by rate adjustments), rate smoothing, pursuit of grants. - Revenue assumptions consider conservation impacts (every 10% conservation reduces water fund revenue by $3 million per year), cost drivers (labor, pension/OPEB changes), and efficiency gains (solar panels, alternative fuel vehicles). - Benefits of continued investment: local control, 711 jobs and $109.8 million economic benefit from water program, 143 jobs and $22 million from wastewater program. Risks of underfunding: loss of local control, public health/safety impacts, impaired service delivery. - Proposed next steps (draft): Further URAC workshops, city council discussions, and eventual presentation of final financial plan for rate adjustment consideration. Key Outcomes - Consent Calendar: Approved unanimously. - Vice Chair Election: Timothy Horner elected vice chair by unanimous vote. - Workshop Received and Filed: The commission received and filed the Department of Utilities Water & Wastewater workshop presentation. No formal action was taken on the financing plan; it will be brought to a future meeting. - Commissioner Requests: - Future presentations to include printed handouts for note-taking (requested by Commissioner Butcher). - Financial plan to show working capital impact (target 120 days), scenario analysis for interest rates and reserves, and clarification on project budget assumptions (conservative vs. aggressive). - Grant funding opportunities and past performance to be shared at subsequent meetings. - Next Steps: The Department will continue developing the financial plan and return to URAC with a detailed proposal. The commission will hold additional workshops on the rate adjustment process later in fall 2015.

WATER MANAGEMENT 32% · BUDGET AND FINANCE 31% · UTILITIES 17% · PROCEDURAL 9%
1549
AUG 26, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Meeting - August 26, 2015

The Utilities Rate Advisory Commission (URAC) met on Wednesday, August 26, 2015, at 5:30 p.m. in the Council Chambers at 915 I Street, Sacramento. The meeting covered updates on the Department of Utilities' accountability plan, financial status, and rate development planning. Commissioners discussed water conservation achievements, the accelerated meter program, and the upcoming rate adjustment process. The meeting also recognized Commissioner Steven Archibald for his service since the commission's inception in 2008. Consent Calendar - Approval of Minutes for May 27, 2015: Approved unanimously (4-0, with Commissioners Kevin Schubert and April Butcher absent). Discussion Items - Department of Utilities Accountability Plan Update: Bill Busath, Utilities Director, reported on community outreach, meter construction (one of the most intense periods), bond expenditures (bonds sold March 2013 requiring 85% spend by March 2016), and drought conservation. Conservation achievements: 34% reduction in June, 35% in July, on track for 32-33% in August, cumulatively meeting the governor's 28% mandate. The My Water customer web portal was launched for the first 11,000 customers. Commissioner Archibald commended the portal's rollout. - Department of Utilities Financial Update: Susan Goodison, Business Services Manager, presented the FY2015/16 adopted budget. No rate increases were included; revenues assumed 20% conservation (each 10% conservation reduces water fund revenue by $3 million). A $2.3 million augmentation was approved for 13.5 new FTEs, primarily for the accelerated meter program and conservation efforts. The water fund's beginning balance was approximately $41 million, with a planned $16.6 million use for capital improvements, leaving an ending balance of $24.4 million (138 days of working capital, above the 120-day guideline). Commissioner Archibald discussed pay-as-you-go capital funding variability. - Department of Utilities Utility Rate Development Planning Update: Goodison outlined the rate development process (data collection, cost drivers, financial plan) and proposed timeline: Proposition 218 notice mailed in November 2015, public hearing at URAC in January 2016, City Council consideration in spring 2016 for FY2017 rates. A four-year rate increase for water and wastewater is under consideration (storm drainage, unchanged since 1996, would require voter approval). Staff clarified they are not currently proposing tiered rates due to uncertainty from the San Juan Capistrano ruling and the city being only 55% metered; target is to be 90% metered by end of FY2018 before introducing tiers. Commissioners requested a revisit of rate structure options at the September 9 workshop. Key Outcomes - Consent calendar approved (Item 1). - All discussion items (Items 2-4) received and filed. - Staff committed to providing additional information on tiered rate structures and the impact of the San Juan Capistrano ruling at the next meeting (September 9, 2015). - The next workshop (September 9) will cover water and wastewater system overview and capital needs, not specific financial proposals. - Commissioner Steven Archibald was recognized for his service; he attended his last meeting.

BUDGET AND FINANCE 40% · PUBLIC WORKS 30% · WATER MANAGEMENT 19% · PROCEDURAL 9%
1550
MAY 27, 2015 · SACRAMENTO, CALIFORNIA · UTILITIES RATE ADVISORY COMMISSION
Utilities Rate Advisory Commission Meeting – May 27, 2015

The Utilities Rate Advisory Commission met on Wednesday, May 27, 2015, at 5:33 p.m. in Council Chambers, 915 I Street, Sacramento. The meeting included a consent calendar, three discussion calendar items, and a staff update on the solid waste rate assistance program. All discussion items were received and filed by the commission. Consent Calendar - Approval of Minutes for April 22, 2015: Approved unanimously (4–0, with two members absent). Discussion Items - Department of Utilities Accountability Plan Update: Director Bill Busath presented updates on community engagement for capital projects, drought response, water conservation, and the rate assistance program. Key points included: - The city must achieve 28% water conservation under the governor’s executive order; conservation was 24% in April and tracking near 30% in May. - If 28% is not met by mid-July, staff will recommend moving to Stage 3 (one-day-per-week watering). - The rate assistance program has 1,250 participants; $6 million of the $7 million fund was returned to the general fund due to low demand. - A separate meter acceleration program (starting FY16) will fund approximately $230 million in meter retrofits over four years. - Commissioners asked about enforcement (first violation is a warning, escalating to $1,000) and education on watering practices; staff will develop educational materials. - Department of Utilities Financial Update: Susan Goodison presented FY2014/15 year-end projections and FY2015/16 budget preview. Highlights: - Revenue assumptions: every 10% conservation reduces water fund revenue by $3 million; FY15 budget assumed 20% conservation ($6 million reduction). - FY15 projections show higher revenues and lower expenses (savings in chemicals, utilities, bad debt) than budgeted. - FY16 budget assumes no rate adjustments and 20% conservation; additional 8% conservation would reduce revenues by $2.4 million, which could be addressed in a mid-year adjustment. - Commissioners requested detailed budget breakdowns and clarification on surplus fund balances (water, wastewater, storm drainage). - Department of Utilities Utility Rate Development Planning Update: Bill Busath outlined the rate development timeline and storm drainage rate implementation. Key points: - Storm drainage has not had a rate increase since 1996; a rate increase will require a majority vote of property owners via mailed ballot (planned for 2016). - Staff proposes changing the rate structure from room-count to impervious surface area for better nexus. A surgical change for vacant parcels (currently overcharged) is expected soon. - A tiered water rate structure study will begin, with a proposal expected in FY18 after more meters are installed. Member Comments & Staff Update - Solid Waste Rate Assistance Program: Erin Treadwell (Department of General Services) reported that City Council approved a rate assistance program for solid waste, piggybacking on the Department of Utilities’ existing program. Eligible accounts will automatically receive the discount, adding approximately $1.07–$2.40 per month to bills over three years. Key Outcomes - All three discussion items were received and filed by the commission. - Staff will provide the commission with detailed budget presentations, including fund balance surplus calculations and side-by-side scenarios for varying conservation levels. - The meeting adjourned at 6:50 p.m.

BUDGET AND FINANCE 40% · UTILITIES 27% · WATER MANAGEMENT 9% · PUBLIC OUTREACH 8%
OPENPUBLICA · PUBLIC MEETING INDEXUPDATED DAILY · openpublica.com